![]() |
![]() |
|
|
5931 Available Projects
From November 3, 2002 to Today
Contractors: please click on Login button above to login and submit bids on these projects.
Column heading buttons: click on the one you wish to sort by (e.g. click on RC to see all commercial jobs first and residential jobs second, or click on State button to sort by State, etc.).
Column Definitions: ID=Reference Number, IE=Interior/Exterior, RC=Residential/Commercial, P=Paint Walls/Trim/Both, D=# of Doors, Win=# of Windows, OB=Overhang/Baseboard paint Yes/No, W=Width in feet, L=Length in feet, H=Height in feet, Q=Quality Low/Medium/High.
Results Page(s) (100 per page): 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60
| ID | City | State | IE | RC | P | D | Win | OB | W | L | H | Q | Posted | |||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | ||||||||||||||||
| 6224 | MANASSAS | VA | I | R | W | 0 | 0 | Y | 0 | 0 | 0 | H | 2009-05-04 | |||
| Intrested in getting the entire house painted with 5 different flat colors. 4 bedrooms, family room, living room, dinging room, basement and 3 bathrooms (including hall . Family room has 2 story ceiling which is approximately 18 feet high. | ||||||||||||||||
| 6223 | SAN FRANCISCO | CA | I | C | W | 2 | 2 | Y | 100 | 100 | 85 | M | 2009-05-02 | |||
| We need to paint the store inside some walls and ceiling. Also some parts on the outside facade of the store. 1100 Sq Foot total area. | ||||||||||||||||
| 6222 | NEWARK | CA | E | R | B | 1 | 8 | Y | 50 | 50 | 10 | M | 2009-05-02 | |||
| Exterior paint on single story Eichler. Stucco exterior. | ||||||||||||||||
| 6221 | SAINT CLAIR SHORES | MI | E | R | B | 2 | 11 | Y | 20 | 37 | 25 | M | 2009-04-30 | |||
| Two story bungalow. Wood siding needs to be scrapped and painted. There used to be vinyl siding over the wood. I need the home painted one color and the trim painted another. Approx. 1300 sq ft. | ||||||||||||||||
| 6220 | EAST | TN | I | R | B | 0 | 0 | Y | 16 | 18 | 9 | H | 2009-04-29 | |||
| Room needs to be primed has some water stains then painted..walls, trim AND ceiling | ||||||||||||||||
| 6219 | LITTLE ELM | TX | I | R | B | 3 | 2 | Y | 60 | 45 | 12 | M | 2009-04-29 | |||
| need the cieling painted as well they have steep vault to them i need a quote for interior only and also interior and extererior | ||||||||||||||||
| 6218 | LITTLE ELM | TX | I | R | B | 3 | 2 | Y | 60 | 45 | 12 | M | 2009-04-29 | |||
| need the cieling painted as well they have steep vault to them | ||||||||||||||||
| 6217 | OXNARD | CA | I | R | B | 6 | 0 | Y | 0 | 0 | 0 | M | 2009-04-29 | |||
| paint interior of 1300 sq feet house | ||||||||||||||||
| 6216 | CEDARVILLE | MA | E | R | B | 2 | 13 | Y | 36 | 40 | 30 | M | 2009-04-28 | |||
| large cape to be painted front and all trim | ||||||||||||||||
| 6215 | BAYONNE | NJ | E | R | B | 0 | 0 | N | 0 | 0 | 0 | H | 2009-04-28 | |||
| I need 2 separate estimates. one is for fire escape only, and the other would include the exterior of the house. | ||||||||||||||||
| 6214 | TOPEKA | KS | E | R | B | 1 | 7 | Y | 24 | 42 | 18 | H | 2009-04-28 | |||
| 6213 | COVINGTON | GA | E | R | B | 0 | 11 | N | 15 | 40 | 30 | M | 2009-04-27 | |||
| This is a 2 story 1900sqf house in Covington. The paint is in good shape we really just need a quick job to re-caulk the Hardiplank seams and make the finish uniform. Thanks, Dan | ||||||||||||||||
| 6212 | COVINGTON | GA | E | R | B | 0 | 11 | N | 15 | 40 | 30 | M | 2009-04-27 | |||
| 6211 | EVANSTON | IL | I | R | W | 0 | 6 | N | 30 | 141 | 8 | H | 2009-04-26 | |||
| 10x15 ceiling, 360 sq.ft wall in bedroom (8'x 45' around room- 2 windows), 500 sq.ft of wall in lower TV room, 400 sq.ft in living room | ||||||||||||||||
| 6210 | TOLEDO | OH | I | R | B | 4 | 19 | Y | 123 | 232 | 12 | M | 2009-04-24 | |||
| i need a to paint my new rented apartment | ||||||||||||||||
| 6209 | HINGHAM | MA | E | R | B | 2 | 24 | Y | 120 | 30 | 17 | H | 2009-04-21 | |||
| 6208 | TURNER | OR | E | R | B | 3 | 19 | Y | 54 | 30 | 30 | H | 2009-04-17 | |||
| New construction two story home, hardi plank siding pre primered approx. 2632 sq ft of living space. Siding will be completed next week. | ||||||||||||||||
| 6207 | FORT COLLINS | CO | I | R | W | 1 | 2 | N | 16 | 18 | 8 | M | 2009-04-15 | |||
| 6206 | VIENNA | VA | I | R | W | 0 | 0 | Y | 10 | 10 | 13 | H | 2009-04-14 | |||
| Take wallpaper strip off and repaint bedroom | ||||||||||||||||
| 6205 | MORAGA | CA | E | R | B | 0 | 0 | Y | 100 | 200 | 25 | H | 2009-04-13 | |||
| 6203 | ARLINGTON | VA | I | R | B | 16 | 9 | Y | 36 | 35 | 8 | H | 2009-04-13 | |||
| Prep for sale. 1240 interior sq foot townhouse, 3 storey in Ballston VA. 3 bedroom & walk-in closet, kitchen, living area, stairwell. Also drywall repair of ceiling in living area. Immediate start required. | ||||||||||||||||
| 6202 | PLANO | TX | E | R | B | 0 | 0 | N | 0 | 22 | 0 | M | 2009-04-13 | |||
| I would like an estimate for epoxy coating my garage floor. I would also like to use flakes and a final clear coat. I have a three car garage that is 29 feet by 22 feet. | ||||||||||||||||
| 6201 | EDINA | MN | E | R | B | 1 | 5 | Y | 30 | 30 | 35 | M | 2009-04-13 | |||
| I'm ball-parking on the width and height, since I haven't measured yet, but we are interested in having the front of our house (no sides) painted. Currently, we have unpainted cedar shakes on the front of our that do not match the rest of our siding. We | ||||||||||||||||
| 6200 | OCEAN SPGS | MS | E | R | B | 2 | 10 | Y | 25 | 45 | 15 | H | 2009-04-11 | |||
| Brown tri-level cedar siding house-my best guess is about 2,000 sq ft of wood surface to paint -need 2 doors. since tri level I guessed an avg height. about 10 windows and all of it the same color except for 2 doors. | ||||||||||||||||
| 6199 | OLATHE | KS | E | R | B | 0 | 0 | Y | 30 | 30 | 15 | M | 2009-04-10 | |||
| parts of front of house brick, no paint needed. half duplex. | ||||||||||||||||
| 6198 | ORANGE CITY | FL | I | R | T | 24 | 0 | Y | 0 | 900 | 4 | H | 2009-04-09 | |||
| 7 new metal doors, 14 bi folds, 3 old repaint doors. 580 ft of 4'' base 320ft of crown 225 ft 0f toe edge. 16 ft long beam 2 8ft collums square | ||||||||||||||||
| 6197 | ORANGE CITY | FL | I | R | T | 24 | 0 | Y | 0 | 900 | 4 | H | 2009-04-09 | |||
| remodle with new pre primed base and crown and 2 raw multi door entry ways | ||||||||||||||||
| 6196 | GRANITE SHOALS | TX | I | R | W | 0 | 0 | N | 0 | 0 | 0 | M | 2009-04-07 | |||
| I have the paint. The job is 336 sqft. No prep, fresh drywall and texture. Shoot me a price. | ||||||||||||||||
| 6195 | EDISON | NJ | E | R | B | 2 | 12 | Y | 40 | 30 | 8 | M | 2009-04-05 | |||
| small 1 car attached garage | ||||||||||||||||
| 6194 | CLEVELAND | OH | I | C | B | 28 | 10 | N | 0 | 0 | 0 | H | 2009-04-05 | |||
| about 9,000 sq ft. ceilings painted as well...chair rail splits all rooms....scrubbale paint underneath chair rail and eggshell above | ||||||||||||||||
| 6193 | DANBURY | CT | I | R | B | 0 | 8 | Y | 49 | 44 | 8 | M | 2009-04-04 | |||
| Existing paint is not peeling or unfinished - just needs a fresh paint job - neutral over existing neutral color. 3 rooms - 14 x 11 x 8, 14 x 19 x 8, 21 x 14 x 8, (so total the way this site requested would be 49 x 44 x 8). All would be painted the same o | ||||||||||||||||
| 6192 | HAPPY VALLEY | OR | E | R | B | 2 | 12 | Y | 60 | 30 | 10 | M | 2009-04-04 | |||
| About 30 feet is 15 feet high. Rest is 10 ft. high | ||||||||||||||||
| 6191 | ANNAPOLIS | MD | E | R | B | 4 | 3 | Y | 0 | 0 | 0 | H | 2009-04-02 | |||
| condo 1030 sq feet..has been freshly painted standard off white.walls good shape.doesnt need primer just color throughout w semi gloss white trim throughout and flat white ceilings | ||||||||||||||||
| 6190 | ANNAPOLIS | MD | I | R | B | 4 | 3 | N | 0 | 0 | 0 | H | 2009-04-02 | |||
| I have a 1,030 square foot condo ...just bought it.It has been re-painted standard all off white.I want to change colors throughout condo ..have semi-gloss white trim and flat white ceilings. | ||||||||||||||||
| 6189 | OAK PARK | IL | E | R | B | 2 | 12 | Y | 22 | 40 | 25 | H | 2009-03-31 | |||
| Bungelow 3 colors | ||||||||||||||||
| 6188 | BLACK WALNUT | MO | I | R | B | 2 | 3 | Y | 12 | 16 | 8 | M | 2009-03-30 | |||
| 6187 | CEMENTVILLE | IN | I | C | B | 99 | 83 | Y | 80 | 250 | 25 | H | 2009-03-30 | |||
| 19,000 square foot medical facility. Need all painting bid, interior and exterior. Dwgs are at Evansville blueprint or on the job site at 4592 roslin Rd newburgh in | ||||||||||||||||
| 6186 | DAVENPORT | FL | I | R | B | 15 | 25 | Y | 38 | 38 | 9 | M | 2009-03-27 | |||
| Home is about 3000 sq. ft.It is one of the Park Square vacation villas. Varying heights of walls. There is no window trim. All rooms will be the same color, around an eggshell white hue. It is only 2-3 yrs. old. I would like a quote for low and medium. T | ||||||||||||||||
| 6185 | ASHBURN | VA | I | R | B | 0 | 0 | Y | 60 | 30 | 9 | M | 2009-03-27 | |||
| I would like my entire house painted. It is a single family home with about 3200sq ft of living area. All the walls and the trim(only 2rooms has the trim)has to be painted. | ||||||||||||||||
| 6184 | DAVENPORT | FL | I | R | B | 15 | 25 | Y | 38 | 38 | 9 | L | 2009-03-26 | |||
| Home is about 3000 sq. ft.It is one of the Park Square vacation villas. Varying heights of walls. There is no window trim. All rooms will be the same color, around an eggshell white hue. It is only 2-3 yrs. old. I would like a quote for low and medium. Th | ||||||||||||||||
| 6183 | DISTRICT HEIGHTS | MD | I | R | B | 9 | 6 | Y | 100 | 100 | 0 | M | 2009-03-25 | |||
| I have a 3 bedroom 3 level townhome. Looking to paint master bedroom, 2 small bedrooms, living room, dining room, kitchen, basement, 2 staircases, and 3 small bathrooms. Colors have been selected. Want glossy in kitchen and bathrooms. Little prep work | ||||||||||||||||
| 6182 | CO SPGS | CO | E | R | W | 6 | 12 | Y | 15 | 12 | 12 | L | 2009-03-25 | |||
| 6181 | CHARBONNEAU | OR | I | R | W | 0 | 4 | N | 35 | 30 | 20 | H | 2009-03-23 | |||
| Paint hallway, living and dining room | ||||||||||||||||
| 6180 | W CHESTER | PA | E | R | T | 0 | 0 | N | 0 | 0 | 0 | M | 2009-03-23 | |||
| I live on 1/3 of an acre & have a white wooden fence that goes around 3 sides of the back of my property. The fence needs to stripped the old paint is peeling & needs to be removed)& painted by the end of April. I want it done well (don't want to have t | ||||||||||||||||
| 6179 | SYLVANIA | OH | I | R | W | 0 | 0 | N | 10 | 8 | 10 | H | 2009-03-20 | |||
| bathroom, needs wallpaper removed, | ||||||||||||||||
| 6178 | CHULA VISTA | CA | I | R | B | 2 | 4 | Y | 20 | 20 | 11 | M | 2009-03-19 | |||
| looking for kitchen ,dining, and living room to be lightly prep and painted. Will only pay under 1K for the job. | ||||||||||||||||
| 6177 | LEON | KS | E | R | B | 3 | 9 | Y | 24 | 70 | 12 | M | 2009-03-18 | |||
| Need outside of home painted - including eaves | ||||||||||||||||
| 6176 | NAPLES | FL | I | R | B | 6 | 8 | N | 114 | 136 | 8 | H | 2009-03-18 | |||
| This is a 3120 SF home. 5 bedrooms, 3 bathrooms, living room, dining room, family room (family room is only room currently painted a dark burgandy). All other rooms are neutral colors. | ||||||||||||||||
| 6175 | HOUSTON | TX | E | R | B | 2 | 3 | N | 0 | 75 | 10 | M | 2009-03-17 | |||
| hello,,trying to get an estimate on painting a large breezeway,,,vertical walls with slats,tongue and grove ceiling,,large screen windows....4 lrge ratann chairs and i rataan setee.will be arriving on fri 3-27,,looking to start work on sat 3-28 or mon 3-3 | ||||||||||||||||
| 6174 | BOISE | ID | I | R | W | 0 | 0 | N | 0 | 0 | 0 | M | 2009-03-17 | |||
| Closing on a twenty five hundred sqare ft. home, five Bd, two and a half bath, by June. Need one Bdr and Family Room with high quality, most others with low or medium quality to make rentable.Upstairs moderate cathedral ceiling. I am overseas in military | ||||||||||||||||
| 6173 | TOLEDO | OH | E | R | B | 3 | 14 | Y | 55 | 37 | 30 | M | 2009-03-16 | |||
| email for more info | ||||||||||||||||
| 6172 | OAK PARK | IL | I | R | W | 1 | 8 | N | 0 | 0 | 0 | H | 2009-03-14 | |||
| Living room/dining room/kitchen all open space together living room 25ft by 10ft, dining room 16ft by 11ft, kitchen 16 ft by 11ft. room height 10 ft. | ||||||||||||||||
| 6171 | GALENA | OH | I | R | W | 2 | 1 | N | 12 | 12 | 8 | H | 2009-03-14 | |||
| walls are in good shape. No sanding or priming needed. Walls are currently white, but color to be painted is a dark gray. 2 coats will be needed of Sherwin Williams Cashmere satin paint, color 6236 | ||||||||||||||||
| 6168 | ROCKWALL | TX | I | R | B | 5 | 7 | Y | 11 | 1 | 1 | M | 2009-03-13 | |||
| It is a 1300 square foot house that needs the walls and trim painted. Looking for a dark earth color on wall and white on trim. | ||||||||||||||||
| 6167 | CUMMING | GA | E | R | B | 0 | 0 | N | 16 | 40 | 16 | M | 2009-03-08 | |||
| Deck | ||||||||||||||||
| 6166 | CLIFTON | WI | E | R | B | 5 | 17 | Y | 30 | 50 | 25 | H | 2009-03-08 | |||
| buit in 1943 it is a story and a half. Not painted for about 10 years. The garage is a flat top so it's not very high. I will be changing the color. Very rough estimate on the size. | ||||||||||||||||
| 6165 | SAGAMORE HILL | PA | E | R | B | 0 | 7 | Y | 60 | 30 | 10 | H | 2009-03-07 | |||
| spray paint aluminum siding on a raised ranch | ||||||||||||||||
| 6164 | SAGAMORE HILL | PA | E | R | B | 0 | 7 | Y | 26 | 40 | 12 | H | 2009-03-07 | |||
| spray paint aluminum siding on a raised ranch | ||||||||||||||||
| 6163 | GALT | CA | I | R | B | 14 | 15 | N | 1 | 1 | 8 | M | 2009-03-07 | |||
| Single story 2500 sq ft house baseboard already removed for flooring job after paint | ||||||||||||||||
| 6162 | COLUMBIA | MD | E | R | T | 1 | 8 | N | 0 | 0 | 0 | H | 2009-03-06 | |||
| This is a small exterior paint job that involves painting the 16 Shutters associated with 8 front windows (4 windows on ground floor and four windows on 2nd floor), the front door and the wood trim around two french doors in the rear of the house. | ||||||||||||||||
| 6161 | BRICK | NJ | I | R | B | 1 | 0 | N | 80 | 70 | 8 | M | 2009-03-05 | |||
| some spackling needs to be done, 5 rooms painted and stairway walls | ||||||||||||||||
| 6160 | DAYVILLE | IN | I | R | B | 1 | 1 | N | 12 | 14 | 8 | H | 2009-03-04 | |||
| This is a master bedroom in a home. There appears to be a border around the top of the room that has been painted over. There appears to be build up of glue from previous paint over the border which is about 8 inches wide. | ||||||||||||||||
| 6159 | TEMPE | AZ | E | R | B | 3 | 0 | Y | 50 | 50 | 10 | H | 2009-03-04 | |||
| 2 story, 2000 sqft stucco home needs to be painted. | ||||||||||||||||
| 6158 | TARPON SPRINGS | FL | E | R | B | 3 | 15 | Y | 0 | 0 | 0 | M | 2009-02-28 | |||
| 4300 sq ft of exterior painting | ||||||||||||||||
| 6157 | NAPLES | FL | I | R | B | 2 | 3 | Y | 35 | 48 | 8 | L | 2009-02-25 | |||
| 2 bedrooms 12'x 14' & 12'x 13' living room 12' x 21' all ceilings plus kitchen & hallway ceilings | ||||||||||||||||
| 6156 | BRANDON | FL | E | C | W | 20 | 20 | Y | 966 | 999 | 95 | H | 2009-02-24 | |||
| exterior wallls | ||||||||||||||||
| 6155 | LACEY | WA | E | R | B | 1 | 6 | Y | 27 | 65 | 8 | M | 2009-02-24 | |||
| 6154 | BALTIMORE | MD | I | R | B | 3 | 6 | Y | 56 | 64 | 10 | H | 2009-02-19 | |||
| 6153 | BALTIMORE | MD | I | R | B | 3 | 6 | Y | 105 | 115 | 60 | H | 2009-02-19 | |||
| 6152 | GILBERT | AZ | E | R | B | 2 | 22 | Y | 45 | 50 | 18 | H | 2009-02-19 | |||
| Minor stucco damage, we want the house power washed, primed and painted. We are flexible on timing and unsure on color choices. We want quality work with a warranty | ||||||||||||||||
| 6151 | KRUM | TX | E | R | W | 1 | 2 | N | 400 | 500 | 99 | H | 2009-02-19 | |||
| I have a little sheetrock damage due to water leak from roof. Room needs to be repainted and sheetrock needs to be repaired. Room is 15 feet long and 16 feet wide, with 8 foot ceilings. I also need 2 outside wood pannels replaced and painted.Both pannels | ||||||||||||||||
| 6150 | BROOKSIDE VILLAGE | TX | I | R | B | 2 | 1 | Y | 999 | 999 | 99 | M | 2009-02-18 | |||
| paint the interior of a 3500 sq foot 2 story home with 4 bedrooms, 3 1/2 baths, living room, dining room and game room | ||||||||||||||||
| 6149 | AMHERST | VA | E | R | T | 4 | 16 | N | 0 | 0 | 0 | H | 2009-02-17 | |||
| A story and a half house with aluminum/vinyl siding which needs power washing and old wooden windows a few of which need to be rechaulked (can't think of the term) around each peice of glass. | ||||||||||||||||
| 6148 | GILBERT | AZ | I | R | W | 0 | 5 | N | 0 | 0 | 0 | M | 2009-02-17 | |||
| I do not have specific width, length, height at my fingertips, however the square feet of the area that we want painted is approximately 2000. We do not want spray used (only roller). Can you also indicate how many days it would take to complete as well | ||||||||||||||||
| 6147 | SAUGERTIES | NY | I | R | W | 2 | 3 | N | 14 | 20 | 8 | M | 2009-02-16 | |||
| I am looking for someone to wallpaper my bedroom. It will be for a brand new modular home. The dates are somewhat sketchy at this point, but we hope to get this project up and running by late spring or early summer. The room is about 20x14 with 3 wind | ||||||||||||||||
| 6146 | ASHBURN PARK | IL | E | R | B | 0 | 0 | N | 40 | 50 | 0 | M | 2009-02-16 | |||
| i want bedrooms,closets, living room and hallway painted | ||||||||||||||||
| 6145 | FAIRFAX | VA | I | R | W | 0 | 0 | N | 14 | 12 | 9 | M | 2009-02-15 | |||
| 3 bedrooms, currently painted in pastel pinks and purples. 12x14 12x12 10x12 Each room will have own colors, possibly with an accent wall. We get keys on 2/27, furniture arrives March 3. Might be good to give additional cost of doing baseboards i | ||||||||||||||||
| 6144 | HOUSTON | TX | E | C | B | 4 | 7 | Y | 40 | 60 | 12 | H | 2009-02-14 | |||
| 6143 | WASHINGTON | DC | I | R | B | 4 | 4 | Y | 30 | 45 | 9 | M | 2009-02-12 | |||
| On large living room-dining room, one bedroom, small kitchen and bathroom. Total area 790 sq. ft. | ||||||||||||||||
| 6142 | EDWARDSVILLE | IL | I | R | B | 0 | 0 | Y | 89 | 123 | 8 | M | 2009-02-11 | |||
| HIGH THOROUGH PREP, paint all 6" trim & base board | ||||||||||||||||
| 6141 | MORSEMERE | NJ | I | R | B | 7 | 10 | Y | 0 | 0 | 0 | M | 2009-02-10 | |||
| 4 bedrooms, 2 small bathrooms, 1 kitchen, 2 dining rooms, entrance way, 2 hallways | ||||||||||||||||
| 6140 | LEBANON | OH | I | R | W | 0 | 0 | N | 15 | 20 | 18 | M | 2009-02-10 | |||
| this is just an entry, up steps and hallway on 2nd floor. wall in steps is too high for us to paint. guessing reaches to 2nd story. maybe 18ft. also curious to know cost to paint a small family and or living room about 16 ft by 16ft | ||||||||||||||||
| 6139 | PORTSMOUTH | RI | E | R | B | 2 | 30 | Y | 40 | 35 | 30 | H | 2009-02-09 | |||
| The exterior of our home needs repainting, both the wood shingle siding and wood trim. | ||||||||||||||||
| 6138 | EAU GALLIE | FL | E | R | B | 1 | 12 | Y | 64 | 52 | 8 | H | 2009-02-08 | |||
| 24 yrs old CBS ranch | ||||||||||||||||
| 6137 | LAKELAND | FL | E | R | B | 4 | 13 | Y | 80 | 74 | 10 | H | 2009-02-06 | |||
| paint outside of house with bonus room above garage and trim. | ||||||||||||||||
| 6136 | LAS VEGAS | NV | I | R | B | 1 | 1 | N | 10 | 12 | 8 | M | 2009-02-04 | |||
| 6135 | WASHOUGAL | WA | E | R | W | 1 | 1 | Y | 50 | 50 | 50 | M | 2009-02-04 | |||
| Interior and exterior painting. Free bids. http://www.johnhowellconstruction.com | ||||||||||||||||
| 6134 | HOUSTON | TX | E | R | B | 2 | 14 | Y | 60 | 30 | 16 | H | 2009-02-03 | |||
| The house is half brick and half siding. It will use about 10 gallons of paint. 2 story house. Some siding will need to be replaced on the house. | ||||||||||||||||
| 6133 | COLLEGE PARK | NV | I | R | B | 5 | 0 | Y | 60 | 30 | 10 | H | 2009-02-02 | |||
| e beroom 2 bath house paint all inside | ||||||||||||||||
| 6132 | HOUSTON | TX | E | R | B | 2 | 10 | Y | 25 | 20 | 40 | M | 2009-01-31 | |||
| I represent a group of 12 townhomes. We are are looking for group pricing on an exterior paint job. We will consider providing the Sherwin Williams SuperPaint. Please email for specifications. | ||||||||||||||||
| 6131 | BIRMINGHAM | AL | E | R | B | 0 | 0 | N | 12 | 12 | 0 | M | 2009-01-29 | |||
| 2 bedrooms approx. 12x12 each. Popcorn ceiling removal and paint ceiling white. I want to slowly remove all popcorn ceilings throughout the house. | ||||||||||||||||
| 6130 | COLUMBUS | OH | I | R | B | 0 | 0 | Y | 36 | 54 | 24 | H | 2009-01-28 | |||
| I have three rooms, dining room, kitchen and family room that need painted along with entry hallway, stair well and upstairs hallway. Some spackling needed, some wall paper taken down. | ||||||||||||||||
| 6129 | GOLDEN GATE | FL | I | R | B | 6 | 12 | Y | 56 | 64 | 16 | M | 2009-01-27 | |||
| We would like the whole interior of our house painted... all rooms. The house is about 1700 sqft | ||||||||||||||||
| 6128 | DARMSTADT | IN | I | R | B | 7 | 10 | Y | 111 | 111 | 11 | M | 2009-01-26 | |||
| Need all walls, baseboards and some minor touch ups on ceilings and other areas as needed. 1,800 square foot home. Kitche, laundry, bedrooms (3), formal living and great room. Master's bathroom and small full bathroom. | ||||||||||||||||
| 6127 | EAST FLAGSTAFF | AZ | I | C | B | 2 | 0 | Y | 50 | 0 | 20 | M | 2009-01-22 | |||
| 6126 | NEWTON | MA | I | R | B | 0 | 1 | Y | 50 | 6 | 6 | M | 2009-01-22 | |||
| I found your site very interesting. | ||||||||||||||||
| 6125 | POMPANO BEACH | FL | E | C | B | 16 | 64 | Y | 30 | 150 | 40 | H | 2009-01-21 | |||
| 6124 | DENVER | CO | I | R | B | 10 | 22 | N | 60 | 30 | 8 | H | 2009-01-20 | |||
| 2 bed 2.5 bath 1603 sqf | ||||||||||||||||
| 6123 | ARLINGTON | VA | I | R | W | 0 | 0 | N | 61 | 53 | 8 | H | 2009-01-18 | |||
| Want 2 bedrooms (both 12X15) Kitchen (16X11) Living and Dining area (21X12) Stairway and upstairs landing 2 small bathrooms Flexible with dates over the next few weeks | ||||||||||||||||
| 6122 | MOBILE | AL | E | R | B | 0 | 10 | N | 0 | 0 | 0 | M | 2009-01-16 | |||
| Wedgefield Court, off snow road.Painting about 1200 sq feet (leaving out bathrooms, master bedroom, and kitchen. Leaves foyer, dining room, 3 small bedrooms and 15 foot hall and large living room 16 by 16. Baseboards and walls all one color. Current co | ||||||||||||||||
|
|