![]() |
![]() |
|
|
5931 Available Projects
From November 3, 2002 to Today
Contractors: please click on Login button above to login and submit bids on these projects.
Column heading buttons: click on the one you wish to sort by (e.g. click on RC to see all commercial jobs first and residential jobs second, or click on State button to sort by State, etc.).
Column Definitions: ID=Reference Number, IE=Interior/Exterior, RC=Residential/Commercial, P=Paint Walls/Trim/Both, D=# of Doors, Win=# of Windows, OB=Overhang/Baseboard paint Yes/No, W=Width in feet, L=Length in feet, H=Height in feet, Q=Quality Low/Medium/High.
Results Page(s) (100 per page): 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60
| ID | City | State | IE | RC | P | D | Win | OB | W | L | H | Q | Posted | |||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | ||||||||||||||||
| 3727 | GAITHERSBURG | MD | E | R | T | 0 | 0 | Y | 30 | 50 | 20 | M | 2005-07-09 | |||
| Need exterior trim only painted which may involve the fixing or replacing some small portion of damaged trim.. Porch, windows and doors are freshly painted and/or Vinyl and need nothing.. 2 story home. Add "HOUSE PAINTING" to subject line to avoid spam g | ||||||||||||||||
| 3726 | SAINT JOSEPH | MO | I | R | W | 0 | 0 | N | 15 | 18 | 8 | M | 2005-07-09 | |||
| 3725 | MEMPHIS | TN | I | R | B | 18 | 30 | Y | 32 | 36 | 8 | H | 2005-07-08 | |||
| 3500 square foot house 17 ft tall ceilings | ||||||||||||||||
| 3724 | BOX CANYON | CA | I | R | B | 16 | 30 | N | 50 | 60 | 20 | H | 2005-07-07 | |||
| We have a 5000 sq.ft.,5 bedroom 4&1/2 bath. house need interior painted. The living area has a 20ft. high ceiling. We have around 30 windows,and 15 doors inside. Please submit 2 separate estimates include and exclude the windows and doors. | ||||||||||||||||
| 3723 | CUYAHOGA FALLS | OH | E | C | W | 0 | 0 | N | 330 | 0 | 22 | L | 2005-07-07 | |||
| 7300 sq. ft of metal siding around the top (where the signs are posted) for a shopping center. Kinda like old tin siding. I'll do the washing. It is about 10 feet up, I'll rent a scissor lift. I'll also supply the paint. I just need labor cost for pre | ||||||||||||||||
| 3722 | CUYAHOGA FALLS | OH | E | C | W | 0 | 0 | N | 330 | 0 | 22 | L | 2005-07-07 | |||
| 7300 sq. ft of metal siding around the top (where the signs are posted) for a shopping center. Kinda like old tin siding. I'll do the washing. It is about 10 feet up, I'll rent a scissor lift. I'll also supply the paint. I just need labor cost for pre | ||||||||||||||||
| 3721 | RAYFORD | TX | I | R | W | 0 | 0 | N | 60 | 30 | 9 | H | 2005-07-07 | |||
| This is for a newly built home, painting to be done before furniture is moved in. We'd like entry, family room, kitchen, dining room, hall, two baths and three bedrooms painted. House is about 1,900 square feet. Ceilings aren't vaulted. Trim will stay its | ||||||||||||||||
| 3720 | ROCKLEDGE | PA | I | R | W | 0 | 0 | N | 10 | 28 | 8 | H | 2005-07-06 | |||
| Need to skim coat hallway of center hall colonial. Desire estimate of time and fees. Would like to complete in July if possible. | ||||||||||||||||
| 3719 | MIAMI | FL | I | C | W | 2 | 1 | N | 33 | 92 | 9 | M | 2005-07-06 | |||
| This is a small commercial show room to be sprayed all in one color. Only the base boards window and cement floor need be covered. The cieling and everything else will receive paint. Easy in, easy out project. | ||||||||||||||||
| 3718 | SCOTTSDALE | AZ | I | R | W | 0 | 0 | Y | 50 | 100 | 10 | M | 2005-07-06 | |||
| 4 different colors, 3000 sq ft house - paint the entire interior except for some accent spaces already painted. | ||||||||||||||||
| 3717 | SILVER SPRING | MD | E | R | W | 1 | 8 | N | 24 | 9 | 9 | M | 2005-07-05 | |||
| House exterior is half brick and half wood siding. Front wood siding is peeling, will need it scraped and repainted same color. Would like color change on 8 wooden shutters and wood front door. | ||||||||||||||||
| 3716 | DALLAS | TX | I | C | W | 0 | 2 | N | 14 | 67 | 12 | M | 2005-07-05 | |||
| It will also require some sheetrock work. The wall is split by a chair rail and will use two different colors for top and bottom. | ||||||||||||||||
| 3715 | ANTLERS PARK | MN | E | R | B | 1 | 13 | N | 32 | 62 | 18 | H | 2005-07-05 | |||
| I have a 4 level split. Hardy Plank on the sides and back that needs 1 coat of paint, and cedar on the front that needs 1 coat of Sikkens. Windows are vinyl & do not need paint. 3 car garage doors (2) that need paint. | ||||||||||||||||
| 3714 | PLEASANT SHADE | TN | I | R | B | 2 | 1 | Y | 10 | 12 | 9 | M | 2005-07-04 | |||
| 3713 | PARAMUS | NJ | I | R | B | 5 | 7 | N | 60 | 30 | 8 | H | 2005-07-04 | |||
| 3712 | CARMEL | NY | I | R | B | 6 | 6 | Y | 25 | 40 | 6 | H | 2005-07-03 | |||
| 2 level home aproximately 1400 sq. ft 3 bedrooms(small bedrooms), 2 baths(small baths), kitchen,living room (living room has a cathedral ceiling) paint all surfaces | ||||||||||||||||
| 3711 | MILFORD | CT | I | R | B | 6 | 3 | N | 13 | 20 | 8 | H | 2005-07-01 | |||
| There are two layers of wallpaper, the top layer is a straw wallpaper. Can you paint over this paper in order to save alot of labor and cost. Also a 3x5 hallway and a 3x10 hallway. | ||||||||||||||||
| 3710 | MILFORD | CT | I | R | B | 6 | 3 | N | 13 | 20 | 8 | H | 2005-07-01 | |||
| There are two layers of wallpaper, the top layer is a straw wallpaper. Can you paint over this paper in order to save alot of labor and cost. | ||||||||||||||||
| 3709 | AURORA | IL | I | R | W | 0 | 0 | N | 11 | 18 | 16 | M | 2005-07-01 | |||
| living room has 2-story walls on 3 sides (11', 11', 18'), 4th side is only 1-story and only 9' long (remaining 9' is opening to dining area) | ||||||||||||||||
| 3708 | MUNHALL | PA | I | R | B | 6 | 3 | N | 16 | 22 | 8 | H | 2005-07-01 | |||
| additional plastering above doors and windows in LR/DR/stairway and hall | ||||||||||||||||
| 3707 | MUNHALL | PA | I | R | B | 6 | 3 | N | 16 | 22 | 8 | M | 2005-07-01 | |||
| additional plastering above doors and windows in LR/DR/stairway and hall | ||||||||||||||||
| 3706 | OAKLEY | CA | E | R | T | 4 | 10 | N | 100 | 50 | 20 | H | 2005-07-01 | |||
| 3705 | CONWAY | AR | I | R | B | 15 | 6 | Y | 60 | 30 | 8 | H | 2005-06-30 | |||
| 3704 | WINCHESTER | MA | E | R | B | 3 | 18 | Y | 60 | 30 | 8 | M | 2005-06-30 | |||
| home will need some scraping in certain areas. need firm quote asap. | ||||||||||||||||
| 3703 | YAKIMA | WA | E | R | B | 0 | 8 | Y | 1 | 1 | 1 | M | 2005-06-29 | |||
| 3000 square feet outside wall space | ||||||||||||||||
| 3702 | SILVER SPRING | MD | E | R | W | 1 | 4 | N | 50 | 50 | 50 | M | 2005-06-29 | |||
| Exterior of house is half brick and half wood. The wood on the front portion of the house is starting to peel. Would need it scraped and repainted the same color to match the other 3 sides of the house. Would like a paint color change on 8 wooden shutters | ||||||||||||||||
| 3701 | LOCKPORT | IL | I | R | W | 0 | 0 | N | 19 | 15 | 8 | M | 2005-06-29 | |||
| Family room | ||||||||||||||||
| 3700 | LOCKPORT | IL | I | R | B | 4 | 0 | Y | 70 | 71 | 8 | M | 2005-06-29 | |||
| 2 bedrooms, FR, LR and DR Kitchen and 1 bath | ||||||||||||||||
| 3699 | WHITE PLAINS | NY | I | R | B | 3 | 4 | Y | 18 | 27 | 8 | H | 2005-06-29 | |||
| Studio apartment | ||||||||||||||||
| 3698 | FAYETTEVILLE | NC | I | R | B | 0 | 0 | N | 60 | 30 | 8 | M | 2005-06-29 | |||
| House is apx 1400 sq ft. Doors and trim are wood stain and will not be painted. | ||||||||||||||||
| 3697 | CHINO HILLS | CA | E | R | B | 3 | 20 | Y | 37 | 57 | 18 | H | 2005-06-28 | |||
| Two story home no paint on garage doors (new vinyl doors) Double front door entry use semigloss stucco walls different color from wood trim | ||||||||||||||||
| 3696 | AIRPORT MAIL FACILITY | MS | E | R | B | 3 | 9 | Y | 40 | 80 | 8 | M | 2005-06-28 | |||
| Brick Home, Cornish, Facial and 4 gables | ||||||||||||||||
| 3695 | CHANDLER | AZ | E | R | B | 2 | 4 | Y | 60 | 30 | 10 | M | 2005-06-28 | |||
| Doors include the fron door and 1 garage door. Would also like patio painted. Prep work would include the high-powered washing to remove dirt. | ||||||||||||||||
| 3694 | COLESVILLE | MD | E | R | T | 3 | 90 | Y | 44 | 67 | 20 | H | 2005-06-27 | |||
| Hampshire Greens location, House Style is a Oakton by CraftMark, with a walkout basement | ||||||||||||||||
| 3693 | RICHMOND | VA | E | R | B | 5 | 4 | Y | 3 | 20 | 25 | H | 2005-06-26 | |||
| 3692 | BOSTON HARBOR | WA | E | R | B | 3 | 0 | Y | 50 | 30 | 18 | M | 2005-06-26 | |||
| Im not sure if the size is correct,guessing Time and date very flexible..to get discount house is 2700 SF and 3 car garage | ||||||||||||||||
| 3691 | BOSTON HARBOR | WA | E | R | B | 3 | 0 | Y | 50 | 30 | 80 | M | 2005-06-26 | |||
| Im not sure if the size is correct | ||||||||||||||||
| 3690 | LAS VEGAS | NV | I | R | B | 11 | 13 | N | 0 | 48 | 10 | M | 2005-06-24 | |||
| Two story home, 1559 sq feet plus 2 car garage, 1 color all white. Flat except in kitchen and baths. 4 bedrooms, three baths. | ||||||||||||||||
| 3689 | N HOLLYWOOD | CA | E | R | T | 1 | 0 | Y | 16 | 1 | 8 | M | 2005-06-23 | |||
| Paint a wood garage door and the front archway on our house. Painting a small interior hallway and a bedroom to be discussed. | ||||||||||||||||
| 3688 | SEATTLE | WA | I | R | W | 1 | 1 | N | 10 | 10 | 8 | L | 2005-06-23 | |||
| 3687 | BOSTON | MA | I | R | W | 1 | 1 | N | 10 | 10 | 8 | L | 2005-06-23 | |||
| 3686 | TAYLOR | MI | I | R | W | 1 | 1 | N | 10 | 10 | 8 | L | 2005-06-23 | |||
| 3685 | AUBREY | TX | I | R | W | 0 | 0 | N | 0 | 0 | 0 | M | 2005-06-21 | |||
| 2000sqft house new home need to paint walls only | ||||||||||||||||
| 3684 | ANCHORAGE | AK | E | R | B | 3 | 10 | Y | 50 | 60 | 11 | M | 2005-06-20 | |||
| 3683 | ANCHORAGE | AK | E | R | B | 3 | 10 | Y | 104 | 122 | 12 | M | 2005-06-20 | |||
| 3682 | CUCAMONGA | CA | I | R | W | 0 | 0 | N | 0 | 0 | 0 | H | 2005-06-20 | |||
| Moving into a new home (1936 sq ft) and would like to have the entire inside of the home painted before we move in. | ||||||||||||||||
| 3681 | BERWYN | MD | E | R | B | 0 | 0 | N | 19 | 19 | 4 | L | 2005-06-19 | |||
| I'd like a small crew to stain my 19'x19' deck. The deck is already cleaned and ready. I already have the stain. Please reply with a quote, before the weather gets rainy. Thanks. | ||||||||||||||||
| 3680 | WYLIE | TX | I | R | B | 11 | 11 | N | 110 | 120 | 8 | M | 2005-06-18 | |||
| Need entire interior of home painted. The home is newly constructed and currently has an all white interior paint. We have three different colors that we want used. This is 2-story house with air-conditioned square footage of 2,568. 4 bedrooms, 2.5 ba | ||||||||||||||||
| 3679 | NEW IBERIA | LA | E | R | B | 3 | 30 | Y | 40 | 70 | 25 | H | 2005-06-17 | |||
| old house probably with original paint Or lack there of. | ||||||||||||||||
| 3678 | MINNEAPOLIS | MN | I | C | W | 0 | 0 | N | 30 | 60 | 25 | M | 2005-06-17 | |||
| re-plaster and paint walls and ceiling, with a knock-down texture on the walls | ||||||||||||||||
| 3677 | RIVERSIDE | CA | E | R | B | 3 | 13 | Y | 50 | 20 | 8 | M | 2005-06-17 | |||
| Small home in Riverside...Approximately 1,000 square feet....Wooden porch needs to be sanded and repainted..Don't know the dimensions | ||||||||||||||||
| 3676 | ELMHURST | IL | I | R | B | 0 | 0 | N | 144 | 210 | 9 | H | 2005-06-17 | |||
| 3675 | NORRISTOWN | PA | I | R | B | 0 | 0 | N | 20 | 20 | 8 | M | 2005-06-15 | |||
| I will be moving out of my apartment and will need some hole repairs (from hanging pictures) and 1 coat of white paint. | ||||||||||||||||
| 3674 | ELLSWORTH | ME | E | R | B | 1 | 12 | Y | 24 | 34 | 9 | M | 2005-06-15 | |||
| single story redwwod ranch with attached one car garage. Casement windows require some scraping. | ||||||||||||||||
| 3673 | ROYERSFORD | PA | I | R | T | 8 | 7 | Y | 0 | 0 | 0 | M | 2005-06-14 | |||
| looking for est. on stripping old paint from 9 doors,decor.trim around approx 12 doorways & 7 windows,window ledges & wood around glass, 2 railings.Baseboards in LR,DR,2nd flr hallway & up 2 staircases. chair rail in 15x15 DR. thanks | ||||||||||||||||
| 3671 | PUYALLUP | WA | E | R | W | 3 | 14 | Y | 30 | 70 | 10 | M | 2005-06-14 | |||
| 3670 | RAYFORD | TX | I | C | B | 2 | 4 | Y | 30 | 24 | 10 | M | 2005-06-14 | |||
| two rooms ea 12'X15' / two closets / minor "picture hanger holes" / light damage to base boards / trim to be oil base satin finish / walls eggshell acrylic | ||||||||||||||||
| 3669 | EDISON | NJ | I | R | B | 2 | 3 | Y | 28 | 24 | 8 | M | 2005-06-14 | |||
| 3668 | PLANO | TX | I | R | W | 2 | 2 | N | 0 | 0 | 0 | M | 2005-06-14 | |||
| 300' of wall space. applied vententian plaster, would like touch up and color added if possible. walls have been kilzed, and plastered with two coats. | ||||||||||||||||
| 3667 | CHANDLER | AZ | I | R | W | 0 | 0 | N | 16 | 22 | 10 | H | 2005-06-13 | |||
| master bedroom with vaulted ceiling used 10' as average | ||||||||||||||||
| 3666 | BELLEVILLE | MI | E | R | B | 0 | 0 | Y | 0 | 0 | 0 | H | 2005-06-13 | |||
| Need the lower level of a 2300sq ft house | ||||||||||||||||
| 3665 | PHOENIX | AZ | E | R | B | 7 | 6 | Y | 36 | 36 | 8 | M | 2005-06-13 | |||
| entire interior, med amt of prep work | ||||||||||||||||
| 3664 | NEW YORK | NY | I | R | B | 9 | 9 | Y | 20 | 10 | 9 | M | 2005-06-13 | |||
| Full repaint of empty apartment. White all around. Eggshell,flat and semigloss finishes. Approx. 1,000sf apt with 9ft ceilings | ||||||||||||||||
| 3663 | PHOENIX | AZ | I | R | B | 6 | 7 | Y | 38 | 38 | 8 | M | 2005-06-12 | |||
| 3662 | SEATTLE | WA | E | R | B | 0 | 0 | Y | 40 | 120 | 40 | M | 2005-06-12 | |||
| exterior of 3500 sq ft house, two stories, all gutters and three garage doors | ||||||||||||||||
| 3661 | MIDLAND | TX | I | R | W | 5 | 1 | N | 16 | 32 | 8 | H | 2005-06-10 | |||
| 3660 | SAN DIEGO | CA | E | R | B | 0 | 10 | N | 0 | 0 | 0 | H | 2005-06-10 | |||
| My house exterior needs painting, caulking, and some stucco repair around the foundation. It is an all wood bungalo-style house that is only 759 square feet. I am getting some rotted wood replaced first and then want a well-prepped and thoroughly painte | ||||||||||||||||
| 3659 | CORPUS CHRISTI | TX | I | R | W | 12 | 0 | Y | 140 | 140 | 8 | H | 2005-06-10 | |||
| 3658 | TACOMA | WA | E | R | B | 2 | 10 | Y | 55 | 26 | 9 | H | 2005-06-10 | |||
| House is aprox 1500sq' | ||||||||||||||||
| 3657 | MINNEAPOLIS | MN | E | R | B | 2 | 5 | Y | 70 | 300 | 26 | L | 2005-06-10 | |||
| repaint of underhangs. Looking into stucco to be painted eventually also. | ||||||||||||||||
| 3656 | HAMPTON | GA | I | C | B | 6 | 4 | N | 30 | 30 | 8 | M | 2005-06-10 | |||
| 3655 | AUGUSTA | GA | I | R | B | 1 | 1 | N | 20 | 16 | 10 | M | 2005-06-09 | |||
| 3654 | EVANS | GA | I | R | W | 0 | 0 | N | 76 | 77 | 9 | M | 2005-06-09 | |||
| 3653 | FONTAINEBLEAU | MS | I | R | B | 10 | 7 | Y | 1 | 1 | 1 | H | 2005-06-09 | |||
| I am closing on this house and would lke to have the interior painted before I move in. Please contact me as soon as possible to discuss the job. | ||||||||||||||||
| 3652 | SAINT PAUL | MN | I | R | B | 0 | 5 | Y | 30 | 30 | 10 | M | 2005-06-08 | |||
| 3 bedrooms 2 full baths one half bath Laundry room hallyway approximately 1100 sq feet Bedrooms 1. 23 x12 2. 13 x 13 3. 12 x 10 Laundry room 9X8 | ||||||||||||||||
| 3651 | DOTHAN | AL | E | R | B | 4 | 6 | Y | 18 | 18 | 30 | M | 2005-06-08 | |||
| 30 Foot high, carport underneath 1359 sq feet | ||||||||||||||||
| 3650 | BEDFORD | TX | E | R | B | 0 | 0 | Y | 40 | 60 | 25 | M | 2005-06-07 | |||
| Two story brick last painted about 10 years ago. Some wood trim boards need replacing | ||||||||||||||||
| 3649 | GIG HARBOR | WA | E | R | W | 8 | 24 | Y | 47 | 36 | 35 | H | 2005-06-07 | |||
| Large three story back one story front box shaped home with flat roof, looks like it has not been painted for about 15 years Most paint is peeled off, appears to only have been given one coat in life time. Home has little trim, it was never added around | ||||||||||||||||
| 3648 | WEST CHESTER | PA | I | R | W | 0 | 0 | N | 75 | 60 | 8 | H | 2005-06-07 | |||
| Need 6 areas painted - New construction, will not need base coat. No ceilings. Would prefer someone who can add a chair rail. Living Rm - 17'6"x16'5" Dining Rm - 16'x12' Foyer Master BR - L shaped 17'10"x12'plus 10'4"x9' Master Bath BR - 10'5"x10 | ||||||||||||||||
| 3647 | SAINT PAUL | MN | E | R | B | 2 | 16 | N | 25 | 30 | 12 | H | 2005-06-07 | |||
| Small single level home, wood siding. Measurements are approx. Small front porch. | ||||||||||||||||
| 3646 | DELRAY BEACH | FL | I | R | B | 7 | 0 | Y | 60 | 30 | 8 | L | 2005-06-06 | |||
| 3 brm. 2 bath house. All interior to be painted white, walls and trim. Aprox. 1800 sq. ft. Living rm. (16x20) has cathedral ceiling 14 ft. at peak. | ||||||||||||||||
| 3645 | DELRAY BEACH | FL | I | R | B | 6 | 10 | Y | 60 | 30 | 8 | L | 2005-06-06 | |||
| paint all rooms and trim. Both white. One ceiling that is 14 ft. high in living room. | ||||||||||||||||
| 3644 | AURORA | CO | E | R | B | 2 | 8 | N | 30 | 40 | 10 | M | 2005-06-06 | |||
| 3642 | GAITHERSBURG | MD | E | R | T | 2 | 10 | Y | 7 | 40 | 40 | M | 2005-06-06 | |||
| Paint outside of townhouse, front and back - trim only. Walls are brick. Paint doors also | ||||||||||||||||
| 3641 | OAK RIDGE | TN | I | C | W | 0 | 0 | N | 12 | 45 | 25 | M | 2005-06-05 | |||
| spray work only. one coat prim.one coat paint.some walls 25ft tall others 16ft tall total sq ft is 22000 of walls.new construction. | ||||||||||||||||
| 3640 | OAK RIDGE | TN | I | C | W | 0 | 0 | N | 12 | 45 | 25 | H | 2005-06-05 | |||
| 22000 sq ft walls only some walls are 25 ft high. spray work only. | ||||||||||||||||
| 3639 | PUYALLUP | WA | E | R | B | 3 | 10 | Y | 50 | 70 | 14 | H | 2005-06-04 | |||
| RAMBLER 1842 SQF 3 CAR GARAGE ATTACHED | ||||||||||||||||
| 3637 | ARLINGTON | TX | I | R | B | 10 | 17 | Y | 60 | 40 | 10 | M | 2005-06-04 | |||
| Paint interior 4 bedroom/3 bath/2 living/ kitchen/utility/dining/hallways. 5 rooms will require some removal of wall paper and retextured prior to painting. Paint ceilings as needed. Request multiple colors. | ||||||||||||||||
| 3636 | IRMO | SC | I | R | B | 6 | 12 | Y | 30 | 60 | 10 | M | 2005-06-03 | |||
| 3635 | RALEIGH | NC | I | R | B | 0 | 2 | Y | 16 | 20 | 10 | M | 2005-06-02 | |||
| 3634 | GREEN LANE | PA | I | R | B | 10 | 2 | Y | 20 | 40 | 9 | H | 2005-06-02 | |||
| Rooms to be painted are foyer and adjacent family room. Post and beam construction, no ceilings to be painted. | ||||||||||||||||
| 3632 | SAINT LOUIS | MO | I | R | B | 0 | 0 | Y | 55 | 30 | 8 | M | 2005-06-02 | |||
| 1650 sq ft house, 3brm, 2 full-bth repaint whole inside of house-walls and baseboards. no ceilings, no doors, no door frames, no basement. there is a vaulted "A" frame wall in the great-room, with the highest point at 12ft. | ||||||||||||||||
| 3631 | CATHEDRAL CITY | CA | I | R | B | 1 | 1 | Y | 16 | 11 | 8 | H | 2005-06-01 | |||
| 3630 | BRIDGEWATER | NJ | E | R | W | 4 | 2 | N | 20 | 20 | 8 | M | 2005-06-01 | |||
| 3629 | CONCORD | NH | E | R | B | 0 | 18 | Y | 24 | 36 | 2 | M | 2005-06-01 | |||
| 1.5 story, cape, 26x36 house, no paint on front and back of main house, done, breezeway 10' attached to house, then attached 2 car garage, | ||||||||||||||||
| 3628 | NEUSE | NC | I | R | B | 0 | 0 | Y | 18 | 26 | 8 | L | 2005-05-31 | |||
| Rental house - need to paint LR, kitchen, stairwell, upstairs hall, 10x10 bedroom, hall bath, small walk-in closet. | ||||||||||||||||
| 3627 | CEDAR GROVE | NJ | I | R | B | 6 | 0 | Y | 56 | 50 | 8 | M | 2005-05-31 | |||
| Living room, dining room, 2 bedrooms, bathroom and kitchen need to be painted. House is a small cape cod | ||||||||||||||||
| 3625 | CATHARPIN | VA | I | R | B | 10 | 13 | Y | 70 | 35 | 8 | H | 2005-05-30 | |||
| Two level rambler. About 4600 sq. ft to be painted. | ||||||||||||||||
| 3624 | PHOENIX | AZ | E | R | B | 2 | 10 | Y | 60 | 30 | 30 | M | 2005-05-30 | |||
| 2 story stucco 2,100 sq ft. | ||||||||||||||||
| 3623 | PHOENIX | AZ | E | R | B | 2 | 9 | Y | 25 | 25 | 25 | M | 2005-05-30 | |||
| 2 story stucco 2,100 sq ft. | ||||||||||||||||
|
|