![]() |
![]() |
|
|
5931 Available Projects
From November 3, 2002 to Today
Contractors: please click on Login button above to login and submit bids on these projects.
Column heading buttons: click on the one you wish to sort by (e.g. click on RC to see all commercial jobs first and residential jobs second, or click on State button to sort by State, etc.).
Column Definitions: ID=Reference Number, IE=Interior/Exterior, RC=Residential/Commercial, P=Paint Walls/Trim/Both, D=# of Doors, Win=# of Windows, OB=Overhang/Baseboard paint Yes/No, W=Width in feet, L=Length in feet, H=Height in feet, Q=Quality Low/Medium/High.
Results Page(s) (100 per page): 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60
| ID | City | State | IE | RC | P | D | Win | OB | W | L | H | Q | Posted | |||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | ||||||||||||||||
| 2430 | HUDSON | OH | I | R | W | 0 | 0 | N | 0 | 0 | 0 | H | 2004-03-08 | |||
| We would like to have the following rooms painted: kitchen, dining room, great room, living room, two story foyer, master bedroon, master bath and extra bathroom. Wallpaper needs to be removed from dining room, master bathroom and extra bathroom. | ||||||||||||||||
| 2429 | CHESTNUT STREET | IL | I | R | B | 0 | 7 | Y | 17 | 29 | 15 | M | 2004-03-08 | |||
| Need to paint walls and vaulted ceiling of living room that is 17x19 with 6 windows, and kitchen that is 10x9. Also need to paint entry stairs and 25 foot hallway with 8ft ceilings, 3 doors, and 3 bifold doors. | ||||||||||||||||
| 2428 | CINCINNATI | OH | I | R | B | 1 | 1 | Y | 12 | 12 | 10 | M | 2004-03-08 | |||
| walls are sage green and pink now. childs room I want light yellow and darker pink | ||||||||||||||||
| 2427 | DOVER | DE | I | R | B | 1 | 1 | Y | 16 | 24 | 8 | M | 2004-03-07 | |||
| 2426 | ORLANDO | FL | E | R | B | 2 | 8 | Y | 65 | 35 | 8 | M | 2004-03-07 | |||
| pressure clean house and roof prior to painting. Replace wood trim and rebuild wood chimney | ||||||||||||||||
| 2425 | WINTERSET | IA | E | R | W | 7 | 10 | Y | 165 | 101 | 9 | H | 2004-03-06 | |||
| 2424 | MOUNT WASHINGTON | KY | I | R | W | 0 | 0 | N | 1 | 1 | 1 | M | 2004-03-06 | |||
| approx 2000 square foot cape cod. all interior walls to be painted. | ||||||||||||||||
| 2423 | NOBLESVILLE | IN | E | R | B | 0 | 0 | Y | 80 | 60 | 25 | H | 2004-03-05 | |||
| Paint the exterior of our home | ||||||||||||||||
| 2422 | VISALIA | CA | E | R | B | 3 | 10 | N | 0 | 0 | 0 | M | 2004-03-05 | |||
| My home is approx 1800 sq. ft. | ||||||||||||||||
| 2421 | WHITE HOUSE | TN | E | R | T | 2 | 14 | Y | 30 | 70 | 12 | H | 2004-03-05 | |||
| 2420 | CONCORD | NC | I | R | B | 7 | 9 | N | 12 | 18 | 18 | M | 2004-03-05 | |||
| 12x16 with 18'ceilings on 3.5 walls, 5 35"x71" windows: stairwell with 2 35"x71" windows: paint provided | ||||||||||||||||
| 2419 | NAPERVILLE | IL | I | R | W | 0 | 0 | N | 48 | 42 | 9 | M | 2004-03-05 | |||
| Condo/Townhouse in Carrolwood Park in Naperville. Would like Foyer, front hall, Kitchen, Dining and Great room on 1st floor painted. Upstairs hallway painted as well. Floor plan avial. to send if needed. No doors or windows need painting. | ||||||||||||||||
| 2418 | BAYTOWN | TX | E | R | B | 2 | 12 | Y | 999 | 999 | 99 | L | 2004-03-04 | |||
| 2 story home 1900 square feet. | ||||||||||||||||
| 2417 | SPANISH SPRINGS | NV | I | R | B | 8 | 8 | Y | 8 | 8 | 8 | H | 2004-03-04 | |||
| 2416 | MENOMONEE FALLS | WI | E | R | B | 2 | 17 | Y | 60 | 38 | 12 | H | 2004-03-03 | |||
| 2250 square foot ranch - new construction I'm not sure on dimensions - but I do know it is 2250 square feet. | ||||||||||||||||
| 2415 | ISSAQUAH | WA | I | R | B | 10 | 11 | Y | 1 | 1 | 1 | H | 2004-03-03 | |||
| Approximately 2000 square feet | ||||||||||||||||
| 2414 | ISSAQUAH | WA | I | R | B | 10 | 11 | Y | 1 | 1 | 1 | H | 2004-03-03 | |||
| Approximately 2000 square feet | ||||||||||||||||
| 2413 | BELMONT | NC | I | R | B | 19 | 26 | Y | 149 | 114 | 8 | H | 2004-03-03 | |||
| 2412 | SCOTTSDALE | AZ | I | R | B | 3 | 5 | N | 20 | 40 | 10 | M | 2004-03-03 | |||
| ONE LARGE ROOM | ||||||||||||||||
| 2411 | CUCAMONGA | CA | E | R | B | 4 | 10 | Y | 60 | 30 | 10 | M | 2004-03-02 | |||
| i have a 2200 sq ft home. the stucco and wood trim were painted a few years back and need to change the colors. i need an estimate a.s.a.p | ||||||||||||||||
| 2410 | CUCAMONGA | CA | E | R | B | 4 | 10 | Y | 60 | 30 | 10 | H | 2004-03-02 | |||
| I HAVE A 1800 SQ FT HOME THAT HAS NOT BEEN PAINTED FOR 10 YEARS. THE FACIAS ARE 1"BY6" AND IN NEED OF SCRAPING AND FILLING HOLES MAYBE SOME DRYROT. STUCCO HAS A FEW CRACKS BUT IN FAIRLY GOOD SHAPE THE WINDOWS ARE ALUMINUM FRAME WITH NO NEED TO PAINT. NEED | ||||||||||||||||
| 2409 | MARLTON LAKES | NJ | I | R | B | 1 | 2 | Y | 24 | 24 | 3 | H | 2004-03-02 | |||
| Need estimate for bedroom. 12x12. Need wallpaper removed from 2 walls. Paint ceiling, walls and all trim. | ||||||||||||||||
| 2408 | ELGIN | IL | E | R | T | 3 | 18 | Y | 60 | 35 | 16 | M | 2004-03-02 | |||
| 2407 | DEVINE | TX | E | R | W | 0 | 0 | N | 0 | 0 | 0 | M | 2004-03-02 | |||
| buying this home, lender is requiring exterior scraping, sanding and painting of some areas. I'd like a quote to repaint the entire home. Don't have the dimensions, but if it may help, I can e-mail a link to the realtor site with 6 exterior photos. (tri | ||||||||||||||||
| 2406 | WASHINGTON | DC | I | R | W | 0 | 0 | N | 20 | 20 | 20 | H | 2004-03-01 | |||
| living room: 18x13 bedroom:11.3x13 den:10x10. | ||||||||||||||||
| 2405 | YORBA LINDA | CA | I | R | B | 9 | 12 | N | 0 | 0 | 0 | H | 2004-03-01 | |||
| Home is 1943sq ft. Not sure whether to do entire inside 3bds,3baths,liv room,den,dining rm, hallways, or only den,kitch,liv room halls, and mast bath. Would like to know cost diff. Ceilings in mast bed and liv room are vaulted. Would want moldings paint | ||||||||||||||||
| 2403 | SECAUCUS | NJ | E | C | B | 2 | 0 | Y | 4 | 6 | 8 | M | 2004-03-01 | |||
| I have 2 security booths that I need painted both inside and outside. The exterior is a stucco finish.I also need a suggestion for painting the floor. It is concrete. There is very little prep work. | ||||||||||||||||
| 2402 | CHINO HILLS | CA | E | R | B | 3 | 12 | N | 60 | 60 | 35 | M | 2004-03-01 | |||
| my house is about 2200 sq. ft. It is stucco with some wood trim. It was painted new 3 years ago, but we want a different color. I live in chino hills. please contact me via email. | ||||||||||||||||
| 2401 | GREENWOOD VILLAGE | CO | E | R | B | 1 | 10 | Y | 0 | 0 | 0 | H | 2004-03-01 | |||
| House is approximately 1000 sq ft with a 324 sq detached garage that need to be painted as well. Has not been painted in a number of years and paint is in very poor condition - chipping etc. | ||||||||||||||||
| 2400 | CHINO HILLS | CA | E | R | B | 3 | 12 | N | 0 | 0 | 0 | M | 2004-03-01 | |||
| my house is about 2200 sq. ft. It is stucco with some wood trim. It was painted new 3 years ago, but we want a different color. I live in chino hills. please contact me via email. | ||||||||||||||||
| 2399 | HILLSBORO | OR | I | R | B | 1 | 1 | Y | 12 | 11 | 8 | M | 2004-03-01 | |||
| 2398 | HILLSBORO | OR | I | R | B | 1 | 1 | Y | 12 | 11 | 8 | M | 2004-03-01 | |||
| 2397 | BURLINGTON | MA | E | R | B | 2 | 11 | Y | 30 | 20 | 25 | H | 2004-03-01 | |||
| 2396 | ATKINSON | NE | I | C | W | 0 | 0 | Y | 0 | 0 | 0 | H | 2004-03-01 | |||
| This is a gymnasium. That would also need the ceiling painted. Possibly some logo's on the walls also. The job is at West Holt High School. | ||||||||||||||||
| 2395 | CENTRAL POINT | OR | I | R | W | 0 | 0 | N | 0 | 0 | 0 | H | 2004-03-01 | |||
| a house about 1400 sq ft. Three bedrooms 10x12 8' ceilings , two living rooms 20x20 9' ceilings , dining area and bathrooms 6x12 8' ceilings. All one color. | ||||||||||||||||
| 2394 | PHILA | PA | E | R | B | 4 | 27 | Y | 44 | 28 | 30 | H | 2004-02-29 | |||
| House is a twin, three exterior walls: 44 x 28 x 44. Some stucco repair may be required, either by painter or other contractor. Eaves have decorative soffits. | ||||||||||||||||
| 2393 | ATL | GA | E | R | B | 2 | 9 | N | 35 | 24 | 8 | H | 2004-02-29 | |||
| wood frame home brick bottom trim windows and both porches need painting heavy peeling no overhang | ||||||||||||||||
| 2392 | ATL | GA | E | R | B | 2 | 9 | Y | 24 | 35 | 8 | H | 2004-02-29 | |||
| wood frame home built in 50's brick bottom all windows and trim need painting including front and rear porch | ||||||||||||||||
| 2391 | ATL | GA | E | R | B | 2 | 9 | Y | 24 | 35 | 8 | H | 2004-02-29 | |||
| wood frame home built in 50's brick bottom all windows and trim need painting including front and rear porch | ||||||||||||||||
| 2390 | ATL | GA | E | R | B | 2 | 10 | Y | 24 | 35 | 8 | H | 2004-02-29 | |||
| wood frame home built in 50's heavy peeling of paint | ||||||||||||||||
| 2389 | PHOENIX | AZ | E | R | B | 2 | 8 | Y | 2 | 100 | 30 | H | 2004-02-29 | |||
| this a block houise with a brick bottom in the front of the house, also the patio room outside surface would need to be replaced with the same surface - particle board | ||||||||||||||||
| 2388 | DANIA | FL | E | R | B | 4 | 10 | Y | 31 | 47 | 8 | H | 2004-02-29 | |||
| Exterior paint of house built in 1956 old ft lauderdale style home - need house, trim, doors painted one story 2 bedrooms 2 bathroom home | ||||||||||||||||
| 2387 | SMYRNA | GA | I | R | W | 0 | 0 | N | 17 | 15 | 18 | M | 2004-02-29 | |||
| Den in new home-currently "egg shell" want to be light tan color - Dimensions entered are for 4 sided room but want only 3 walls painted - please adjust quote accordingly. | ||||||||||||||||
| 2386 | MESA | AZ | I | R | B | 10 | 13 | Y | 999 | 999 | 2 | H | 2004-02-29 | |||
| This is a 1689 square foot newer home will want all off white color wood work the same color house would be empty for working not major prep work in great condition near country club/guadalupe in mesa | ||||||||||||||||
| 2385 | MILWAUKEE | WI | I | C | B | 99 | 99 | Y | 999 | 999 | 15 | M | 2004-02-28 | |||
| 4000 square feet local spa need interior painting. Would like project completed over a weekend. Please contact me. Thank you - Ann | ||||||||||||||||
| 2384 | BROWN MOUNTAIN BEACH | NC | E | R | B | 4 | 8 | Y | 30 | 60 | 8 | M | 2004-02-28 | |||
| Paint exterior of home including trim and overhang, may need pressure washing | ||||||||||||||||
| 2383 | FAYETTEVILLE | NC | I | R | B | 11 | 12 | Y | 176 | 198 | 8 | H | 2004-02-28 | |||
| No furniture in house yet. Current interior paint is dk orange/dk green (may contain lead from 1965) Would like interior painted with Neutral Light/white colors and some wallpaper replaced w/paint. 4 Lg bedrms, 1 sm bedrm, 2 bathrooms, 1 frmal dining rm, | ||||||||||||||||
| 2382 | NEWHALL | CA | I | R | B | 5 | 0 | N | 30 | 40 | 8 | M | 2004-02-28 | |||
| I need one living room painted, one hallway and up the stairs and 5 doors - no ceiling required on the living room, or hallway | ||||||||||||||||
| 2381 | SULPHUR SPRINGS | MO | E | R | W | 8 | 2 | N | 15 | 50 | 10 | M | 2004-02-28 | |||
| 2380 | EVANSTON | WY | I | C | W | 0 | 0 | N | 5 | 60 | 8 | H | 2004-02-27 | |||
| 2378 | LUCKETTS | VA | E | R | T | 0 | 2 | Y | 20 | 30 | 40 | L | 2004-02-27 | |||
| Need the exterior trim painted. End-Unit townhome. | ||||||||||||||||
| 2377 | NEWARK | NJ | E | R | T | 0 | 20 | Y | 40 | 60 | 20 | H | 2004-02-26 | |||
| 2376 | NEWARK | NJ | E | R | B | 0 | 20 | Y | 40 | 60 | 20 | H | 2004-02-26 | |||
| 2375 | NEWARK | NJ | E | R | B | 0 | 20 | Y | 40 | 60 | 20 | H | 2004-02-26 | |||
| 2374 | JOPPA | MD | I | R | B | 1 | 10 | Y | 5 | 8 | 9 | M | 2004-02-25 | |||
| finish painting in entry way already started by homeowner......finish trim work......sea sponge one wall with metallic paint..already have the paints and sponges to finish this... Discuss new trim on walls in living room dining room and family room.... | ||||||||||||||||
| 2373 | COLUMBIA | WA | E | R | B | 4 | 15 | Y | 3 | 40 | 3 | H | 2004-02-25 | |||
| 1910 house with shake siding that was previously painted but badly peeling now needs a new paint job. Thinking of 2 colors. Also, thinking of having oil primer applied before top coat. House is about 30 ft x 40 ft and 2-3stories | ||||||||||||||||
| 2372 | HAYWARD | CA | I | R | B | 0 | 0 | N | 12 | 12 | 8 | H | 2004-02-25 | |||
| Bedroom (12'x12') (had paneling glued and nailed on two walls) prep (some replastering) and paint.Flexable on desired start date. | ||||||||||||||||
| 2370 | COON RAPIDS | MN | I | R | B | 2 | 1 | N | 10 | 12 | 7 | M | 2004-02-24 | |||
| 2369 | WASHINGTON | DC | I | R | B | 3 | 4 | N | 28 | 28 | 8 | M | 2004-02-24 | |||
| One bedroom apartment. Repaint white over existing white plaster walls and trim. | ||||||||||||||||
| 2368 | MIAMI | FL | E | R | B | 0 | 0 | Y | 0 | 0 | 0 | M | 2004-02-23 | |||
| Would like to have home texture coated, with boarders. Need estimate for front only, and estimate with the whole house. | ||||||||||||||||
| 2367 | WICHITA | KS | I | R | W | 0 | 0 | Y | 189 | 174 | 10 | H | 2004-02-23 | |||
| Approx 6,302 sq ft house with stain on doors and windows - we would like several rooms painted plus exterior overhang We're contemplating buying the house and need a quick bid | ||||||||||||||||
| 2366 | BIDDEFORD | ME | I | R | B | 22 | 20 | Y | 64 | 140 | 8 | H | 2004-02-23 | |||
| 2365 | JUANITA | WA | E | R | B | 1 | 11 | N | 0 | 0 | 0 | M | 2004-02-23 | |||
| Exterior paint only for a rambler. Garage door will not need to be painted. House is currently a deep yellow and we would like to go grey with white trimming. Not sure what the width, height or length is for the home | ||||||||||||||||
| 2364 | EUCLID | FL | E | R | B | 2 | 22 | N | 30 | 40 | 15 | M | 2004-02-23 | |||
| The width, length & height are estimates. The sq footage of our home is approx 1200. We also have a detached garage we would like painted. Please also price with a high level of prep to sand window frames etc that have high levels of uneven build-up | ||||||||||||||||
| 2363 | LEWISVILLE | TX | E | R | B | 3 | 10 | Y | 55 | 60 | 12 | H | 2004-02-23 | |||
| Single Story Half brick half wood chimney | ||||||||||||||||
| 2362 | NORRISTOWN | PA | E | R | B | 2 | 23 | Y | 25 | 35 | 35 | M | 2004-02-23 | |||
| I'm seeking a general estimate to be used in negotiations for settlement on a house. The estimate is for the interior and exterior of a 104 year old, 2300' sq ft twin, 3 stories, 9.5' ceilings, 5 bedrooms, 2 bathrooms, room dimensions 13'x 15' and 12' by | ||||||||||||||||
| 2361 | SPRINGVALE | ME | I | R | W | 2 | 4 | N | 6 | 51 | 8 | H | 2004-02-22 | |||
| 2360 | BIDDEFORD | ME | I | R | B | 25 | 20 | Y | 80 | 140 | 8 | H | 2004-02-22 | |||
| 2359 | BIDDEFORD | ME | I | R | B | 25 | 20 | Y | 80 | 140 | 8 | H | 2004-02-22 | |||
| 2358 | BIDDEFORD | ME | I | R | B | 25 | 20 | Y | 64 | 140 | 8 | H | 2004-02-22 | |||
| 2357 | BIDDEFORD | ME | I | R | B | 25 | 20 | Y | 122 | 280 | 8 | H | 2004-02-22 | |||
| 2356 | FORT COLLINS | CO | I | R | W | 0 | 3 | N | 12 | 16 | 8 | H | 2004-02-22 | |||
| Dining room with windows at east end of wall. One entryway (no door or trim) from formal living room, and smaller entryway (no door or trim) through kitchen. | ||||||||||||||||
| 2355 | BIDDEFORD | ME | I | R | B | 28 | 20 | Y | 64 | 110 | 16 | H | 2004-02-22 | |||
| 2354 | FALCON HEIGHTS | MN | I | R | W | 0 | 0 | N | 11 | 23 | 8 | M | 2004-02-22 | |||
| 2353 | KISSIMMEE | FL | E | R | B | 1 | 10 | N | 99 | 99 | 99 | H | 2004-02-22 | |||
| our home is around 2000 square feet. It is a one story hom I have no idea what the length , height, or width is | ||||||||||||||||
| 2352 | SPRINGVALE | ME | E | R | W | 0 | 0 | N | 6 | 51 | 24 | H | 2004-02-22 | |||
| 2351 | SPRINGVALE | ME | E | R | W | 2 | 2 | N | 6 | 51 | 24 | H | 2004-02-22 | |||
| 2350 | SPRINGVALE | ME | E | R | W | 11 | 2 | N | 6 | 51 | 8 | H | 2004-02-22 | |||
| 2349 | SPRINGVALE | ME | E | R | B | 11 | 2 | N | 6 | 51 | 8 | H | 2004-02-22 | |||
| 2348 | SPRINGVALE | ME | E | R | B | 32 | 4 | N | 6 | 51 | 8 | H | 2004-02-22 | |||
| 2347 | SPRINGVALE | ME | E | R | W | 2 | 4 | N | 6 | 51 | 8 | H | 2004-02-22 | |||
| 2346 | SPRINGVALE | ME | E | R | W | 2 | 4 | N | 6 | 51 | 8 | M | 2004-02-22 | |||
| 2345 | SPRINGVALE | ME | E | R | B | 5 | 12 | Y | 26 | 34 | 15 | M | 2004-02-21 | |||
| 2344 | SPRINGVALE | ME | I | R | B | 13 | 7 | Y | 26 | 40 | 8 | H | 2004-02-21 | |||
| 2343 | SPRINGVALE | ME | I | R | W | 2 | 2 | N | 6 | 51 | 8 | M | 2004-02-21 | |||
| 2342 | SPRINGVALE | ME | I | R | W | 2 | 2 | N | 6 | 51 | 8 | H | 2004-02-21 | |||
| 2341 | SPRINGVALE | ME | I | R | W | 2 | 2 | N | 36 | 51 | 8 | H | 2004-02-21 | |||
| 2340 | SPRINGVALE | ME | I | R | W | 2 | 2 | N | 32 | 30 | 8 | H | 2004-02-21 | |||
| 2339 | SPRINGVALE | ME | I | R | B | 2 | 2 | Y | 6 | 51 | 8 | H | 2004-02-21 | |||
| 2338 | SPRINGVALE | ME | I | R | B | 2 | 2 | Y | 32 | 30 | 8 | H | 2004-02-21 | |||
| 2337 | SPRINGVALE | ME | I | R | B | 10 | 10 | Y | 32 | 55 | 8 | H | 2004-02-21 | |||
| 2336 | SPRINGVALE | ME | I | R | B | 20 | 20 | Y | 32 | 55 | 8 | H | 2004-02-21 | |||
| 2335 | SPRINGVALE | ME | I | R | B | 20 | 20 | Y | 32 | 140 | 8 | H | 2004-02-21 | |||
| 2334 | SPRINGVALE | ME | I | R | B | 20 | 20 | Y | 32 | 140 | 8 | H | 2004-02-21 | |||
| 2333 | SPRINGVALE | ME | I | C | W | 20 | 20 | Y | 32 | 140 | 8 | H | 2004-02-21 | |||
| 2332 | SPRINGVALE | ME | I | C | W | 2 | 2 | N | 6 | 51 | 8 | H | 2004-02-21 | |||
| 2331 | SPRINGVALE | ME | I | R | W | 2 | 2 | N | 6 | 51 | 8 | H | 2004-02-21 | |||
| 2330 | SPRINGVALE | ME | I | R | W | 2 | 2 | N | 6 | 51 | 8 | M | 2004-02-21 | |||
| 2329 | SPRINGVALE | ME | I | R | W | 2 | 2 | N | 6 | 51 | 8 | M | 2004-02-21 | |||
| 2328 | SPRINGVALE | ME | I | R | W | 2 | 2 | N | 6 | 51 | 8 | M | 2004-02-21 | |||
|
|