![]() |
![]() |
|
|
5931 Available Projects
From November 3, 2002 to Today
Contractors: please click on Login button above to login and submit bids on these projects.
Column heading buttons: click on the one you wish to sort by (e.g. click on RC to see all commercial jobs first and residential jobs second, or click on State button to sort by State, etc.).
Column Definitions: ID=Reference Number, IE=Interior/Exterior, RC=Residential/Commercial, P=Paint Walls/Trim/Both, D=# of Doors, Win=# of Windows, OB=Overhang/Baseboard paint Yes/No, W=Width in feet, L=Length in feet, H=Height in feet, Q=Quality Low/Medium/High.
Results Page(s) (100 per page): 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60
| ID | City | State | IE | RC | P | D | Win | OB | W | L | H | Q | Posted | |||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | ||||||||||||||||
| 2122 | JACKSONVILLE | FL | E | R | W | 0 | 0 | N | 30 | 60 | 8 | H | 2004-01-09 | |||
| pressure wash walls first | ||||||||||||||||
| 2121 | CASTRO VALLEY | CA | E | R | B | 0 | 14 | Y | 30 | 35 | 25 | H | 2004-01-09 | |||
| 2 story house square footage 1969 for house, 2 car garage 600 sq. ft. (in box of home) Box shape all inc. Will need garage doors painted, no house doors. 2 house doors however 1 glass 1 wood no paint needed. | ||||||||||||||||
| 2120 | ALEXANDRIA | VA | I | R | W | 2 | 3 | Y | 60 | 30 | 8 | M | 2004-01-09 | |||
| One bed room 1.5 baths.Dining room and living room, small kitchen | ||||||||||||||||
| 2119 | BIRMINGHAM | AL | E | R | T | 2 | 19 | Y | 50 | 45 | 45 | H | 2004-01-08 | |||
| All exterior work. Two "main" floors with garage/basement below and high attic so some walls are around 4 stories tall. | ||||||||||||||||
| 2118 | BOCA RATON | FL | I | R | B | 9 | 10 | Y | 80 | 100 | 10 | M | 2004-01-08 | |||
| Paint the interior of my home prior to sale. Walls, trim, doors. 4 bedroom, 3 bath, liv, din, fam, kitchen | ||||||||||||||||
| 2117 | JACKSONVILLE | FL | E | R | W | 2 | 0 | N | 30 | 60 | 8 | H | 2004-01-08 | |||
| need walls pressure washed and painted with 2 coats | ||||||||||||||||
| 2116 | TUSTIN | CA | I | R | B | 9 | 12 | Y | 35 | 40 | 8 | M | 2004-01-08 | |||
| (3) bedrooms: 38 X 42 X 8 plus ceilings (1) Living room: 30 x 18 X 10 plus ceiling (1) kitchen: 6 X 10 plus ceiling (3) bathrooms 30 X 18 X 8 plus ceilings (1) Laundry room 6 X 10 X 8 plus ceiling | ||||||||||||||||
| 2115 | SAN DIEGO | CA | I | R | B | 7 | 7 | Y | 60 | 30 | 8 | M | 2004-01-08 | |||
| 2114 | FALLS CHURCH | VA | I | R | B | 0 | 0 | N | 60 | 30 | 8 | M | 2004-01-08 | |||
| Seeking painters for interior work: 2-3 small to medium bedrooms, small dining room and possibly medium living room. Average size house. | ||||||||||||||||
| 2113 | FALLS CHURCH | VA | I | R | B | 0 | 0 | N | 60 | 30 | 8 | M | 2004-01-08 | |||
| Seeking painters for interior work: 2-3 small to medium bedrooms, small dining room and possibly medium living room. Average size house. | ||||||||||||||||
| 2112 | DALLAS | TX | I | R | T | 13 | 10 | Y | 0 | 0 | 0 | M | 2004-01-07 | |||
| We have 13 new primed 6 panel doors with unprimed trim. The windows are new vinyl but need casements and trim primed and painted. One level home approx 1500 sq ft.We also need 350 ft of 3 1/4" base installed throughout house and painted. | ||||||||||||||||
| 2111 | MARIGOLD | CA | I | R | W | 4 | 8 | N | 20 | 90 | 10 | M | 2004-01-07 | |||
| I want the living area of my new house painted. The square footage of the area is around 1800. The walls are around 10 feet high. The home is in Redlands at Sunset Hills the new houses being built on Creekside off of Alessandro near San Timeteo Canyon. Fo | ||||||||||||||||
| 2110 | MOUNT AIRY | MD | I | R | W | 0 | 0 | N | 0 | 0 | 0 | H | 2004-01-07 | |||
| We some one who works with drywall repairs as well. We have a new home with a great deal of nail pops, ceiling work will be our greatest focus. | ||||||||||||||||
| 2109 | DALLAS | TX | I | R | B | 16 | 17 | Y | 1 | 1 | 1 | H | 2004-01-06 | |||
| prep, paint walls, ceiling and trim. Caulk around trim where needed. Approximately 2500 square feet. 12 foot ceilings first floor, 9 foot ceilings 2nd floor. | ||||||||||||||||
| 2108 | AUSTIN | TX | E | R | B | 0 | 6 | Y | 60 | 30 | 8 | M | 2004-01-06 | |||
| 2107 | GREENWOOD VILLAGE | CO | I | R | B | 0 | 0 | Y | 30 | 20 | 8 | H | 2004-01-06 | |||
| Approx 600 sq ft. (includes 1 bedroom and hallway) paint will be supplied by owner. no ceilings. Bedroom needs to have existing wallpaper sealed, then textured and painted over. | ||||||||||||||||
| 2106 | BOWIE | MD | E | R | B | 12 | 0 | Y | 60 | 30 | 8 | H | 2004-01-06 | |||
| live in a 3 level townhouse in mitcheville,would like a quality job done at good prices. Only interested in bonded contractor for this job. would like to get job done as soon as possible, thanks | ||||||||||||||||
| 2105 | NEWBERRY | PA | I | R | B | 4 | 7 | Y | 36 | 40 | 36 | M | 2004-01-06 | |||
| 4 rooms,1 hallway | ||||||||||||||||
| 2104 | POWDER SPRINGS | GA | E | R | T | 0 | 6 | Y | 60 | 30 | 12 | H | 2004-01-05 | |||
| Need soffits and fascia prepped(some re-nailing), painted, and caulked. | ||||||||||||||||
| 2102 | ALDERWOOD MANOR | WA | I | R | W | 0 | 0 | N | 28 | 30 | 10 | M | 2004-01-04 | |||
| Is a duplexs 2 bedrooms, 1 1/2 bathrooms, 1 small hallway, a stairway, living room, small dining room, and kitchen plus 4 small closets. I would like a coat of primer and 1 coat of finish paint i will provide paint. there will be no need to cover floors a | ||||||||||||||||
| 2101 | ALDERWOOD MANOR | WA | I | R | W | 0 | 0 | N | 28 | 30 | 10 | M | 2004-01-04 | |||
| Is a duplexs 2 bedrooms, 1 1/2 bathrooms, 1 small hallway, a stairway, living room, small dining room, and kitchen plus 4 small closets. I would like a coat of primer and 1 coat of finish paint i will provide paint. there will be no need to cover floors a | ||||||||||||||||
| 2100 | ALDERWOOD MANOR | WA | I | R | W | 0 | 0 | N | 10 | 8 | 10 | M | 2004-01-04 | |||
| Is a two story condominium, it includes two bedrooms,one and a half bathrooms, a small hallway,stairs,livingroom,small diningroom, kitchen,and four small closets. I want one primer coat and one paint coat there are three walls with holes that need to be p | ||||||||||||||||
| 2099 | ALDERWOOD MANOR | WA | I | R | W | 0 | 0 | N | 10 | 8 | 10 | M | 2004-01-04 | |||
| Is a two story condominium, it includes two bedrooms,one and a half bathrooms, a small hallway,stairs,livingroom,small diningroom, kitchen,and four small closets. I want one primer coat and one paint coat there are three walls with holes that need to be p | ||||||||||||||||
| 2098 | ALDERWOOD MANOR | WA | I | R | W | 0 | 0 | N | 10 | 8 | 10 | M | 2004-01-04 | |||
| Is a two story condominium, it includes two bedrooms,one and a half bathrooms, a small hallway,stairs,livingroom,small diningroom, kitchen,and four small closets. I want one primer coat and one paint coat there are three walls with holes that need to be p | ||||||||||||||||
| 2097 | CLEARWATER | FL | I | C | B | 2 | 4 | Y | 80 | 213 | 10 | M | 2004-01-04 | |||
| 2096 | ATTLEBORO | MA | I | R | W | 0 | 0 | N | 34 | 12 | 8 | H | 2004-01-03 | |||
| Need living room, family room, foyer area including up the stairs and upstairs hallway completed. Curious about rag rolling, etc. | ||||||||||||||||
| 2095 | AGOURA | CA | I | R | B | 0 | 0 | Y | 115 | 142 | 10 | M | 2004-01-02 | |||
| 2094 | ALEXANDRIA | VA | I | R | W | 99 | 99 | N | 10 | 12 | 14 | M | 2004-01-02 | |||
| 2093 | BELOIT | IL | I | R | B | 0 | 0 | N | 0 | 0 | 8 | M | 2004-01-02 | |||
| Looking for someone to paint just the ceilings of our ranch home. We need nothing else painted, unless a discount would be involved to paint extra rooms. | ||||||||||||||||
| 2092 | MURRAYVILLE | GA | I | R | B | 1 | 1 | Y | 15 | 15 | 9 | H | 2004-01-02 | |||
| ceiling to paint & all woodwork ,walls to be papered please quote labor & paint/wallpaper sperate | ||||||||||||||||
| 2091 | MURRAYVILLE | GA | I | R | B | 1 | 1 | Y | 15 | 15 | 9 | H | 2004-01-02 | |||
| bid to include labor & materials seperate | ||||||||||||||||
| 2090 | MURRAYVILLE | GA | I | R | B | 1 | 1 | Y | 15 | 15 | 9 | H | 2004-01-02 | |||
| bid to include labor & materials seperate | ||||||||||||||||
| 2089 | MURRAYVILLE | GA | E | R | B | 2 | 10 | Y | 60 | 30 | 9 | H | 2004-01-02 | |||
| to prepare & fill to all woodwork inc knotting 1 undercoat & 1 topcoat ,please bid labor & materials seperate | ||||||||||||||||
| 2088 | MURRAYVILLE | GA | E | R | B | 2 | 10 | Y | 60 | 30 | 9 | H | 2004-01-02 | |||
| to prepare & fill to all woodwork inc knotting 1 undercoat & 1 topcoat ,please bid labor & materials seperate | ||||||||||||||||
| 2087 | CENTREVILLE | VA | I | R | B | 19 | 20 | Y | 24 | 32 | 10 | H | 2004-01-02 | |||
| The project is for the complete interior of a three level, three bedroom,three and one half ba with garage end unit. drywall repair and nail pops. twenty five hundred sq feet. six closets plus enough paint for garage interior. Minor patching and reinforc | ||||||||||||||||
| 2086 | WEST CHESTER | PA | I | R | B | 0 | 3 | Y | 16 | 20 | 20 | H | 2004-01-02 | |||
| 12' x 17' great room / 2 story / open room fireplace on one wall (fireplace not to be painted) Please send me two prices. Quality: Medium and High. Thank you. | ||||||||||||||||
| 2085 | WEST CHESTER | PA | I | R | B | 0 | 3 | Y | 16 | 20 | 20 | H | 2004-01-02 | |||
| 12' x 17' great room / 2 story / open room fireplace on one wall (fireplace not to be painted) Please send me two prices. Quality: Medium and High. Thank you. | ||||||||||||||||
| 2084 | OWINGS MILLS | MD | I | R | B | 0 | 0 | N | 0 | 0 | 0 | M | 2004-01-02 | |||
| 2083 | ALDERWOOD MANOR | WA | I | R | W | 0 | 0 | N | 0 | 0 | 0 | H | 2004-01-01 | |||
| 3 bedrooms total 47x47x8 1 Foyer & stairwell 7x12x18'(two walls) 1 Living Room 14x16x10 1 Kitchen/Living Room 12x10x10 (two walls, mainly partials I have chosen colors all ready. Relatively easy to paint. New home/walls that need special sealant or pr | ||||||||||||||||
| 2082 | SAN ANTONIO | TX | E | R | B | 2 | 9 | Y | 42 | 66 | 8 | M | 2004-01-01 | |||
| single story ranch style, 2 car garage. Cabana outside needs painted too, 36x12 | ||||||||||||||||
| 2081 | HENDERSONVILLE | NC | I | R | B | 15 | 15 | Y | 999 | 1 | 6 | H | 2003-12-31 | |||
| /////////////// | ||||||||||||||||
| 2080 | HENDERSONVILLE | NC | I | R | B | 15 | 15 | Y | 1 | 999 | 6 | H | 2003-12-31 | |||
| /////////////// | ||||||||||||||||
| 2079 | HENDERSONVILLE | NC | I | R | B | 15 | 15 | Y | 1 | 300 | 6 | H | 2003-12-31 | |||
| /////////////// | ||||||||||||||||
| 2078 | JENKINS | MO | I | R | B | 3 | 1 | N | 14 | 20 | 9 | M | 2003-12-30 | |||
| 2077 | HOLLYWOOD | FL | E | R | B | 1 | 0 | Y | 40 | 70 | 15 | H | 2003-12-30 | |||
| one story house. 3 bedrooms. exterior measurements are only estimation. | ||||||||||||||||
| 2076 | DERWOOD | MD | I | R | B | 3 | 1 | Y | 8 | 10 | 7 | M | 2003-12-30 | |||
| We have a small bedroom to paint. It is in decent condition. We would like to paint the walls one color and the baseboard, trim and ceiling white. | ||||||||||||||||
| 2075 | PLAINFIELD | IL | I | R | W | 0 | 3 | N | 12 | 15 | 8 | M | 2003-12-29 | |||
| Master bedroom | ||||||||||||||||
| 2074 | PLAINFIELD | IL | I | R | W | 0 | 3 | N | 12 | 15 | 8 | H | 2003-12-29 | |||
| Master bedroom | ||||||||||||||||
| 2073 | PLAINFIELD | IL | I | R | W | 0 | 3 | N | 18 | 23 | 15 | H | 2003-12-29 | |||
| family room with vaulted ceiling and 2 skylights | ||||||||||||||||
| 2072 | PLAINFIELD | IL | I | R | W | 0 | 3 | N | 18 | 23 | 15 | M | 2003-12-29 | |||
| family room with vaulted ceiling and 2 skylights | ||||||||||||||||
| 2071 | GERMANTOWN | MD | I | R | W | 0 | 0 | N | 59 | 68 | 10 | H | 2003-12-29 | |||
| Moving into new home (4 yrs old). 4-6 rooms to be painted before I move in. | ||||||||||||||||
| 2070 | NORTH BETHESDA | MD | I | R | B | 12 | 10 | Y | 0 | 0 | 0 | H | 2003-12-29 | |||
| 2 level condominium with some wall paper removal required. A total of about 1300 square feet are included. | ||||||||||||||||
| 2069 | CINCINNATI | OH | I | R | W | 2 | 1 | Y | 12 | 20 | 9 | M | 2003-12-29 | |||
| Paint our main bathroom walls. Walls apprear to always be wet, due to the fact we do not have a ventilation system in our shower. Second project is to paint our stairwell heading upstairs, as well as inside one closet and the upstairs hallway. | ||||||||||||||||
| 2068 | MAHWAH | NJ | I | R | W | 0 | 0 | N | 0 | 0 | 8 | H | 2003-12-29 | |||
| i need my kitchen, living room, dining room, hallways, two bedrooms and two bathrooms painted. They were all just painted in August but I just bought the place and want different colors. | ||||||||||||||||
| 2067 | BOOTH | TX | I | R | B | 0 | 9 | Y | 1 | 27 | 6 | H | 2003-12-29 | |||
| Paint interior of approx. 1300sq.ft. | ||||||||||||||||
| 2066 | NEW YORK | NY | I | R | W | 10 | 7 | N | 40 | 30 | 10 | M | 2003-12-28 | |||
| Would also like the floors polished and bathtubs glazed | ||||||||||||||||
| 2065 | CLEMENTON | NJ | E | R | B | 0 | 0 | Y | 0 | 0 | 0 | M | 2003-12-28 | |||
| I am a painting contractor in south jersey quality work reasonable prices contact at angll657@aol.com | ||||||||||||||||
| 2064 | GUADALUPE | AZ | I | R | B | 13 | 11 | Y | 57 | 40 | 8 | M | 2003-12-27 | |||
| 2063 | NORCROSS | GA | E | R | B | 5 | 16 | Y | 80 | 40 | 10 | H | 2003-12-26 | |||
| Stucco home. Needs exterior paint. We want to change color so will probably need two coats. Want to start when weather if above 50 F. | ||||||||||||||||
| 2062 | JUNEAU | AK | I | R | B | 0 | 0 | N | 26 | 60 | 8 | M | 2003-12-25 | |||
| total square footages is 12000sqrft of walls&ceilings 2level home | ||||||||||||||||
| 2061 | JUNEAU | AK | I | R | B | 0 | 0 | N | 26 | 60 | 8 | M | 2003-12-25 | |||
| total square footages is 12000sqrft of walls&ceilings 2level home | ||||||||||||||||
| 2060 | ZACHARY | LA | E | C | B | 0 | 0 | Y | 25 | 25 | 10 | H | 2003-12-23 | |||
| 2059 | ZACHARY | LA | E | R | B | 0 | 0 | Y | 25 | 25 | 10 | H | 2003-12-23 | |||
| 2058 | PHILA | PA | I | R | B | 27 | 12 | Y | 22 | 40 | 9 | M | 2003-12-23 | |||
| We are closing on this house on Jan. 5th and having a baby on or around Feb 19th and hope to have the interior of the house painted before then. The home has 3 stories plus half of the basement is finished. | ||||||||||||||||
| 2057 | LAUREL | MD | I | R | B | 7 | 9 | Y | 2 | 6 | 6 | H | 2003-12-23 | |||
| Three stories townhouse. Just want an estimate on labor. Will buy himself paint. | ||||||||||||||||
| 2056 | GREENWOOD VILLAGE | CO | E | R | B | 2 | 10 | Y | 30 | 60 | 8 | M | 2003-12-23 | |||
| 2055 | COAL CREEK | WA | I | R | W | 0 | 0 | N | 0 | 0 | 0 | M | 2003-12-20 | |||
| New house, walls currently painted white. House is 3000 sq ft. Want walls painted in colors not available thru builder. No furniture in house. No trim, doors, celings,etc. No prep work except covering trim, floors,cabinets,etc | ||||||||||||||||
| 2054 | SCOTTSDALE | AZ | I | R | W | 7 | 5 | Y | 66 | 54 | 8 | M | 2003-12-20 | |||
| 3BRD- 1LIVING -1DINE INCLUDE CEILING | ||||||||||||||||
| 2053 | FLORENCE | OR | E | R | B | 2 | 4 | N | 30 | 50 | 10 | H | 2003-12-18 | |||
| 2052 | SCOTTSDALE | AZ | I | R | W | 1 | 1 | Y | 12 | 12 | 8 | M | 2003-12-18 | |||
| 1 bdr include ceiling | ||||||||||||||||
| 2051 | SCOTTSDALE | AZ | I | R | W | 7 | 4 | Y | 82 | 66 | 8 | H | 2003-12-18 | |||
| 3bdr 1living 1dine include ceilings bdr14x12 all 3 of them living28x20 dine12x10 | ||||||||||||||||
| 2050 | BURIEN | WA | E | R | B | 1 | 8 | Y | 0 | 0 | 0 | H | 2003-12-18 | |||
| Exterior only One story, 900 sq ft 1927 West Seattle house. wood siding with some cracks that will need to be caulked prior to repainting lots of peeling paint What do you do abt lead paint clean-up Thank you | ||||||||||||||||
| 2049 | ELGIN | IL | I | R | B | 5 | 10 | N | 15 | 14 | 10 | L | 2003-12-18 | |||
| 2048 | FAIR LAWN | NJ | I | R | T | 2 | 11 | N | 1 | 1 | 1 | H | 2003-12-18 | |||
| want to have the doors and window frames stripped of old paint (it's already chipping in places down to the original wood)and the original chesnut refinished | ||||||||||||||||
| 2047 | GULF GATE BRANCH | FL | E | R | T | 2 | 0 | Y | 3 | 1 | 6 | M | 2003-12-17 | |||
| Need new steel front door painted and trim around it inside and out. Also need new 15 lite french doors (one set)-back of house painted inside and out, trim as well. | ||||||||||||||||
| 2046 | GULF GATE BRANCH | FL | E | R | T | 2 | 0 | Y | 3 | 6 | 6 | H | 2003-12-17 | |||
| Need new steel front door painted and trim around it inside and out. Also need new 15 lite french doors (one set)-back of house painted inside and out, trim as well. | ||||||||||||||||
| 2045 | CLEVELAND | OH | E | R | B | 0 | 16 | Y | 30 | 20 | 2 | H | 2003-12-16 | |||
| 2.5 story dutch colonial. narrow lap siding on lower 2/3rds of house. Shake shingles on upper 3rd. I do not believe there is an overhang. Base color and 1 trim color. House will need scraping. Only trim around windows needs painted. | ||||||||||||||||
| 2044 | ROCKVILLE | MD | I | R | B | 13 | 10 | Y | 20 | 30 | 8 | H | 2003-12-14 | |||
| about 1200 square feet of home. regular 8 ft. ceilings on two separate floors. kitchen, dining, living and 3 bedrooms, 2 baths. | ||||||||||||||||
| 2043 | NEW YORK | NY | E | R | B | 3 | 4 | Y | 30 | 4 | 7 | L | 2003-12-14 | |||
| ghfg | ||||||||||||||||
| 2042 | NEW YORK | NY | E | R | B | 3 | 4 | Y | 30 | 4 | 7 | L | 2003-12-14 | |||
| ghfg | ||||||||||||||||
| 2041 | SOUTH PLAINFIELD | NJ | I | R | B | 8 | 5 | Y | 68 | 77 | 68 | H | 2003-12-12 | |||
| Total Living Area length width sq feet living 20 12 240 dining 12 10 120 1bed 14 13 182 2 bed 10 10 100 3 bed 10 13 130 kitchen 11 10 110 | ||||||||||||||||
| 2040 | FLORISSANT | MO | I | R | B | 4 | 4 | Y | 20 | 20 | 12 | M | 2003-12-11 | |||
| I need painting done before the holiday. I have a great room and kitchen with vaulted ceilings that need painting. I also need the hallway and 1 bedroom painted. | ||||||||||||||||
| 2039 | ANTHONY | IN | I | R | W | 0 | 0 | N | 64 | 55 | 10 | M | 2003-12-11 | |||
| 2 bedrooms, one 9'x10', one 10'x 11'. 1 living room 14'x12'. 1 dinning room 10'x10'. Kitchen 8'x 12'. 1 Hallway 8'x 4'. 1 small bathroom 5'x 8'. No trim, window, or door painting. Paint walls and ceilings in all rooms except kitchen. In Kitchen paint | ||||||||||||||||
| 2038 | HAZELWOOD | WA | I | R | B | 2 | 4 | Y | 15 | 11 | 12 | M | 2003-12-11 | |||
| 2037 | HAZELWOOD | WA | I | R | W | 2 | 5 | Y | 15 | 11 | 12 | M | 2003-12-11 | |||
| 2036 | FORT WORTH | TX | I | R | W | 2 | 3 | N | 14 | 20 | 15 | M | 2003-12-10 | |||
| I am looking for the faux brick and plaster look...the area is roughly 600 sf (with vaulted ceilings) | ||||||||||||||||
| 2035 | FORT WORTH | TX | I | R | W | 2 | 3 | N | 14 | 20 | 20 | M | 2003-12-10 | |||
| I am looking for the faux brick and plaster look...the area is roughly 600 sf (with vaulted ceilings) | ||||||||||||||||
| 2034 | DEER PARK | TX | I | R | B | 0 | 0 | Y | 22 | 16 | 9 | M | 2003-12-10 | |||
| There is brown siding in the living room. We are wanting to paint over it and do the kitchen cabinets that are the same color. There is a large firplace in the room and a back door with windows takes up much of the other wall. | ||||||||||||||||
| 2033 | MANCHESTER | NH | I | R | W | 3 | 1 | N | 20 | 17 | 8 | M | 2003-12-10 | |||
| I needed the interior of my 1800 sq foot home painted, it already has one coat of streaky poorly done painting on it. | ||||||||||||||||
| 2032 | FAIRFAX | VA | I | R | B | 0 | 0 | Y | 12 | 12 | 17 | H | 2003-12-10 | |||
| Foyer- high cieling and curved staircase Living Room- open floor plan with 17-20 ft cieling upstairs hallway- overlooks foyer and living room | ||||||||||||||||
| 2030 | EAST BERNSTADT | KY | I | R | W | 0 | 0 | N | 20 | 12 | 8 | H | 2003-12-09 | |||
| 2029 | SPEEGLEVILLE | TX | E | R | B | 18 | 10 | Y | 50 | 60 | 8 | H | 2003-12-09 | |||
| 2028 | SPEEGLEVILLE | TX | E | R | B | 18 | 10 | Y | 40 | 60 | 8 | H | 2003-12-09 | |||
| new house being built, with cabinets to be finished in kitchen and both bathrooms (vanities). Outside to be painted one color outside enamel, inside wall paint on walls, cielings flat wall, another color and enamel on doors, trim and crown molding in livi | ||||||||||||||||
| 2027 | EVANSTON | IL | I | R | T | 16 | 15 | Y | 0 | 0 | 0 | H | 2003-12-09 | |||
| All trim throughout apartment. liv rm(23x14, 3 wind,frplc,bookshelf) din rm(16x14,3 wind 1dr)w/crown molding. 3 bedrm (10x12, 15x14, 15x14 7 wind, 8 drs) foyer and hall (8x6, 3x12, 4drs) kit (10x14,1wind 1dr) bath (1wind,2drs) | ||||||||||||||||
| 2026 | LIVE OAK | TX | I | R | B | 0 | 0 | Y | 0 | 30 | 12 | M | 2003-12-09 | |||
| 2025 | EAST BERNSTADT | KY | I | R | W | 2 | 4 | Y | 20 | 43 | 8 | M | 2003-12-08 | |||
| 2024 | MAGNOLIA | TX | E | R | B | 3 | 2 | N | 32 | 54 | 20 | M | 2003-12-08 | |||
| New construction. Large 3 car garage with 3 car carport. Hardy plank. Front of garage is brick - no paint. Requires caulking. Ready to start. | ||||||||||||||||
| 2023 | EAST BERNSTADT | KY | I | R | B | 1 | 2 | Y | 12 | 12 | 8 | M | 2003-12-08 | |||
| 2022 | EAST BERNSTADT | KY | I | R | B | 1 | 2 | Y | 12 | 12 | 8 | H | 2003-12-08 | |||
| 2021 | EAST BERNSTADT | KY | I | R | B | 1 | 2 | Y | 12 | 12 | 8 | M | 2003-12-08 | |||
|
|