![]() |
![]() |
|
|
5931 Available Projects
From November 3, 2002 to Today
Contractors: please click on Login button above to login and submit bids on these projects.
Column heading buttons: click on the one you wish to sort by (e.g. click on RC to see all commercial jobs first and residential jobs second, or click on State button to sort by State, etc.).
Column Definitions: ID=Reference Number, IE=Interior/Exterior, RC=Residential/Commercial, P=Paint Walls/Trim/Both, D=# of Doors, Win=# of Windows, OB=Overhang/Baseboard paint Yes/No, W=Width in feet, L=Length in feet, H=Height in feet, Q=Quality Low/Medium/High.
Results Page(s) (100 per page): 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60
| ID | City | State | IE | RC | P | D | Win | OB | W | L | H | Q | Posted | |||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | ||||||||||||||||
| 1700 | GOLD RIVER | CA | E | R | B | 0 | 0 | Y | 60 | 40 | 10 | H | 2003-10-21 | |||
| We have two thousand one hundred sq ft of paintable surface the above width length and height figures are estimates | ||||||||||||||||
| 1699 | CINCINNATI | OH | I | R | W | 0 | 0 | N | 15 | 17 | 8 | H | 2003-10-21 | |||
| we have a dining room that we need painted red. only 1/3 of the wall. we will be putting wainscoting up after the paint is on the deminsions above are approximate | ||||||||||||||||
| 1698 | MESA | AZ | I | R | B | 2 | 2 | Y | 21 | 45 | 8 | H | 2003-10-20 | |||
| On large living room with 2 picture windows | ||||||||||||||||
| 1697 | CORONA | CA | I | R | W | 3 | 0 | Y | 0 | 0 | 0 | H | 2003-10-20 | |||
| Paint kitchen, dining room, bedroom, master bedroom and bathroom | ||||||||||||||||
| 1696 | MESA | AZ | I | R | B | 14 | 13 | Y | 30 | 50 | 12 | M | 2003-10-20 | |||
| I want the walls to be washable when complete. | ||||||||||||||||
| 1695 | WASHINGTON | DC | I | C | B | 0 | 14 | Y | 25 | 125 | 10 | H | 2003-10-20 | |||
| 3000 sq feet office space ceilings are tiled | ||||||||||||||||
| 1694 | FAIRWAY | KS | E | R | B | 3 | 7 | Y | 15 | 60 | 8 | H | 2003-10-20 | |||
| Cedar Siding 2 bedroom house. Have the paint. | ||||||||||||||||
| 1693 | PEORIA | AZ | I | R | B | 1 | 3 | Y | 35 | 30 | 16 | M | 2003-10-20 | |||
| 1692 | PEORIA | AZ | I | R | B | 1 | 3 | Y | 35 | 30 | 16 | M | 2003-10-20 | |||
| 1691 | CANOGA PARK | CA | E | R | B | 4 | 9 | Y | 45 | 35 | 10 | M | 2003-10-20 | |||
| Windows are aluminum and don't need paint.Door count includes slider. House is approx 1600 sq ft. | ||||||||||||||||
| 1690 | DULLES | VA | I | R | B | 1 | 1 | Y | 44 | 53 | 8 | H | 2003-10-20 | |||
| 1689 | WINCHESTER | VA | I | R | B | 1 | 1 | Y | 44 | 53 | 8 | H | 2003-10-20 | |||
| 1688 | HERNDON | VA | I | R | W | 1 | 1 | Y | 44 | 53 | 8 | H | 2003-10-20 | |||
| 1687 | SANTA CRUZ | CA | I | R | B | 7 | 9 | Y | 40 | 57 | 56 | M | 2003-10-20 | |||
| -(upstairs only) 4 rooms total, stairwell/hallway and ceilings -no drop cloth needed, will replace carpets after paint -door frames only (doors natural wood) -3 bdrooms have vaulted ceilings 16'to 8' -1 bdroom is 10x12x8 -stairwell 24' max height | ||||||||||||||||
| 1686 | PAXTONIA | PA | I | R | W | 0 | 0 | N | 14 | 20 | 9 | M | 2003-10-20 | |||
| family room new build, painters grade 1st coat is on the walls we will want only the walls painted, no trim. Paint to be in a satin color to be determined, adjacent kitchen also 14x20 ish many cabinets will be considered if you will bid on it, | ||||||||||||||||
| 1685 | LAKE RIDGE | VA | I | C | W | 1 | 1 | Y | 44 | 53 | 8 | H | 2003-10-20 | |||
| 1684 | SANTA ROSA | CA | I | R | B | 0 | 0 | N | 50 | 30 | 8 | M | 2003-10-20 | |||
| 2 beds 2 1/2 bath, living, dining, 2 halls, stairwell, kitchen | ||||||||||||||||
| 1683 | SANTA ROSA | CA | I | R | B | 0 | 0 | N | 50 | 30 | 8 | M | 2003-10-20 | |||
| 2 beds 2 1/2 bath, living, dining, 2 halls, stairwell, kitchen | ||||||||||||||||
| 1682 | WASHINGTON | DC | I | C | B | 1 | 13 | Y | 25 | 125 | 10 | H | 2003-10-20 | |||
| Office space 3000 square feet, tiled ceilings | ||||||||||||||||
| 1681 | WASHINGTON | DC | I | R | W | 1 | 1 | Y | 4 | 10 | 9 | M | 2003-10-20 | |||
| I have two small rooms that I am interested in painting. | ||||||||||||||||
| 1680 | HAMILTON | NJ | I | R | B | 3 | 4 | Y | 12 | 10 | 10 | L | 2003-10-20 | |||
| House is being put on market for sale. Prep work has been done on walls where cacks were. Hallway up and downstairs. Living Room & Dining Room. | ||||||||||||||||
| 1679 | CARROLLTON | TX | I | R | B | 2 | 0 | Y | 10 | 15 | 9 | H | 2003-10-20 | |||
| bedroom | ||||||||||||||||
| 1678 | NEW ROCHELLE | NY | I | R | B | 0 | 0 | Y | 0 | 0 | 0 | H | 2003-10-20 | |||
| I need a master bedroom, a library, and living room space painted. All the moldings as well. | ||||||||||||||||
| 1676 | VAN NUYS | CA | I | R | W | 0 | 0 | Y | 34 | 20 | 25 | H | 2003-10-19 | |||
| Prep would involve removing wall paper from 1 room and 2 hallways. Painting all 3. Some patch work on the walls. | ||||||||||||||||
| 1675 | HOUSTON | TX | I | R | B | 9 | 4 | N | 3 | 60 | 80 | M | 2003-10-19 | |||
| 3bed, 2 bath with study & converted patio. | ||||||||||||||||
| 1674 | LUCKETTS | VA | I | R | W | 0 | 0 | N | 20 | 10 | 10 | H | 2003-10-19 | |||
| Living room Dining room Family room Master bedroom Each room approximately six hundred sq ft of painting surface Walls only approximately twenty-four hundred total sq ft of painting surface We will provide paint | ||||||||||||||||
| 1673 | BERLIN | MD | I | R | B | 2 | 5 | Y | 25 | 25 | 15 | H | 2003-10-19 | |||
| walls & ceilings for greatroom/dining w/ high ceiling, small kitchen, sunroom. | ||||||||||||||||
| 1672 | PORT ORCHARD | WA | I | R | W | 0 | 0 | N | 31 | 37 | 8 | M | 2003-10-18 | |||
| no prep | ||||||||||||||||
| 1671 | PORT ORCHARD | WA | E | R | W | 0 | 0 | N | 31 | 37 | 9 | H | 2003-10-18 | |||
| 1670 | PORT ORCHARD | WA | I | R | W | 0 | 0 | N | 10 | 12 | 8 | M | 2003-10-18 | |||
| also bedroom that is 14 X 17 with 7.5 high and living room 13 X 17 with 9 ft high, no ceilings, prep, trim or baseboard and doors | ||||||||||||||||
| 1669 | LIBERTY | MO | E | R | B | 3 | 9 | Y | 35 | 45 | 18 | M | 2003-10-18 | |||
| 1668 | EUGENE | OR | I | R | B | 1 | 1 | Y | 20 | 15 | 19 | H | 2003-10-18 | |||
| living room with vaulted ceiling. Two large sheetrock seams to repair | ||||||||||||||||
| 1667 | TEWKSBURY | MA | I | R | B | 0 | 2 | Y | 8 | 14 | 8 | H | 2003-10-17 | |||
| the popcorn celing needs painting as well | ||||||||||||||||
| 1666 | GIG HARBOR | WA | I | R | B | 3 | 14 | Y | 40 | 70 | 22 | H | 2003-10-17 | |||
| new contruction not stated yet but will need bid 2776 SF 2 story one garage door, 2 sliding doors, 2 man doors 14 windows 9 rooms, 3 bathrooms, colors will vary | ||||||||||||||||
| 1665 | GIG HARBOR | WA | E | R | B | 3 | 14 | Y | 40 | 70 | 22 | H | 2003-10-17 | |||
| new contruction not stated yet but will need bid 2776 SF 2 story one garage door, 2 sliding doors, 2 man doors 14 windows colors thinking Brown exterior walls Burgandy/Purple trim | ||||||||||||||||
| 1664 | COLUMBIA | MD | I | R | W | 1 | 0 | N | 20 | 18 | 20 | M | 2003-10-17 | |||
| I am not sure of height it is cathedral ceiling. 20x18 room I think. I alos need two small bathroom ceilings painted and maybe a loft room if the price is good. | ||||||||||||||||
| 1663 | GAINESVILLE | VA | E | R | T | 2 | 0 | Y | 53 | 44 | 18 | H | 2003-10-17 | |||
| Our home is a brick front with vinyl siding. The home is only four years old. We need some minor trim repairs. The windows are all vinyl so no painting required for them. | ||||||||||||||||
| 1662 | LAKE ELSINORE | CA | E | R | B | 2 | 2 | N | 30 | 20 | 10 | H | 2003-10-17 | |||
| 20 BY 30 FEET GARAGE NEED TO BE STUCCO | ||||||||||||||||
| 1661 | LAKE ELSINORE | CA | E | R | B | 2 | 2 | N | 30 | 20 | 10 | H | 2003-10-17 | |||
| 20 BY 30 FEET GARAGE NEED TO BE STUCCO | ||||||||||||||||
| 1660 | LA MIRADA | CA | E | R | B | 2 | 9 | Y | 45 | 35 | 8 | H | 2003-10-17 | |||
| Single Story, New replacement windows do not need painting, eaves same color as stucco, 3 color scheme, insist on Vista Paint being used, colors are to be similar to existing. | ||||||||||||||||
| 1659 | SAN JOSE | CA | I | R | B | 0 | 0 | N | 0 | 0 | 0 | M | 2003-10-16 | |||
| We have a 3 bedroom,living room, 2 bath apt. a total of 1300 SF. We need it painted each room different color and one of the room posibly each wall different color. We need a quote. Thanks | ||||||||||||||||
| 1658 | DES MOINES | IA | I | R | B | 1 | 4 | Y | 25 | 12 | 8 | M | 2003-10-16 | |||
| Simple job. Only needing main living room painted. Room is rectangular in shape, about 300 sq feet. Needs ceiling, walls, baseboards, around windows painted. All one color. I can provide the paint. | ||||||||||||||||
| 1657 | GLASTONBURY | CT | I | R | B | 4 | 4 | N | 0 | 0 | 0 | M | 2003-10-16 | |||
| Small condo 1 bedroom, 1 bathroom, living room, and kichen. I don't have exact room dimensions. Total condo size is 625 Sq. Ft. The walls are in good condition. I just need a fresh coat of paint before moving in. The condo is EMPTY so no furniture mov | ||||||||||||||||
| 1656 | LAUREL | MD | E | R | B | 0 | 0 | Y | 0 | 0 | 0 | M | 2003-10-16 | |||
| Exterior stain for a 3 level end unit townhouse. | ||||||||||||||||
| 1655 | LAUREL | MD | E | R | B | 0 | 0 | Y | 0 | 0 | 0 | M | 2003-10-16 | |||
| Exterior stain for a 3 level end unit townhouse. | ||||||||||||||||
| 1654 | LOCKPORT | IL | I | R | W | 0 | 0 | N | 663 | 629 | 9 | H | 2003-10-16 | |||
| We have purchased the paint already from Ace Hardware. We just don't have the time to do the painting now. we are looking to paint 4 rooms. Kitchen, family rm, living rm, dining rm. We will move any furniture. | ||||||||||||||||
| 1653 | LOCKPORT | IL | I | R | W | 0 | 0 | N | 663 | 629 | 9 | H | 2003-10-16 | |||
| We have purchased the paint already from Ace Hardware. We just don't have the time to do the painting now. we are looking to paint 4 rooms. Kitchen, family rm, living rm, dining rm. We will move any furniture. | ||||||||||||||||
| 1652 | LOCKPORT | IL | I | R | W | 0 | 0 | N | 663 | 629 | 9 | H | 2003-10-16 | |||
| We have purchased the paint already from Ace Hardware. We just don't have the time to do the painting now. we are looking to paint 4 rooms. Kitchen, family rm, living rm, dining rm. We will move any furniture. | ||||||||||||||||
| 1651 | ELK GROVE VILLAGE | IL | I | R | W | 0 | 8 | Y | 30 | 60 | 8 | M | 2003-10-16 | |||
| One room - the great room has 17 foot walls - the other rooms are 8' - please include in the quote painting of the ceiling in the 17' room only. | ||||||||||||||||
| 1650 | ELK GROVE VILLAGE | IL | I | R | W | 0 | 8 | Y | 30 | 60 | 8 | M | 2003-10-16 | |||
| One room - the great room has 17 foot walls - the other rooms are 8' - please include in the quote painting of the ceiling in the 17' room only. | ||||||||||||||||
| 1649 | ROCKLAND | MA | E | R | T | 0 | 9 | Y | 3 | 40 | 0 | M | 2003-10-16 | |||
| Need prep, prime and paint of exterior windows and trim of small cape. | ||||||||||||||||
| 1648 | BRENTWOOD | CA | I | R | W | 3 | 8 | Y | 60 | 40 | 9 | H | 2003-10-15 | |||
| This quote request is for the bottom story of a two story home located in Parkview neighborhood of Garin Ranch in Brentwood. | ||||||||||||||||
| 1647 | HOUSTON | TX | I | C | W | 8 | 3 | Y | 20 | 60 | 8 | H | 2003-10-15 | |||
| new build, no texture, ceilings also. Please indicate price per square foot for primer, 2 coats eggshell paint. ceilings also. | ||||||||||||||||
| 1646 | INDIANAPOLIS | IN | E | R | B | 0 | 0 | N | 0 | 0 | 0 | M | 2003-10-15 | |||
| 800 sq foot home small 2 story - old aluminium siding white. and 2 1/2 car detached garage Wanting spray over with white or hand painted. Prefer spray. Need estimates rough idea | ||||||||||||||||
| 1645 | TUSTIN | CA | I | R | W | 0 | 0 | N | 26 | 34 | 10 | H | 2003-10-15 | |||
| Master bedroom, master bath, and kitchen need wallpaper removal and paint. | ||||||||||||||||
| 1644 | JERSEY CITY | NJ | I | C | B | 2 | 0 | N | 0 | 0 | 0 | M | 2003-10-15 | |||
| Those interested in bidding should call me at 703.503.5555 ask for estimating. The project is a SaladWorks Restaurant in Jersey City New Jersey. Start Date TBD bids due by October 24, 2003. Plans willbe overnighted. | ||||||||||||||||
| 1643 | OLATHE | KS | I | R | B | 4 | 7 | Y | 28 | 32 | 8 | M | 2003-10-14 | |||
| 1642 | NAPLES | FL | I | R | B | 10 | 0 | Y | 20 | 45 | 9 | M | 2003-10-14 | |||
| total floor square footage is 1800 square feet with 9 foot ceilings | ||||||||||||||||
| 1641 | MINNEAPOLIS | MN | I | R | W | 0 | 0 | N | 12 | 12 | 18 | M | 2003-10-14 | |||
| I am looking for someone to paint the walls going to the upstairs of my home. The walls are fairly high in spots...maybe 20 feet. The area is actaually pretty small though... your average staircase with walls high on the left and only halfway up, more o | ||||||||||||||||
| 1640 | SACRAMENTO | CA | E | R | B | 2 | 4 | Y | 25 | 35 | 10 | H | 2003-10-14 | |||
| This is a two bedroom, two car garage halfplex with a high slanted roof. The job would include repair or replacement of the rain gutters and painting the garage door. | ||||||||||||||||
| 1639 | BROOKLYN | NY | I | R | B | 5 | 2 | Y | 8 | 10 | 10 | M | 2003-10-14 | |||
| I own a brownstone and in need of a painter | ||||||||||||||||
| 1638 | LEESBURG | VA | I | R | B | 6 | 6 | Y | 44 | 53 | 9 | H | 2003-10-14 | |||
| 1634 | TAYLORSVILLE | KY | I | R | W | 0 | 0 | Y | 16 | 6 | 8 | M | 2003-10-14 | |||
| 1633 | TAYLORSVILLE | KY | I | R | W | 0 | 0 | N | 93 | 94 | 3 | M | 2003-10-14 | |||
| 1632 | BROOKLYN | NY | E | R | B | 5 | 0 | Y | 4 | 12 | 14 | M | 2003-10-14 | |||
| I own a brownstone and it is need paint | ||||||||||||||||
| 1631 | OLYMPIA | WA | E | C | B | 2 | 14 | Y | 27 | 28 | 16 | M | 2003-10-14 | |||
| repaint over stain exterior and triming, interior restain have 17 beams in trim color also 2 bathrooms going from stain to latex would like this done a.s.a.p... | ||||||||||||||||
| 1630 | CHANHASSEN | MN | I | R | W | 0 | 0 | N | 30 | 20 | 20 | M | 2003-10-14 | |||
| our main level and basement is white want to change color- high ceiling area on main floor | ||||||||||||||||
| 1629 | TAYLORSVILLE | KY | I | R | W | 0 | 0 | N | 30 | 30 | 3 | M | 2003-10-14 | |||
| 1628 | TAYLORSVILLE | KY | I | R | W | 0 | 0 | N | 32 | 31 | 8 | H | 2003-10-14 | |||
| 1627 | TAYLORSVILLE | KY | I | R | W | 1 | 0 | N | 7 | 6 | 8 | M | 2003-10-14 | |||
| 1626 | SAN JUAN CAPISTRANO | CA | E | R | B | 0 | 0 | Y | 60 | 30 | 20 | H | 2003-10-14 | |||
| 1625 | PHOENIX | AZ | I | R | W | 11 | 10 | Y | 0 | 0 | 0 | H | 2003-10-14 | |||
| 1670 sq. ft. home with 2 car garage, ceiling, unfurnished | ||||||||||||||||
| 1624 | CHICAGO | IL | I | R | B | 1 | 2 | Y | 10 | 15 | 9 | H | 2003-10-14 | |||
| 1 room,windows are standard size,ceiling needs painting to. thank you | ||||||||||||||||
| 1623 | FORT LAUDERDALE | FL | I | R | B | 8 | 6 | N | 0 | 0 | 0 | H | 2003-10-13 | |||
| 1600 living space...kitchen,dinning room, living room, 3 bedrooms, 3 bathroom, hallway | ||||||||||||||||
| 1622 | CORONA | CA | I | R | B | 6 | 0 | N | 0 | 0 | 0 | L | 2003-10-13 | |||
| We are in the process of closing on a new house in the Corona area, I am looking for someone to come in and do a basic paint over in the entire house. house is approx 1650sqr/ft. | ||||||||||||||||
| 1621 | GAITHERSBURG | MD | I | R | B | 7 | 15 | N | 0 | 0 | 0 | H | 2003-10-13 | |||
| Hi, I am interested in getting a quote for painting my single family house. Areas to be painted : Living room , Family room, Dining Room, Foyer, Hallway,Kitchen, 4 Bedrooms, sitting room in the master bedroom and Master Bathroom. Total sq.feet roughly w | ||||||||||||||||
| 1620 | CARLSBAD | CA | I | R | B | 4 | 5 | Y | 21 | 26 | 8 | M | 2003-10-13 | |||
| 2 bdrms 10x10, 12x12 liv rm, 2 baths 5x8, 1 hall 3x5, 1 entry 3x5, 1 kitchen 5x9 | ||||||||||||||||
| 1619 | NOVATO | CA | E | R | B | 3 | 12 | N | 100 | 50 | 12 | M | 2003-10-13 | |||
| Single Story, ranch style house in Pleasant Valley area of Novato. The dimensions are really unknown. We are on Gustafson Ct. and most of the houses in this area are so similar that the true information should be easily aquired...Sorry | ||||||||||||||||
| 1618 | PASADENA | TX | I | R | W | 0 | 0 | N | 1 | 1 | 1 | M | 2003-10-13 | |||
| Need quote for 1 bathroom and kitchen. | ||||||||||||||||
| 1617 | IRVING | TX | I | R | W | 0 | 0 | N | 16 | 18 | 9 | M | 2003-10-13 | |||
| This job consists of painting a guest bedroom in a new house. The doors and windows do not need to be painted. I've got 9' ceilings. I've also got a bathroom attached that I will want to paint (smaller follow-on project. | ||||||||||||||||
| 1616 | IRVING | TX | I | R | W | 0 | 0 | N | 16 | 18 | 9 | M | 2003-10-13 | |||
| This job consists of painting a guest bedroom in a new house. The doors and windows do not need to be painted. I've got 9' ceilings. I've also got a bathroom attached that I will want to paint (smaller follow-on project. | ||||||||||||||||
| 1615 | MONEE | IL | I | R | B | 3 | 1 | N | 12 | 16 | 8 | H | 2003-10-13 | |||
| master bedroom. we supply the paint. paint walls and ceiling with primer and 2 coats, keep carpet clean, wood trimming clean, door trimmings clean, tape those trimmings. | ||||||||||||||||
| 1614 | WESTCHESTER | IL | I | R | B | 1 | 2 | Y | 12 | 12 | 8 | H | 2003-10-13 | |||
| Wanting to faux paint our kitchen | ||||||||||||||||
| 1613 | DEARBORN | MI | I | R | T | 0 | 2 | Y | 2 | 2 | 2 | H | 2003-10-13 | |||
| I HAVE ONE BEDROOM THAT NEEDS THE WALLS ONLY AND THEN 2 SMALLER BEDROOMS HTAT NEED CROW AND TRIM NO DOORS AND 1 BATHROOM THAT NEEDS CROWN AND TRIM AND THE OTHER BATHROOM THAT NEEDS ONLY CROWN A SMALL HAAL WAY THAT NEEDS CROWN AND TRIM | ||||||||||||||||
| 1612 | DEARBORN | MI | I | R | T | 0 | 2 | Y | 2 | 2 | 2 | H | 2003-10-13 | |||
| I HAVE ONE BEDROOM THAT NEEDS THE WALLS ONLY AND THEN 2 SMALLER BEDROOMS HTAT NEED CROW AND TRIM NO DOORS AND 1 BATHROOM THAT NEEDS CROWN AND TRIM AND THE OTHER BATHROOM THAT NEEDS ONLY CROWN A SMALL HAAL WAY THAT NEEDS CROWN AND TRIM | ||||||||||||||||
| 1611 | SNELLVILLE | GA | I | R | W | 0 | 0 | N | 14 | 38 | 18 | H | 2003-10-13 | |||
| Contemporary home with open floor plan. Living and dining room areas flow together with vaulted ceilings. | ||||||||||||||||
| 1610 | DALLAS | GA | E | R | B | 3 | 10 | Y | 35 | 60 | 25 | M | 2003-10-13 | |||
| 2-story house not sure as to square footage. 3/2 basic 2 story square house. I am guessing at 40x60. Needs pressure washing and caulking. Has original paint builders paint from 1997. I will visit references homes. Start date is soon depending on your | ||||||||||||||||
| 1609 | AGUA DULCE | CA | I | R | W | 0 | 0 | N | 160 | 120 | 8 | M | 2003-10-12 | |||
| The entire interior of a new 2600 square foot house. No ceilings, baseboards, doors or windows. Paint will be provided and no furniture will be in the house. There are 4 bedrooms, three bathrooms, a kitchen, living room, family room and dining room. | ||||||||||||||||
| 1608 | AGUA DULCE | CA | I | R | W | 0 | 0 | N | 160 | 120 | 8 | M | 2003-10-12 | |||
| The entire interior of a new 2600 square foot house. No ceilings, baseboards, doors or windows. Paint will be provided and no furniture will be in the house. There are 4 bedrooms, three bathrooms, a kitchen, living room, family room and dining room. | ||||||||||||||||
| 1607 | BOCA RATON | FL | I | R | B | 5 | 0 | Y | 0 | 0 | 0 | H | 2003-10-12 | |||
| I have a decent size job here. My condo is 1000 sq. ft. The majority of the rooms have already been painted by myself. All that remains is a small kitchen, 1 small bathroom, 1 small bath ceiling, some trim, some touch up, and a few doors 5 I believe. I am | ||||||||||||||||
| 1606 | LEWIS CENTER | OH | I | R | W | 0 | 0 | N | 18 | 36 | 8 | H | 2003-10-12 | |||
| I have a family room, dining room and kitchen that needs painted. the total room space is roughly 700 ft. sq. However, the space has cabinets, doors, windows, etc. that won't be painted. I'm not fully sure how much wall space actually needs painted. | ||||||||||||||||
| 1605 | LITHONIA | GA | I | R | W | 0 | 0 | Y | 0 | 0 | 0 | M | 2003-10-12 | |||
| NEED AN ESTIMATE ON INTERIOR OF HOME APPX.4000SF. TWO STORY FAMILY ROOM. NO TRIM OR DOORS JUST THE WALLS | ||||||||||||||||
| 1604 | SANTA ROSA | CA | I | R | B | 0 | 0 | Y | 0 | 0 | 0 | M | 2003-10-11 | |||
| 1603 | EDGEWOOD | WA | E | R | B | 2 | 0 | Y | 25 | 46 | 8 | M | 2003-10-11 | |||
| 1100 sq ft rambler, T-111 siding, southern exposure needs prep and priming. Easy access around entire house.Metal gutters to be included in trim painting. | ||||||||||||||||
| 1602 | COLUMBIA | MD | I | R | B | 12 | 12 | Y | 50 | 50 | 50 | M | 2003-10-11 | |||
| Paint the entire house on the inside with good quality paint. Remove and re hang wall hangings. | ||||||||||||||||
| 1601 | ANDALUSIA | PA | E | R | B | 2 | 6 | Y | 12 | 12 | 12 | M | 2003-10-11 | |||
| townhouse - paint over existing aluminum siding.i don't know what to put in for width,length or height | ||||||||||||||||
| 1600 | EDGEWOOD | WA | E | R | B | 1 | 0 | Y | 24 | 54 | 8 | M | 2003-10-10 | |||
| T-111 siding. small rambler w/2 gable ends, single car garage door to be painted. | ||||||||||||||||
| 1599 | VAIDEN | MS | I | R | B | 7 | 0 | Y | 100 | 137 | 40 | H | 2003-10-10 | |||
| sheetrock walls mud, sanding ,fixing all nicks etc. | ||||||||||||||||
| 1598 | VAIDEN | MS | I | R | B | 7 | 0 | Y | 100 | 137 | 40 | H | 2003-10-10 | |||
| sheetrock walls mud, sanding ,fixing all nicks etc. | ||||||||||||||||
| 1597 | AULT FIELD | WA | E | R | B | 2 | 9 | Y | 40 | 30 | 20 | M | 2003-10-09 | |||
| Two-storey, chimney, 1600 total square feet, dimensions given are mere guesses only. | ||||||||||||||||
|
|