![]() |
![]() |
|
|
5931 Available Projects
From November 3, 2002 to Today
Contractors: please click on Login button above to login and submit bids on these projects.
Column heading buttons: click on the one you wish to sort by (e.g. click on RC to see all commercial jobs first and residential jobs second, or click on State button to sort by State, etc.).
Column Definitions: ID=Reference Number, IE=Interior/Exterior, RC=Residential/Commercial, P=Paint Walls/Trim/Both, D=# of Doors, Win=# of Windows, OB=Overhang/Baseboard paint Yes/No, W=Width in feet, L=Length in feet, H=Height in feet, Q=Quality Low/Medium/High.
Results Page(s) (100 per page): 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60
| ID | City | State | IE | RC | P | D | Win | OB | W | L | H | Q | Posted | |||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | ||||||||||||||||
| 1388 | PHILA | PA | E | R | B | 0 | 2 | N | 60 | 30 | 8 | M | 2003-09-23 | |||
| Not positive of size dimensions average size rowhouse in Philadelphia painting to include attached shutters approximately 9 wide on the two lower windows only | ||||||||||||||||
| 1387 | NUTLEY | NJ | I | R | W | 0 | 0 | N | 0 | 0 | 0 | M | 2003-09-23 | |||
| Need only ceilings painted in 5 rooms. Room sizes 21x13, 21x17, 21x13, 13x13, 13x13. I will supply paint | ||||||||||||||||
| 1386 | LAKE WORTH | FL | I | R | B | 2 | 2 | Y | 28 | 32 | 8 | H | 2003-09-23 | |||
| 1385 | FORT LEE | NJ | I | R | W | 0 | 0 | Y | 5 | 3 | 8 | H | 2003-09-23 | |||
| water from upstairs leak down stairs from cockball joint on bathroom toilet, same siye,stzle bathroom down stair apt. ceiling got wet and has dried,so needs prime,and paint . | ||||||||||||||||
| 1384 | SONORA | OH | I | R | W | 0 | 0 | Y | 0 | 0 | 0 | H | 2003-09-22 | |||
| new construction, already primed, 1775 sq. feet, ranch style | ||||||||||||||||
| 1383 | SONORA | OH | I | R | W | 0 | 0 | Y | 0 | 0 | 0 | H | 2003-09-22 | |||
| new construction, already primed, 1775 sq. feet, ranch style | ||||||||||||||||
| 1382 | ADDICKS BARKER | TX | I | R | W | 0 | 0 | N | 20 | 14 | 8 | M | 2003-09-22 | |||
| 1381 | STREAMWOOD | IL | I | R | W | 0 | 0 | N | 40 | 42 | 8 | M | 2003-09-22 | |||
| There are a total of 4 rooms that need to be painted. Three of them need prep because there is currently a yellow color. The dimensions are 13X12,13x12,11x11,and a very small powder room. | ||||||||||||||||
| 1380 | ATLANTA NAVAL AIR STATION | GA | E | R | B | 1 | 13 | Y | 60 | 30 | 10 | M | 2003-09-22 | |||
| 1379 | LAS VEGAS | NV | I | R | B | 10 | 25 | Y | 70 | 30 | 10 | M | 2003-09-22 | |||
| We are looking to have the interior of our 2100sq ft. home painted. | ||||||||||||||||
| 1378 | SAN JOSE | CA | E | R | B | 3 | 19 | Y | 57 | 59 | 17 | M | 2003-09-22 | |||
| 1377 | LONG BEACH | CA | I | R | B | 5 | 0 | Y | 40 | 27 | 8 | M | 2003-09-22 | |||
| walls doors and trim only. no ceilings. and one wall of each room is all glass ROOM ONE 24X15 3 WALLS ROOM TWO 12X12 3 WALLS ROOM THREE 15X15 3 WALLS | ||||||||||||||||
| 1376 | MANTECA | CA | E | R | B | 4 | 9 | Y | 31 | 72 | 10 | M | 2003-09-22 | |||
| Stucco Duplex Repaint Some patching. Eves need caulking. Window sils need some patch & sand. Spot prime where needed. Paint walls with ONE COAT ELASTOMERIC. TRIM DOORS WITH ONE COAT 100 percent ACRYLLIC. | ||||||||||||||||
| 1375 | SAN FRANCISCO | CA | E | R | B | 3 | 5 | Y | 25 | 60 | 8 | H | 2003-09-22 | |||
| I have One second story room so for that portion the height is 16'(Approx 25 X 15) | ||||||||||||||||
| 1374 | BALTIMORE | MD | I | R | B | 7 | 11 | N | 0 | 0 | 0 | M | 2003-09-22 | |||
| large apartment ... spray all flat white (paint supplied by owner) ... cover rugs/floors and new windows ... 14' ceilings ... approx. 1500 sf | ||||||||||||||||
| 1373 | TACOMA | WA | E | R | B | 0 | 0 | Y | 30 | 60 | 50 | M | 2003-09-22 | |||
| House on a hill, so some is 1 level, going down hill to expose 2 levels. | ||||||||||||||||
| 1372 | TACOMA | WA | E | R | B | 1 | 7 | Y | 30 | 60 | 50 | M | 2003-09-22 | |||
| House on a hill, so some is 1 level, going down hill to expose 2 levels. | ||||||||||||||||
| 1371 | KLEIN | TX | I | R | W | 0 | 0 | N | 999 | 999 | 99 | M | 2003-09-22 | |||
| i master bedroom, 1 master bath, toilette room and wlak-in closet, 2 small bedrooms plus 2 closets, 1 full bathroom and 1 gameroom. Walls only, paint already purchased (egg shell finish) | ||||||||||||||||
| 1370 | KLEIN | TX | I | R | W | 0 | 0 | N | 999 | 999 | 99 | M | 2003-09-22 | |||
| i master bedroom, 1 master bath, toilette room and wlak-in closet, 2 small bedrooms plus 2 closets, 1 full bathroom and 1 gameroom. Walls only, paint already purchased (egg shell finish) | ||||||||||||||||
| 1369 | FREDERICK | MD | I | R | B | 0 | 0 | Y | 0 | 0 | 0 | H | 2003-09-22 | |||
| I need to have a kitchen, bathroom, family room, and bedroom painted and need this work done in the next 4 weeks. I have an estimate for 1200.00 including paint, looking for a better deal. Thanks | ||||||||||||||||
| 1368 | ATLANTA NAVAL AIR STATION | GA | E | R | B | 3 | 10 | Y | 70 | 30 | 12 | M | 2003-09-22 | |||
| wood siding home built in 1986. around chimmney wood looks bad and might need replacing. | ||||||||||||||||
| 1367 | CLOSTER | NJ | E | R | B | 3 | 26 | Y | 25 | 40 | 25 | H | 2003-09-22 | |||
| 1910 Victorian/Colonial with one addition and finished attic (2 dormers and 1 gable. Screened-in porch (wrap-around) | ||||||||||||||||
| 1366 | MC KINNEY | TX | I | R | W | 0 | 0 | N | 0 | 0 | 0 | H | 2003-09-22 | |||
| We are be interested in a 3 or 4 phase project We have a large 2 story living room that is contected to a 2 story entry and a half bath that we would like painted first We are also looking into crown modeling in our kitchen bedroom and possibly office a | ||||||||||||||||
| 1363 | SAINT ANN | MO | E | R | B | 2 | 10 | N | 25 | 35 | 10 | H | 2003-09-21 | |||
| colors are grey and shutters are black. siding is asbestos. We want to go to a lighter green for the house and darker green for the shutters. We also have a 4' by 4' concrete porch with steps that we want painted as well as a metal rod banister that | ||||||||||||||||
| 1362 | MANTECA | CA | E | R | B | 4 | 9 | N | 31 | 72 | 11 | M | 2003-09-21 | |||
| REPAINT EXTERIOR OF STUCCO DUPLEX- Pr wash exterior CAULK gaps under eves SPACKLE SAND SPOT PRIME as needed.Some window sil patching and priming. ONE COAT K Moore ELASTOMERIC FINISH TRIM W/ 100 percent ACRYLIC. | ||||||||||||||||
| 1361 | LEXINGTON | SC | I | R | B | 2 | 5 | N | 20 | 20 | 8 | H | 2003-09-21 | |||
| Cove moulding and I will provide paint. | ||||||||||||||||
| 1360 | SHERMAN OAKS | CA | E | R | B | 5 | 8 | Y | 1 | 1 | 1 | M | 2003-09-21 | |||
| I need to have open area living room, dining area and kitchen painted as well as 2 bedrooms and two bathrooms | ||||||||||||||||
| 1359 | ALOHA | OR | E | R | B | 0 | 0 | Y | 7 | 7 | 7 | H | 2003-09-21 | |||
| top of chimney (wood) top 4 feet. 3 dormer windows (LP siding)(6ft by 6ft front- window takes up most of front),4ft by 12ft and 2ft by 15ft roof sections (LP siding). Only chimney and corners of dormers should need caulking in cracks,3 horizontal boards o | ||||||||||||||||
| 1358 | BIG CHIMNEY | WV | E | R | T | 0 | 0 | Y | 3 | 300 | 0 | M | 2003-09-19 | |||
| In June we replaced the rotten wood underneath the eaves of our house on Edgewood. Our painter is now unable to do the job. I don't think it would take more than a day or two. The longest part would be setting up or moving scaffolding or ladders. I hat | ||||||||||||||||
| 1357 | DEL VALLE | TX | E | R | B | 2 | 6 | Y | 23 | 48 | 16 | M | 2003-09-19 | |||
| 1356 | BRENT | FL | E | R | B | 0 | 10 | Y | 34 | 81 | 10 | H | 2003-09-19 | |||
| Basic wood frame construction. Clapboard, single story. 2 car garage included in width/length. Some cauking, but no wood damage observed. Will be single color application, white. | ||||||||||||||||
| 1355 | LISLE | IL | I | R | B | 0 | 2 | Y | 22 | 18 | 0 | M | 2003-09-19 | |||
| 1354 | BANCROFT | MI | I | R | B | 99 | 99 | Y | 0 | 0 | 0 | M | 2003-09-19 | |||
| 1353 | SAN JOSE | CA | E | R | B | 4 | 20 | Y | 50 | 50 | 22 | M | 2003-09-19 | |||
| 1352 | SAN JOSE | CA | E | R | B | 4 | 20 | Y | 50 | 50 | 22 | M | 2003-09-19 | |||
| 1351 | SAN JOSE | CA | E | R | B | 4 | 20 | Y | 50 | 50 | 22 | M | 2003-09-19 | |||
| 1350 | SAN JOSE | CA | E | R | B | 4 | 20 | Y | 50 | 50 | 22 | M | 2003-09-19 | |||
| 1349 | BEAUMONT | CA | E | R | B | 2 | 14 | Y | 60 | 30 | 10 | H | 2003-09-19 | |||
| 1690 sq ft with patio. | ||||||||||||||||
| 1348 | BEAUMONT | CA | E | R | B | 2 | 14 | Y | 60 | 30 | 10 | H | 2003-09-19 | |||
| 1690 sq ft with patio. | ||||||||||||||||
| 1347 | LIVE OAK | TX | I | R | B | 5 | 6 | Y | 60 | 30 | 8 | M | 2003-09-19 | |||
| paint walls, stain doors,window sills, baseboards if needed,tung oil cabinets | ||||||||||||||||
| 1346 | MORGAN | PA | I | R | W | 0 | 0 | N | 151 | 103 | 8 | M | 2003-09-18 | |||
| family room & living room may require 2 coats: living room - 17' x 13' - cathedral ceiling dining room - 12' x 11' - no cathedral kitchen - 18' x 12' - no cathedral family room - 19' x 13' - cathedral master bedroom - 18' x 12' - cathedral bedroom | ||||||||||||||||
| 1345 | MILFORD | CT | I | R | B | 2 | 1 | Y | 5 | 70 | 6 | H | 2003-09-18 | |||
| i am redoing my bathroom and had to go into another room need the bathroom painted and the other room also i had the ceilings redone so the ceiling in bedroom and bathroom needs to be done. about 3 rooms and 3 ceilings..already know the color scheme. | ||||||||||||||||
| 1344 | SAN FRANCISCO | CA | E | R | B | 2 | 6 | Y | 50 | 25 | 18 | M | 2003-09-18 | |||
| 1343 | FORKS | PA | I | R | W | 0 | 0 | N | 100 | 115 | 8 | H | 2003-09-18 | |||
| Having a house built in Penns Ridge Development in Forks Twshp. Would like the interior painted. 7 rooms 2 hallways and 3 bathrooms Dates are estimated - won't find out closing date until end of Oct 2003 | ||||||||||||||||
| 1342 | CHANDLER | AZ | I | R | B | 0 | 3 | Y | 30 | 24 | 12 | M | 2003-09-18 | |||
| I have the paint. | ||||||||||||||||
| 1341 | MENOMONEE FALLS | WI | I | R | B | 1 | 0 | Y | 25 | 20 | 10 | M | 2003-09-18 | |||
| We need the family room 25x20 living room 15x18 formal dining 15x18 and the foyer painted | ||||||||||||||||
| 1340 | TORRANCE | CA | E | R | B | 4 | 10 | Y | 20 | 37 | 20 | M | 2003-09-18 | |||
| Six units in our townhome development, all detached patio homes, but close together. Built 1999. Simple box shape, nothing fancy or complex. Some vegetation next to home. Would like a quote for all six homes painted at same time. Also request quote fo | ||||||||||||||||
| 1339 | SPOKANE | WA | E | R | B | 3 | 14 | Y | 34 | 32 | 30 | H | 2003-09-18 | |||
| Single family residence, older home, is being rented at the moment. I would like it to be painted before winter sets in. Doesn't thorough prep include one coat of primer. Then I would just want one coat of best paint. | ||||||||||||||||
| 1338 | MONROE | NC | E | R | B | 5 | 17 | Y | 30 | 60 | 8 | H | 2003-09-17 | |||
| SPLIT LEVEL RANCH, DECK ON TOP FLOOR WITH RAILING AND POSTS THAT WILL NEED TO BE PAINTED | ||||||||||||||||
| 1337 | ANTLERS PARK | MN | E | R | B | 4 | 12 | Y | 24 | 48 | 30 | M | 2003-09-17 | |||
| The house is a walkout in back partial walkout on one side. Split entry home. | ||||||||||||||||
| 1336 | ANTLERS PARK | MN | E | R | B | 4 | 12 | Y | 24 | 48 | 30 | M | 2003-09-17 | |||
| The house is a walkout in back partial walkout on one side. Split entry home. | ||||||||||||||||
| 1335 | SAN FRANCISCO | CA | E | R | B | 2 | 6 | Y | 50 | 25 | 18 | M | 2003-09-17 | |||
| Small house on Lawton St in Golden Gate Heights. Would like to use at least two colors. | ||||||||||||||||
| 1334 | DES MOINES | WA | I | R | B | 13 | 12 | Y | 40 | 40 | 21 | M | 2003-09-17 | |||
| 1333 | DES MOINES | WA | E | R | B | 13 | 12 | Y | 40 | 40 | 21 | M | 2003-09-17 | |||
| 1332 | ROSWELL | GA | I | R | W | 0 | 0 | N | 30 | 30 | 9 | M | 2003-09-17 | |||
| 3 bedrooms, 2 story foyer, hallway, bedrooms are roughly 12 x 12, foyer is roughly 16 x 10, hallway is 2 walls with an open balcony, roughly 15 x 10 | ||||||||||||||||
| 1331 | SULPHUR SPRINGS | FL | E | R | B | 1 | 18 | Y | 30 | 40 | 30 | H | 2003-09-16 | |||
| Approx. 1681 sq. ft house, built in 1926. former 1 story converted attic to make 2 story. Porch and veranda beams to paint also. Beadboard overhang is approx 8". 3 colors trim and brick base (cream), walls (taupe), doors and patio (red). Currently painted | ||||||||||||||||
| 1330 | WASHINGTON | DC | I | C | B | 20 | 0 | N | 28 | 60 | 11 | H | 2003-09-16 | |||
| Re-paint entire floor of office, approx. 2500' square, with exception of 2 walls. light Duron color for walls, darker complimentary color for doors and frames. | ||||||||||||||||
| 1329 | JAMAICA | NY | I | R | W | 0 | 0 | N | 0 | 0 | 0 | H | 2003-09-16 | |||
| 1328 | LAWRENCEVILLE | GA | I | R | W | 0 | 0 | N | 0 | 0 | 0 | H | 2003-09-16 | |||
| I would like to have downstair family room (16X16), Kitchen, Breakfast nook, Master Bedroom (14X18 w/12ft ceiling), Master Bath, and upstairs great room painted. Had quote of 550 from painter who did not show up this AM. Paint is arleady purchased. Pl | ||||||||||||||||
| 1327 | AKRON | OH | I | R | B | 0 | 0 | Y | 14 | 18 | 10 | M | 2003-09-16 | |||
| 1326 | AKRON | OH | I | R | B | 2 | 0 | Y | 14 | 18 | 10 | H | 2003-09-16 | |||
| 1325 | FARM HILL | MA | I | R | B | 11 | 12 | Y | 24 | 44 | 8 | H | 2003-09-16 | |||
| paint 1 coat all ceilings,11 new 6 panel doors needs one coat white over prime. paint hallway 4 bedrooms 2 baths all same color,new windows no paint needed | ||||||||||||||||
| 1324 | SARASOTA | FL | E | C | B | 3 | 7 | Y | 28 | 40 | 20 | H | 2003-09-16 | |||
| 1323 | ALAMO | CA | I | C | W | 0 | 0 | N | 28 | 0 | 24 | M | 2003-09-15 | |||
| three display walls total 2 @ 8'x8' 1 @ 12'x8' | ||||||||||||||||
| 1322 | CEDARHURST | NY | I | R | W | 0 | 0 | Y | 12 | 18 | 8 | M | 2003-09-15 | |||
| 1321 | CEDARHURST | NY | I | R | W | 1 | 2 | Y | 12 | 18 | 8 | M | 2003-09-15 | |||
| 1320 | CEDARHURST | NY | I | R | W | 1 | 2 | Y | 12 | 18 | 8 | M | 2003-09-15 | |||
| 1319 | EAST UNION | WA | I | R | W | 1 | 0 | N | 12 | 12 | 8 | M | 2003-09-15 | |||
| Painting one room in a newly purchased condominium--includes painting the 4 walls, the closet door, and the ceiling. Room is a small bedroom. | ||||||||||||||||
| 1318 | LATHRUP VILLAGE | MI | E | R | B | 2 | 11 | N | 45 | 22 | 10 | H | 2003-09-15 | |||
| Have Aluminium siding on ext. of house, interested in cost / feasibility of painting the siding & trim. this is a 1 story salt box style home built in the 50's with newer windows, window frames may not need painted. | ||||||||||||||||
| 1317 | FORT PIERCE | FL | E | R | B | 2 | 5 | Y | 100 | 25 | 15 | M | 2003-09-15 | |||
| 1800 sqft house | ||||||||||||||||
| 1316 | COVINA | CA | I | R | B | 4 | 9 | Y | 102 | 60 | 8 | M | 2003-09-15 | |||
| This is a small 2 bedroom, 1 bath house of 953 square feet. Some crown molding work also needs to be done along with the painting. | ||||||||||||||||
| 1315 | ASHBURN | VA | I | R | W | 24 | 22 | N | 0 | 0 | 0 | M | 2003-09-15 | |||
| Looking to paint the entire house, 2,889 square feet (42' x 24'), one solid and neutral color. Doors, trim (floorboards, crown molding, and door and window trimmings) and ceiling EXCLUDED. | ||||||||||||||||
| 1314 | HIGHLANDS RANCH | CO | I | R | B | 12 | 10 | Y | 60 | 30 | 10 | L | 2003-09-15 | |||
| House is 1250 SF with High Cielings in LR and Master BR. High areas may be skipped if you can match the new paint to existing. Just want the whole inside of the house painted white. 2 BR 2 bath. Basically a touch up job. It's not in too bad a shape. | ||||||||||||||||
| 1313 | BOSTON | MA | I | R | B | 5 | 0 | Y | 20 | 50 | 15 | M | 2003-09-15 | |||
| Condo in south boston have paint, need best price for three floor,3 bed, 2 bath interior job. all white, with off white trim. | ||||||||||||||||
| 1312 | ROSWELL | GA | I | R | B | 3 | 0 | N | 10 | 10 | 10 | M | 2003-09-15 | |||
| Would like interior of upstairs hallway/ceiling/stairway/and downstairs hallway painted. Walls and trim. | ||||||||||||||||
| 1311 | CHICAGO | IL | E | R | W | 0 | 0 | N | 0 | 0 | 0 | M | 2003-09-15 | |||
| I have a new condo in the South Loop of Chicago (S. Indiana). I need 2 bedrooms appox. 10 by 12 and 11 by 13, 2 smallish bathrooms, a hallway and combined living and dining room painted. Celings are 11 foot high. I need it finished by the 2nd week in Oc | ||||||||||||||||
| 1310 | AMES | IA | I | R | B | 2 | 2 | Y | 12 | 17 | 15 | M | 2003-09-15 | |||
| living room with cathedaral ceiling | ||||||||||||||||
| 1309 | BALTIMORE | MD | I | R | W | 0 | 0 | N | 24 | 48 | 10 | M | 2003-09-15 | |||
| living room and dining room | ||||||||||||||||
| 1308 | BROOKLYN | NY | I | R | B | 3 | 4 | Y | 1 | 1 | 8 | H | 2003-09-15 | |||
| Entire coop needs to be painted. 625 square feet, 8 ft. ceilings. I bought paint and primer. The paint on the walls now is too thick and should be scraped or thinned prior to painting. | ||||||||||||||||
| 1307 | WAUGHTOWN | NC | I | R | B | 7 | 5 | Y | 99 | 67 | 8 | H | 2003-09-15 | |||
| I would like to have my interior painted. 3 beds, 2 baths, kitchen and living room, plus doors and trim. I am not sure on how much square feet that would all come out to. But I did my best with the measuring, probably overmeasured but..... | ||||||||||||||||
| 1306 | MC KINNEY | TX | I | R | B | 99 | 99 | Y | 999 | 999 | 99 | M | 2003-09-14 | |||
| I have a dependable painting crew. My painters have have over ten years experience. Put US to the test, WE'LL DO the REST. | ||||||||||||||||
| 1305 | REDLANDS | CA | E | R | B | 1 | 8 | Y | 30 | 36 | 12 | H | 2003-09-14 | |||
| house is 1100 square feet - 2 bedroom, one story house | ||||||||||||||||
| 1304 | CALUMET PARK | IL | E | R | T | 2 | 0 | Y | 25 | 60 | 30 | H | 2003-09-13 | |||
| A 2 story, 60 year old home with detailed carpentry trim (fluted molding). Windows will be replaced with vinyl windows throughout, after paint job is complete. Current paint is chipping and cracked. Some rotted wood. | ||||||||||||||||
| 1301 | BEECHHURST | NY | I | C | B | 1 | 1 | Y | 18 | 20 | 8 | M | 2003-09-13 | |||
| small office lobby | ||||||||||||||||
| 1300 | EASTON | MA | E | R | B | 2 | 0 | Y | 26 | 72 | 18 | H | 2003-09-13 | |||
| 26X34x 1.75 CAPE W/ 16' Wide attached family rm, 22x24 x 1.75 garage, 10x16 sea. por. off back and 2 small sheds. Latex paint going over oil. Paint -Ben Moore Guard. Good condition. | ||||||||||||||||
| 1299 | ELMHURST | IL | E | R | T | 3 | 20 | Y | 2 | 350 | 28 | H | 2003-09-13 | |||
| Colonial cedar siding stain OK. This exterior garage and home needs to have significant paint removed on trim around doors, windows, and overhangs. Most trim paint is "alligatoring" or peeling. Needs to be stripped to bare wood, with base primer coat b | ||||||||||||||||
| 1298 | ELMHURST | IL | E | R | T | 3 | 20 | Y | 2 | 350 | 28 | H | 2003-09-13 | |||
| Colonial cedar siding stain OK. This exterior garage and home needs to have significant paint removed on trim around doors, windows, and overhangs. Most trim paint is "alligatoring" or peeling. Needs to be stripped to bare wood, with base primer coat b | ||||||||||||||||
| 1297 | ELMHURST | IL | E | R | T | 3 | 20 | Y | 2 | 350 | 28 | H | 2003-09-13 | |||
| Colonial cedar siding stain OK. This exterior garage and home needs to have significant paint removed on trim around doors, windows, and overhangs. Most trim paint is "alligatoring" or peeling. Needs to be stripped to bare wood, with base primer coat b | ||||||||||||||||
| 1296 | ELMHURST | IL | E | R | T | 3 | 20 | Y | 2 | 350 | 28 | H | 2003-09-13 | |||
| Colonial cedar siding stain OK. This exterior garage and home needs to have significant paint removed on trim around doors, windows, and overhangs. Most trim paint is "alligatoring" or peeling. Needs to be stripped to bare wood, with base primer coat b | ||||||||||||||||
| 1295 | JACKSONVILLE | FL | I | R | W | 0 | 0 | Y | 15 | 14 | 10 | M | 2003-09-13 | |||
| I have a room and planning of painting the ceiling How much do you charge to spray paint just the popcorn ceiling | ||||||||||||||||
| 1294 | CROSSROADS | FL | I | R | W | 0 | 0 | N | 0 | 0 | 0 | M | 2003-09-13 | |||
| I need all of the interior walls of a 1,000 square foot home to be repainted white. Three bedrooms, hallway, bathroom, living room and kitchen. | ||||||||||||||||
| 1293 | MAYNARD | MA | I | R | B | 6 | 7 | Y | 45 | 50 | 8 | M | 2003-09-12 | |||
| Upstairs floor of duplex, rental unit. If can't complete by 10/1 then will target 10/15. | ||||||||||||||||
| 1292 | BUENA PARK | CA | I | R | B | 8 | 7 | Y | 45 | 24 | 8 | H | 2003-09-12 | |||
| 1291 | MANASSAS | VA | I | R | B | 15 | 4 | Y | 15 | 10 | 8 | H | 2003-09-12 | |||
| This is a kitchen, so the 15 doors are cabinet doors. I want all of the cabinets painted. Also, 3 of the windows is a bay window. This is a townhouse that we're moving into in Dec., so the work will need done then. | ||||||||||||||||
| 1290 | HUNTINGTON BEACH | CA | I | R | B | 1 | 7 | Y | 45 | 30 | 8 | M | 2003-09-12 | |||
| paint the interior walls of 4 bedrooms (about 10x10), a kitchen, living room and one bathroom and a hallway of a 1363 square foot house with deep paint colors. | ||||||||||||||||
| 1289 | AMES | IA | I | R | B | 2 | 2 | Y | 12 | 17 | 15 | M | 2003-09-12 | |||
| Living room with "cathedral" ceiling, fireplace (doesn't need any paint) and staircase wall. | ||||||||||||||||
| 1288 | MEMPHIS | TN | E | R | T | 3 | 16 | N | 0 | 0 | 0 | H | 2003-09-12 | |||
| Just want windows and doors, including frames painted. Scrap and clean up before painting. | ||||||||||||||||
| 1287 | GREER | SC | I | R | B | 0 | 1 | N | 14 | 16 | 8 | M | 2003-09-12 | |||
| LIVING ROOM AREA INCLUDES AREA OVER STAIRS | ||||||||||||||||
| 1286 | SANTA MONICA | CA | I | R | B | 6 | 0 | Y | 50 | 30 | 8 | H | 2003-09-12 | |||
| Tomnhouse/Condo, some double height walls, 3 floors, small amount of patching required | ||||||||||||||||
| 1285 | KATY | TX | I | R | W | 0 | 2 | Y | 24 | 23 | 17 | H | 2003-09-12 | |||
| Paint two bedrooms, walls and closets only. | ||||||||||||||||
|
|