![]() |
![]() |
|
|
5931 Available Projects
From November 3, 2002 to Today
Contractors: please click on Login button above to login and submit bids on these projects.
Column heading buttons: click on the one you wish to sort by (e.g. click on RC to see all commercial jobs first and residential jobs second, or click on State button to sort by State, etc.).
Column Definitions: ID=Reference Number, IE=Interior/Exterior, RC=Residential/Commercial, P=Paint Walls/Trim/Both, D=# of Doors, Win=# of Windows, OB=Overhang/Baseboard paint Yes/No, W=Width in feet, L=Length in feet, H=Height in feet, Q=Quality Low/Medium/High.
Results Page(s) (100 per page): 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60
| ID | City | State | IE | RC | P | D | Win | OB | W | L | H | Q | Posted | |||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Description | ||||||||||||||||
| 34 | BARCLAY | IL | I | R | W | 0 | 0 | N | 62 | 44 | 8 | M | 2002-11-11 | |||
| One of the rooms, 16 X 17 has cathedral ceilings. The other rooms are a hallway 22 X 3, a dining room 12 X 13, and a kitchen 12 X 12. | ||||||||||||||||
| 33 | WHITMAN | MA | I | R | B | 4 | 2 | N | 17 | 22 | 7 | M | 2002-11-11 | |||
| Paint interior stairway, small hallway and 12X14 bedroom. Paint doors and trim. Same color or darker than what is currently there. | ||||||||||||||||
| 32 | LOUISVILLE | CO | E | R | B | 2 | 25 | Y | 35 | 45 | 30 | H | 2002-11-10 | |||
| 30 | SEATTLE | WA | I | R | W | 0 | 0 | N | 10 | 32 | 10 | H | 2002-11-08 | |||
| 2 rooms 1)10x12 8 ft ceiling 2)20x 12 10 ft ceiling | ||||||||||||||||
| 29 | RINCON | AZ | I | R | B | 4 | 0 | Y | 0 | 0 | 0 | M | 2002-11-08 | |||
| i'm not sure of the width length and height but it's 1200 sq ft and i want it painted from top to bottom | ||||||||||||||||
| 28 | MIDDLETOWN | VA | I | R | B | 6 | 12 | Y | 50 | 20 | 8 | H | 2002-11-08 | |||
| House is small -- 894 square feet | ||||||||||||||||
| 27 | LEXINGTON | KY | I | R | B | 8 | 7 | Y | 96 | 99 | 10 | M | 2002-11-07 | |||
| 26 | LEXINGTON | KY | I | R | B | 8 | 7 | Y | 60 | 30 | 10 | H | 2002-11-07 | |||
| Two year-old house with original light beige paint and white trim. Needs to be repainted throughout. I plan to use a darker beige and white trim throughout. Several "nail pops" which need to be fixed. I want all nail holes filled prior to painting | ||||||||||||||||
| 25 | ORCHARD PARK | NY | I | R | B | 0 | 2 | Y | 23 | 16 | 16 | H | 2002-11-07 | |||
| Great room, ceiling slopes on both sides, barn style, and has two skylights. Ceiling requires painting as well as walls. One wall has dry bar, another is cut to include another bar shared with the kitchen. Another wall has a fireplace/mantel and two trian | ||||||||||||||||
| 24 | GLENDALE | CA | I | R | B | 5 | 5 | Y | 36 | 22 | 8 | H | 2002-11-06 | |||
| 3 bedrooms, approximately 11 x 13 each Hallway about 13 feet long family room about 15X15 Living room has an 8'(W) wall, 2 - 12' walls and a 20' wall with a big window. | ||||||||||||||||
| 23 | MOUNTAIN VIEW | CA | I | R | B | 3 | 0 | N | 20 | 40 | 15 | H | 2002-11-06 | |||
| Requesting bid for interior house 1000 sq. ft including ceiling | ||||||||||||||||
| 22 | MOUNTAIN VIEW | CA | I | R | B | 3 | 0 | N | 20 | 40 | 15 | H | 2002-11-06 | |||
| Requesting bid for interior house 1000 sq. ft including ceiling | ||||||||||||||||
| 21 | OCEANSIDE | CA | I | R | B | 5 | 10 | N | 38 | 31 | 8 | M | 2002-11-06 | |||
| 2100 SQ Feet 2 Story Home. 4 Bedroom Family Room/kitchen area 26X 13X 8 Living Room/Dining room Area 21X 12X 15 Master Bedroom 14'X 13' X 10' Bonus Room 20.5X12x8 Bedroom 2 downstairs 12x 12X 8 | ||||||||||||||||
| 20 | DEVON | PA | I | R | B | 3 | 3 | Y | 11 | 17 | 7 | H | 2002-11-06 | |||
| please include ceiling as well. also, the room has many cracks in the plaster on walls and ceiling. | ||||||||||||||||
| 19 | HOWELL | MI | I | R | B | 6 | 8 | N | 50 | 40 | 26 | H | 2002-11-06 | |||
| New construction. no flooring in yet. 1700 SQft three bedroom 2.5 bath | ||||||||||||||||
| 18 | SOUTHPORT | CA | I | R | B | 12 | 9 | Y | 99 | 102 | 8 | M | 2002-11-04 | |||
| We just purchased this house, and we want to have the entire interior painted prior to actually moving in. There is paneling in a couple of rooms that we'd like painted over, as well as all the kitchen cabinets. The rest of the house is regular drywall. W | ||||||||||||||||
| 17 | RANCHO SANTA MARGARITA | CA | E | R | B | 2 | 0 | Y | 6 | 180 | 8 | M | 2002-11-04 | |||
| one coat of good paint and not much prep needed | ||||||||||||||||
| 16 | BALLARDSVILLE | MS | I | C | W | 0 | 0 | N | 50 | 100 | 20 | M | 2002-11-03 | |||
| church gym. painting two walls that are metal. one wall is 100' long and the other is 50' wide. both walls are 20' high | ||||||||||||||||
| 14 | PHOENIX | AZ | I | C | B | 10 | 0 | Y | 0 | 742 | 12 | M | 2002-11-02 | |||
| I need a quote for interior walls -no ceiling- in Phoenix, AZ. 85032 approx 8866 square feet. | ||||||||||||||||
| 13 | GREENVILLE | RI | E | R | B | 0 | 0 | Y | 26 | 38 | 8 | H | 2002-11-01 | |||
| I started the project this summer and have been too busy to finish. I only have about a quarter done. I would at least like to finish the prep and get primer on it before it gets too cold. | ||||||||||||||||
| 12 | MBORO | TN | E | R | B | 2 | 1 | Y | 16 | 12 | 8 | H | 2002-10-24 | |||
| master bedroom | ||||||||||||||||
| 11 | MINNEAPOLIS | MN | E | R | B | 2 | 28 | Y | 44 | 24 | 12 | H | 2002-10-23 | |||
| 10 | JONESBORO | AR | I | R | B | 17 | 15 | Y | 70 | 40 | 8 | H | 2002-10-23 | |||
| 2800 Square foot house. 13 Windows w/2 in garage. 13 Interior doors. 3 Exterior doors. 1 door for garage storage room. Walls & Trim. Ceiling in living room vaulted to 14 feet. | ||||||||||||||||
| 9 | BROOKLYN | NY | I | R | B | 0 | 0 | Y | 10 | 20 | 8 | H | 2002-10-21 | |||
| Faux finish, venetian plaster | ||||||||||||||||
| 8 | MINNEAPOLIS | MN | E | R | B | 5 | 10 | Y | 45 | 48 | 12 | M | 2002-10-21 | |||
| 7 | NAPERVILLE | IL | I | R | W | 2 | 2 | N | 12 | 15 | 8 | H | 2002-10-21 | |||
| 6 | NAPERVILLE | IL | I | R | W | 2 | 2 | N | 12 | 15 | 8 | H | 2002-10-21 | |||
| 5 | MONROE | NC | I | R | B | 12 | 14 | Y | 12 | 20 | 8 | M | 2002-10-17 | |||
| 4 | VISALIA | CA | E | R | W | 2 | 10 | N | 30 | 70 | 20 | L | 2002-10-17 | |||
| old victorian needs touch up | ||||||||||||||||
| 3 | BOULDER CITY | NV | E | R | B | 6 | 12 | Y | 20 | 20 | 20 | M | 2002-10-16 | |||
| 678 square feet of space some high cellings | ||||||||||||||||
| 1 | MAPLECREST | NJ | E | R | B | 2 | 22 | Y | 26 | 36 | 21 | H | 2002-10-12 | |||
| Front porch needs to be painted. Exposed masonry of basement also needs to be repainted. House is 2 floors with an attic. Attic walls only on two sides (roof comes to top of 2nd floor on other two sides) | ||||||||||||||||
|
|