6557 Available Projects
From November 3, 2002 to Today
Contractors: please click on Login button above to login and submit bids on these projects.
Column heading buttons: click on to sort by (e.g. click on RC to see all commercial jobs first and residential jobs second, or click on State button to sort by State, etc.).
Column Definitions: ID=Reference Number, IE=Interior/Exterior, RC=Residential/Commercial, P=Paint Walls/Trim/Both, D=# of Doors, Win=# of Windows, OB=Overhang/Baseboard paint Yes/No, W=Width in feet, L=Length in feet, H=Height in feet, Q=Quality Low/Medium/High.
Results Page(s) (100 per page): 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66
ID | Ci | St | IE | RC | P | D | Win | OB | W | L | H | Q | Posted |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Description | |||||||||||||
5835 | CARROLLTON | TX | I | R | W | 3 | 1 | N | 15 | 10 | 10 | M | 2008-04-29 |
old wall paper removed,textured and faux finish | |||||||||||||
5834 | FLUSHING | MI | I | R | B | 0 | 5 | N | 0 | 0 | 0 | M | 2008-04-28 |
mfg. home with vaulted ceilings. May want removal of popcorn ceiling finish. 3 bedrms, dining/living area and kitchen. | |||||||||||||
5833 | DOUBLE OAK | TX | E | R | B | 2 | 8 | N | 30 | 60 | 10 | M | 2008-04-28 |
I am looking for quotes on painting the exterior trim work of a single story all brick home. Painting only exposed wood, chimney and trim. Not painting doors. I would also like to have some damaged wood trim around exterior doors replaced and painted. | |||||||||||||
5832 | CHICAGO | IL | I | R | B | 14 | 0 | Y | 30 | 60 | 10 | H | 2008-04-28 |
new drywall, reused trim (must be caulked and spackled nail holes. | |||||||||||||
5831 | W LINN | OR | E | R | T | 2 | 10 | Y | 20 | 40 | 40 | H | 2008-04-28 |
job includes trim paint same color or close, shutters paint darker color, caulking everywhere and touch up work where there is repair and caulking | |||||||||||||
5830 | GURNEE | IL | I | R | B | 12 | 6 | Y | 0 | 0 | 0 | M | 2008-04-28 |
The home needs to be primed first. I would like two separete colors one on the walls (linen or eggshell white), then the windows and trim a glossy bright white as well as a flat white for the ceilings. The home is about 1200 square feet, I would like ever | |||||||||||||
5829 | WASHOUGAL | WA | I | R | W | 5 | 3 | N | 12 | 14 | 9 | M | 2008-04-28 |
Master bath, 2 doors 1 small window - master bedroom 2 doors- 1 sliding glass door kitchen above and below cabinets - not a lot of wall space to paint | |||||||||||||
5828 | CARROLLTON | TX | I | R | W | 3 | 1 | N | 15 | 10 | 10 | M | 2008-04-27 |
old wallpaper removed, textured and faux finish | |||||||||||||
5827 | SHELBY TOWNSHIP | MI | I | R | B | 3 | 1 | Y | 0 | 200 | 4 | M | 2008-04-27 |
New finished basement. Primer currently on walls and I have purchased the paint from Sherwin Williams. Total wall sq ft is 2,000. One large room, one small bath, one small 12x12 room. Also paint all door and baseboard trim. No ceiling to paint. | |||||||||||||
5826 | LAKE ARROWHEAD | CA | E | R | B | 0 | 0 | Y | 80 | 250 | 50 | H | 2008-04-27 |
5825 | LAKE ARROWHEAD | CA | E | R | B | 8 | 41 | Y | 80 | 250 | 50 | H | 2008-04-27 |
5824 | BARNES | IL | I | R | W | 0 | 0 | N | 0 | 0 | 0 | H | 2008-04-26 |
interior painting entire house 2500 sq ft | |||||||||||||
5823 | COLLEGE STATION | TX | I | C | B | 20 | 0 | Y | 0 | 0 | 0 | H | 2008-04-26 |
two 50 x 50 suits with multable offices. I can send you plans via email. | |||||||||||||
5822 | GREEN OAKS | IL | E | R | B | 1 | 11 | Y | 0 | 0 | 0 | M | 2008-04-25 |
I would like to get an estimate of how much it would cost to paint the exterior of my home | |||||||||||||
5821 | NAPLES | FL | I | R | B | 17 | 0 | Y | 34 | 50 | 9 | M | 2008-04-21 |
Original Builders all white paint done in 2001, current wall condition very good, Repaint all walls using Sherwin Williams Duration Interior eggshell latex Khaki Tan, repaint all baseboard, door & window trim gloss white latex. No painting required for c | |||||||||||||
5820 | ARVADA | CO | E | R | B | 2 | 11 | Y | 45 | 75 | 22 | H | 2008-04-20 |
tri level, need some 1x2 striping replaced no 2 story side. | |||||||||||||
5819 | BETHLEHEM | NC | E | R | B | 6 | 16 | Y | 48 | 52 | 0 | M | 2008-04-20 |
2 stories & basement. Unknown height. Walk in basement with 2 walls to be painted - 52' and 20'. Length and width of main level 52' x 48', top level 52' x 36'. 2 large decks to be painted. Car port with 32' x 8' walls enclosing a utility room. | |||||||||||||
5818 | MARIETTA | GA | I | R | B | 0 | 15 | Y | 0 | 0 | 0 | M | 2008-04-19 |
we remodeled a small 1971 ranch home on basement all primer is on, needs minor finishing touches and good paint job and trim all, all interior 3 small bedrooms, medium master two very small bathrooms, kitchen 1 wall total, basement small, living room, di | |||||||||||||
5817 | CUMMING | GA | E | R | B | 2 | 22 | N | 60 | 30 | 30 | H | 2008-04-19 |
10 year old residential house with brick front. Need trim, shutters and siding painted. Flexible with time frame. Also has two garage doors. Please provide references to your most recent jobs. I will contact your references. | |||||||||||||
5816 | GREENWOOD | WA | E | R | B | 3 | 14 | Y | 30 | 100 | 16 | M | 2008-04-18 |
5815 | OLATHE | KS | I | R | B | 1 | 1 | N | 186 | 240 | 99 | M | 2008-04-17 |
Half of the room has the 16" ceiling and the other half has 7.5' ceiling. It has the cottage cheese finish on all of it. I would like to have the ceiling painted but not necessary. Please bid them seperately. I will take everything off the walls and move | |||||||||||||
5814 | WATTSVILLE | VA | E | R | B | 89 | 90 | Y | 100 | 200 | 10 | M | 2008-04-17 |
WE ARE OFFERING YOUR COMPANY A PAINTING CONTRACT, WE HAVE A 24 DECK BUIDING WITH 200 OFFICES AND 24 HALLS. YOU ARE TO PAINT THE INSIDE AND OUTSIDE INCLUDING THE SECURITY WALLS, AND GATE. SEND US YOUR QUOTATIONS AS SOON AS POSSIBLE. SEND YOUR FULL CONTACT | |||||||||||||
5813 | GILBERT | AZ | E | R | T | 0 | 0 | N | 0 | 0 | 0 | M | 2008-04-16 |
I only need the back patio preprep and painted again. You can paint the back gate too It is average with posts and a enclosed top Half a days job if that Sorry its not more yet I currently have a high bid, can anyone save me some money Thank you | |||||||||||||
5812 | HALES CORNERS | WI | E | R | B | 2 | 20 | Y | 24 | 65 | 10 | M | 2008-04-16 |
Tri -Level Ranch Home - Bedrooms over garage, | |||||||||||||
5810 | CLEVELAND | OH | I | R | B | 1 | 2 | Y | 18 | 16 | 8 | M | 2008-04-12 |
Texture Ceiling, remove wall paper, prime and paint ceiling and walls in kitchen need estimate please | |||||||||||||
5809 | MC KINNEY | TX | I | R | B | 7 | 9 | Y | 93 | 109 | 9 | M | 2008-04-11 |
moving into a new home It is eighteen hundred sq ft and every room and all ceilings need to be repainted three bed three bath kitchen, office, dinging and living All doors and trim need to be painted also Looking for a great deal so I can sell the husband | |||||||||||||
5808 | COLD SPRING | NY | I | R | W | 0 | 0 | N | 10 | 20 | 8 | M | 2008-04-10 |
hardwood, area rugs, 3 pieces of heavy furniture, 2 light 3 rooms this size need painting for walls only, one coat, some prep, nothing major | |||||||||||||
5807 | DEARBORN | MI | I | R | B | 0 | 0 | Y | 27 | 21 | 8 | H | 2008-04-09 |
5806 | BURLINGTON | NJ | I | R | B | 22 | 11 | Y | 45 | 60 | 8 | H | 2008-04-08 |
Some minor wallboard water damage repair - total of about 10' x 10' area. | |||||||||||||
5805 | DECATUR | IL | I | R | B | 4 | 12 | Y | 20 | 40 | 12 | M | 2008-04-06 |
remove wall paper in 5 rooms and paint ceilings and walls | |||||||||||||
5804 | DALLAS | TX | I | R | B | 20 | 15 | Y | 65 | 63 | 9 | M | 2008-04-05 |
New house is 4100 sf stain cabinets, | |||||||||||||
5803 | LONGVIEW | TX | I | R | T | 19 | 8 | Y | 0 | 0 | 0 | M | 2008-04-05 |
all baseboard and doors and door casings, including 19 doors and door caseings stair railing 8-10 window casings. Baseboard is 3" home is about 2850-3000 sq ft of living space | |||||||||||||
5802 | SOUTH RIVER | NJ | E | R | B | 3 | 22 | Y | 15 | 40 | 32 | H | 2008-04-04 |
2-1/2 story colonial house with a 8x4 wood awning over back sun porch area which would require to be painted. | |||||||||||||
5801 | NORTH PERRY | OH | I | R | B | 0 | 0 | Y | 30 | 44 | 8 | M | 2008-04-04 |
1) Living Room (12 x 19) 2) Hallway(4 x 12'8") 3) Master Bedroom (12 x 14) | |||||||||||||
5800 | HUNTLEY | IL | I | R | B | 1 | 1 | N | 5 | 10 | 8 | H | 2008-04-03 |
bath painted dark red i want it light blue | |||||||||||||
5799 | BOTHELL | WA | E | R | B | 2 | 12 | Y | 30 | 40 | 16 | M | 2008-04-01 |
2 story house, with wood exterior. 1st floor 1000 sqft, 2nd floor 910 sqft, attached garage 440 sqft. 2 garage doors. | |||||||||||||
5798 | CANTON | GA | I | R | W | 0 | 0 | N | 20 | 14 | 9 | L | 2008-04-01 |
New construction house - moving in late April - 10 rooms (2 bathrooms) 2800 sq feet of wall space. 9 foot ceilings. no dark colors | |||||||||||||
5797 | TULSA | OK | E | R | B | 4 | 17 | Y | 2 | 180 | 18 | H | 2008-03-30 |
I have a two story 4,800 sq.ft. home, built in 1981. The lower story is sandstone, and only the windows and doors need trim paint on the lower level (different color from rest of house). The upper story is primarily T-111 type cedar siding. The paint is | |||||||||||||
5796 | CHANDLER | AZ | E | R | T | 0 | 0 | Y | 25 | 40 | 8 | M | 2008-03-28 |
House has not been painted in quite some time and the trim needs some extra attention, i.e. scraping or sanding. I already have the paint, just need someone with the tools and ability to paint it properly. | |||||||||||||
5795 | BLEWETT | WA | E | R | W | 0 | 0 | N | 24 | 0 | 8 | M | 2008-03-27 |
Looking for a artist to paint a Bavarian mural on the exterior fo my house in Leavenworth, Washington | |||||||||||||
5794 | BLEWETT | WA | E | R | W | 0 | 0 | Y | 24 | 0 | 8 | M | 2008-03-27 |
Looking for a artist to paint a Bavarian mural on the exterior fo my house in Leavenworth, Washington | |||||||||||||
5793 | MINNEAPOLIS | MN | E | R | W | 0 | 0 | N | 0 | 0 | 0 | M | 2008-03-27 |
Standard south Minneapolis bungalow home. Stucco exterior, looking to have painted. | |||||||||||||
5792 | PIONEER TOWN | TX | I | R | W | 0 | 0 | N | 0 | 0 | 0 | M | 2008-03-25 |
paint in entry hall, living room, kitchen and breakfast room only. no firm start date, could be sooner or a later if needed. House in Woodcreek subdivision. | |||||||||||||
5791 | CONROE | TX | I | R | B | 0 | 5 | Y | 36 | 25 | 8 | M | 2008-03-24 |
Living room and dining room. The rooms are currently painted with a olive green. We would like to change the color to a tan/light brown color. There are no doors going into the rooms, just open entry-way's. | |||||||||||||
5790 | EVERETT | WA | E | R | B | 3 | 10 | Y | 38 | 35 | 18 | H | 2008-03-23 |
We also have a 12X12 shed we want painted to match the house. The shed has a double door and 2 windows. | |||||||||||||
5789 | AURORA | CO | E | R | B | 1 | 8 | Y | 40 | 40 | 25 | H | 2008-03-21 |
2 story built in 1992 with hardboard lap siding and rough sawed cedar trim. Needs some calking work. Also has a back patio needing attention. Aluminum windows do not need paint. Gutters and trim are white. | |||||||||||||
5788 | MC KINNEY | TX | I | R | W | 0 | 0 | N | 60 | 30 | 10 | M | 2008-03-21 |
2200 sq. ft house, needs some taping and sealing of cracks, patching of nail holes, and then painted. House is 2 years old, just needs a fresh coat of paint before move in. | |||||||||||||
5787 | CRYSTAL | MN | I | R | B | 8 | 10 | Y | 87 | 58 | 9 | H | 2008-03-19 |
5786 | GILBERT | AZ | E | R | B | 2 | 10 | N | 30 | 70 | 7 | M | 2008-03-19 |
Paint the exterior of an 1800 sft single story home. Looking for this to be completed March 24, 25, 26 preferably. | |||||||||||||
5785 | ATL | GA | I | R | B | 12 | 6 | Y | 30 | 40 | 8 | H | 2008-03-18 |
This is a 2/1 1200 sf. condominium. Paint: Walls Latex Flat Doors (both sides) trim, baseboards in oil Need a quote with and without ceilings. email me any questions | |||||||||||||
5784 | CHANDLER | AZ | E | R | B | 2 | 14 | Y | 55 | 55 | 16 | M | 2008-03-18 |
5783 | BUCKHANNON | WV | E | R | B | 2 | 0 | Y | 32 | 32 | 2 | H | 2008-03-17 |
32x32x8 3 doremers 2' overhangs scraped pressure washed | |||||||||||||
5782 | MCCULLERS | NC | E | R | W | 0 | 0 | N | 0 | 389 | 5 | M | 2008-03-17 |
6" board with 2" spacing picket fence. Needs stain. Newly installed in August 07. | |||||||||||||
5781 | BRIGHTON | CO | E | R | B | 4 | 19 | Y | 40 | 40 | 27 | H | 2008-03-17 |
5780 | COLOGNE | TX | I | R | W | 0 | 0 | N | 0 | 0 | 0 | H | 2008-03-16 |
I have a master bedroom ceiling that has a big water stain and i want it painted and/or primed if necessary. The ceiling is approximately 15'x16'. | |||||||||||||
5779 | MADISON | WI | E | R | B | 3 | 13 | Y | 0 | 0 | 0 | M | 2008-03-16 |
1400 sq. ft. ranch style house with overhang | |||||||||||||
5778 | MINNEAPOLIS | MN | I | R | W | 0 | 14 | N | 30 | 60 | 9 | M | 2008-03-14 |
House currently empty. Interior, potentially exterior needs to be painted. One room has wallpaper which needs to come off. House 1400 sqft, 1.5stories, living rm, family room, kitchen, bath, two bedrooms downstairs, and loft converted to bedroom upstai | |||||||||||||
5777 | MINNEAPOLIS | MN | I | R | W | 0 | 14 | N | 30 | 30 | 9 | M | 2008-03-14 |
House currently empty. Interior, potentially exterior needs to be painted. One room has wallpaper which needs to come off. House 1400 sqft, 1.5stories, living rm, family room, kitchen, bath, two bedrooms downstairs, and loft converted to bedroom upstai | |||||||||||||
5776 | ROWLETT | TX | I | R | W | 26 | 10 | Y | 60 | 30 | 9 | M | 2008-03-14 |
Kitchen does not need paint 220sf Not sure of the room sized, room by room 9ft ceilings Entry has one wall that is two story height | |||||||||||||
5775 | WEST CRESSONA | PA | E | C | W | 0 | 0 | N | 40 | 60 | 16 | H | 2008-03-13 |
New construction- 3 bay block garage. Would like lower 1/3 black & upper 2/3 silver. | |||||||||||||
5774 | RAPHINE | VA | I | R | B | 9 | 6 | Y | 4 | 349 | 4 | H | 2008-03-13 |
new construction walls, cieling, closets and trim | |||||||||||||
5773 | KATY | TX | I | C | B | 8 | 7 | N | 90 | 97 | 8 | M | 2008-03-13 |
about 3500 sq. ft. | |||||||||||||
5772 | CARLSBAD | CA | E | R | W | 0 | 0 | N | 30 | 60 | 10 | M | 2008-03-11 |
Not sure on measurements above. House is standard 3Bed, 2Ba, 2 stories, approximately 1,791 square feet. | |||||||||||||
5771 | COVINGTON | GA | I | C | B | 20 | 33 | Y | 50 | 100 | 10 | H | 2008-03-11 |
6000 sq ft medical facility | |||||||||||||
5770 | WEST PALM BEACH | FL | I | R | B | 5 | 8 | Y | 99 | 99 | 99 | H | 2008-03-08 |
This is a rental property about 1350 sq feet 3/bed/2bath in Williamsburg area. House will be vacant and carpet will be replaced after paint job. Ready for immediate hire. | |||||||||||||
5768 | WINDERMERE | FL | I | R | W | 11 | 13 | N | 0 | 0 | 9 | H | 2008-03-05 |
I was wanting to get an rough estimate on painting the interior of my home. I need appr. 2000 sq. feet of my home done. Most ceilings are 8-9 feet, except the stairwell/foyer area has really high ceilings. The walls are slightly textured. I wanted dif | |||||||||||||
5767 | AUBURN | WA | I | R | B | 1 | 7 | Y | 60 | 30 | 12 | M | 2008-03-04 |
Interior of a "California Split" home. Home is just under 1800 sq feet but job DOES NOT include any of 3 bedrooms or 2 bathrooms. To be painted: Two entrance ways, two living rooms, kitchen, breakfast nook, dining room, hallway | |||||||||||||
5766 | TOLEDO | OH | E | R | B | 2 | 18 | Y | 30 | 80 | 8 | M | 2008-03-04 |
paint aluminum siding | |||||||||||||
5765 | OLATHE | KS | I | R | W | 0 | 0 | N | 0 | 0 | 0 | H | 2008-03-03 |
one bedroom | |||||||||||||
5763 | NEENAH | WI | I | C | W | 3 | 15 | N | 80 | 40 | 20 | M | 2008-02-29 |
1 third has second floor and 2 thirds does not. | |||||||||||||
5762 | DUNDEE | NJ | I | R | W | 4 | 1 | Y | 18 | 21 | 12 | L | 2008-02-29 |
Interior of very smal studio | |||||||||||||
5761 | JONESVILLE | IL | E | R | B | 3 | 0 | Y | 60 | 30 | 8 | M | 2008-02-28 |
there is 1 front door, and 2 garage doors and painting the 3 above Cream color. | |||||||||||||
5760 | MOUNT PLEASANT | TN | I | R | W | 3 | 0 | N | 60 | 30 | 8 | L | 2008-02-28 |
there is 1 front door, and 2 garage doors and painting the 3 above Cream color. | |||||||||||||
5759 | ROXBURY | CT | I | R | W | 3 | 2 | N | 60 | 30 | 8 | L | 2008-02-28 |
1 Front door, 2 room doors and two windows need to be painted with an expert painter.... (3 doors and 2 windows). | |||||||||||||
5758 | EAST MATUNUCK | RI | E | R | B | 0 | 7 | N | 25 | 45 | 10 | M | 2008-02-25 |
powerwash prior to painting | |||||||||||||
5757 | PASADENA | CA | E | R | B | 1 | 20 | Y | 40 | 80 | 24 | H | 2008-02-25 |
1,000 square foot, single story house | |||||||||||||
5756 | PLANO | TX | I | R | B | 15 | 20 | N | 100 | 100 | 12 | H | 2008-02-25 |
Two Story House, 3000 sqft. Complete Interior Painting. Some rooms 1 coat, some rooms 2 coats. cabinet staining. Looking for a painter offering best price, references,show me photos of previous work | |||||||||||||
5755 | CLIFF PARK | NJ | I | R | B | 9 | 0 | Y | 40 | 30 | 8 | H | 2008-02-25 |
5754 | FLOWERY BRANCH | GA | E | R | B | 3 | 8 | Y | 44 | 30 | 25 | H | 2008-02-24 |
there is 1 front door, and 2 garage doors making the 3 above. simple color scheme. base color, white trim and separate shutter color. shutters and front door will be same color, garage doors same as base color | |||||||||||||
5752 | NAPLES | FL | I | R | W | 0 | 0 | N | 42 | 53 | 11 | M | 2008-02-21 |
Empty house just needs a fresh coat of paint.1873 sq ft living space. | |||||||||||||
5751 | SALEM | NH | I | R | W | 0 | 0 | N | 0 | 0 | 0 | M | 2008-02-21 |
Small 900 ft condo. Kitchen, Living Room, Hallways, 2 Bedrooms and Bathroom. Walls and ceilings. Almost all trim is done except two doors. Needs primer and one or two coats. | |||||||||||||
5750 | PHOENIX | AZ | I | R | B | 28 | 18 | N | 80 | 35 | 8 | H | 2008-02-20 |
smoke damage throughout whole house, walls need to be thouroughly cleaned before any material is applied, tile thoughout whole house, wooden blinds, recessed and in ceiling light fixtures throughout also have smoke damage and need to be appropriately addr | |||||||||||||
5749 | HOLLADAY | UT | I | R | B | 1 | 0 | Y | 13 | 13 | 7 | H | 2008-02-20 |
small bedroom with a closet | |||||||||||||
5748 | BURLINGAME | CA | I | C | B | 2 | 5 | Y | 25 | 25 | 25 | H | 2008-02-18 |
this is a stairweel that was previously painted but not primered. it needs to be corrected. | |||||||||||||
5747 | EAST HADDONFIELD | NJ | E | R | B | 2 | 12 | N | 60 | 60 | 40 | M | 2008-02-18 |
cedar sided home currently chocolate brown and fading. | |||||||||||||
5746 | DENTON | TX | I | R | W | 0 | 0 | N | 0 | 0 | 0 | M | 2008-02-18 |
Need spray texture (orange peel) applied to the ceilings and some walls in a 2100 square foot house. We would like a quote for just the spray texture and a quote for texture and paint for just the ceiling. The ceiling color would be white. The quote sho | |||||||||||||
5745 | LAWRENCEVILLE | GA | I | R | B | 11 | 6 | Y | 1 | 1 | 8 | H | 2008-02-18 |
(15 x 15 x 8) (6 x 10 x 8) (6 x 6 x8) (15 x 15 x 8)(16 x 18 x 10) (17 x 6 x 8)( 9 x 12 x 8)(6 x 6 x 8)(12 x 12 x 8) (6 x 12 x8 2 walls have units) all rooms have molding | |||||||||||||
5744 | DACULA | GA | E | R | T | 3 | 8 | Y | 3 | 250 | 12 | H | 2008-02-18 |
5743 | TACOMA | WA | I | R | B | 1 | 1 | N | 11 | 11 | 10 | H | 2008-02-14 |
5742 | W LINN | OR | E | R | B | 0 | 0 | Y | 30 | 37 | 10 | H | 2008-02-13 |
936 sf house that I am purchasing and we need to have it painted before we can close on the loan. | |||||||||||||
5741 | LAS VEGAS | NV | E | R | B | 2 | 12 | Y | 40 | 55 | 20 | H | 2008-02-12 |
5740 | FRUIT HEIGHTS | UT | E | R | B | 0 | 0 | Y | 0 | 0 | 0 | H | 2008-02-12 |
i don't know what the "overhang" references. the house is appx 2800 sq feet. some ceilings are in need of paint in addition to walls and trim | |||||||||||||
5739 | EUCLID | FL | I | R | B | 0 | 3 | N | 0 | 0 | 0 | L | 2008-02-11 |
One small kitchen, and medium sized study. Easy one coat and no ceilings need to be done. No prep work either. Looking for someone around 150 for both, it's a quick job. I will do second coat on trim. | |||||||||||||
5738 | ATCO | NJ | E | R | B | 0 | 0 | Y | 60 | 30 | 20 | H | 2008-02-11 |
Basic two story house, walls and trim, and four sets of shutters | |||||||||||||
5737 | CONCORD | NH | I | R | B | 7 | 8 | Y | 0 | 0 | 0 | M | 2008-02-10 |
First time home buyer, looking for quotes to quickly paint kitchen, living room, bathroom and 3 small bedrooms in small ranch, 960 sq. feet. Would also like a quote for just the living room and kitchen area. | |||||||||||||
5736 | WEBSTER GROVES | MO | I | R | W | 1 | 1 | N | 12 | 12 | 12 | M | 2008-02-09 |
5735 | NORTH PROVIDENCE | RI | I | R | B | 0 | 0 | Y | 70 | 20 | 7 | H | 2008-02-07 |
bungalow-- just guessed on the dimensions....medium sized rooms--want living/dining room, kitchen, 2 bedrooms, and basement panelling painted :) | |||||||||||||
5734 | PEORIA | AZ | I | R | W | 0 | 0 | N | 60 | 30 | 12 | H | 2008-02-06 |
5733 | MC KINNEY | TX | I | R | B | 6 | 12 | Y | 60 | 30 | 10 | H | 2008-02-06 |
I basically have a long living room area with an attached kitchen that needs painting. The cabinetry in the kitchen will not need to be painted. Also, please include pricing for a standard two-color faux finish as my wife likes that look. Thanks. | |||||||||||||
5732 | PANAMA CITY | FL | E | R | W | 3 | 0 | N | 44 | 53 | 14 | H | 2008-02-06 |
1534 sq foot house, 1 story stucco only and 3 doors. Slightly darker paint than currently in stucco. Looking for better estimate than 2200. Must have references. |