6557 Available Projects
From November 3, 2002 to Today
Contractors: please click on Login button above to login and submit bids on these projects.
Column heading buttons: click on to sort by (e.g. click on RC to see all commercial jobs first and residential jobs second, or click on State button to sort by State, etc.).
Column Definitions: ID=Reference Number, IE=Interior/Exterior, RC=Residential/Commercial, P=Paint Walls/Trim/Both, D=# of Doors, Win=# of Windows, OB=Overhang/Baseboard paint Yes/No, W=Width in feet, L=Length in feet, H=Height in feet, Q=Quality Low/Medium/High.
Results Page(s) (100 per page): 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66
ID | Ci | St | IE | RC | P | D | Win | OB | W | L | H | Q | Posted |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Description | |||||||||||||
4378 | INVERNESS | IL | I | R | W | 9 | 3 | N | 36 | 32 | 10 | M | 2006-03-30 |
est about 800sq feet of wall space. 4 doors (both sides) 3 sliding closet doors. pair of french doors (both sides). front door one side. short hallway that is mostly doors. 1 sm bathroom. it is a loft unit that has a ceiling only in kitchen and small hall | |||||||||||||
4377 | CANYON LAKE | TX | I | R | B | 37 | 50 | N | 1 | 1 | 1 | H | 2006-03-30 |
5428 sqft, 9 ft ceilings second floor, 10 ft to 23 ft ceilings on first floor. Ceilings do not need paint. Oil base on trim. Satin latex on walls. Color changes. | |||||||||||||
4376 | QUAIL VALLEY | CA | I | R | W | 0 | 0 | N | 15 | 21 | 16 | M | 2006-03-30 |
New construction. Empty home. Very little prep. 3 walls are 8' height. 1 wall is 16' height.Stairwell and stair rail included in job. Flexible on date. Additional work if price is right. | |||||||||||||
4375 | COTTONDALE | AL | E | R | B | 3 | 7 | Y | 16 | 30 | 12 | M | 2006-03-30 |
addtion is primed 1 french door old windows need scraping exposed rafters and deckboards trim only on windows | |||||||||||||
4374 | FORT COLLINS | CO | E | R | B | 4 | 13 | Y | 40 | 42 | 18 | H | 2006-03-29 |
exterior paint 2 story, 1600 sq ft house - probably dark green base, white trim. front/side doors, garage door, back sliding door. Quality more medium/high - thorough prep job, but 1 coat of good paint should be good if it covers. Looking to get it done | |||||||||||||
4373 | ALLISON PARK | PA | I | R | B | 16 | 25 | Y | 147 | 251 | 9 | H | 2006-03-29 |
Fifteen year old house with large two story entry way Unoccupied base walls and ceiling in good shape minimal patching needed | |||||||||||||
4372 | LAWRENCEVILLE | GA | E | R | B | 1 | 0 | Y | 0 | 0 | 0 | M | 2006-03-29 |
I would like to have my shutters on the from of my home, overhang and front door painted black. | |||||||||||||
4371 | DENVER | CO | E | R | B | 2 | 11 | Y | 50 | 50 | 17 | M | 2006-03-29 |
1 single car garage door, not sure about measurments, approx. 950 sq ft living space 1/2 & 1/2 brick home, some shutters involved, has covered patio in backyard ranch style home | |||||||||||||
4370 | DENVER | CO | E | R | B | 2 | 11 | Y | 50 | 50 | 25 | M | 2006-03-29 |
1 single car garage door, not sure about measurments, approx. 950 sq ft living space 1/2 & 1/2 brick home, some shutters involved, has covered patio in backyard ranch style home | |||||||||||||
4369 | DENVER | CO | E | R | T | 3 | 14 | Y | 25 | 60 | 20 | M | 2006-03-29 |
This is a traditional Washington Park bungalow that we've sprucing up in order to put on the market at the end of April 2006. The house is approx. 1100 sq. ft. South and west-facing exterior is peeling. | |||||||||||||
4368 | NAPLES | FL | I | R | B | 5 | 4 | N | 0 | 0 | 0 | M | 2006-03-29 |
2 bedroom/1 bath total of 1037 sq feet, vaulted ceiling in living room | |||||||||||||
4367 | CORDOVA | TN | I | R | W | 1 | 3 | N | 10 | 11 | 10 | H | 2006-03-29 |
We began painting kitchen red and are having problems with light/dark spots. We need it fixed and finished. | |||||||||||||
4366 | INDIANAPOLIS | IN | I | C | W | 3 | 1 | N | 0 | 0 | 0 | M | 2006-03-29 |
We want 2-3 rooms 36 x 38 x 12 | |||||||||||||
4365 | CELINA | TX | I | R | B | 0 | 6 | Y | 14 | 12 | 10 | H | 2006-03-29 |
Approximately 520 Square feet. Need kitchen (pretty small) painted one color, living painted a second color and dining area a third color. | |||||||||||||
4364 | LOXAHATCHEE | FL | I | R | W | 0 | 0 | N | 25 | 25 | 15 | H | 2006-03-29 |
4363 | LAKE WORTH | FL | I | R | W | 0 | 0 | N | 25 | 25 | 15 | H | 2006-03-29 |
4362 | NAPLES | FL | I | R | W | 0 | 0 | N | 20 | 10 | 11 | H | 2006-03-28 |
2175 sf - 1 floor, 3 BDR,3.5 BA Interior flat paint-2 coats, WALLS ONLY. Labor cost ONLY. Include separate quote for painting the BATHROOMS using Linen application process. MUST SHOW 500,000 GENERAL LIABILITY COVERAGE | |||||||||||||
4361 | S SALT LAKE | UT | E | R | T | 1 | 11 | Y | 2 | 30 | 0 | M | 2006-03-28 |
I need the outside trim/overhang of my home painted, there is also a back patio that needs to be done all in a single color. It is a 2 story, built in 1911.... there will need to be some scraping, and definately scaffolding to reach the 2nd floor, where | |||||||||||||
4360 | MESA | AZ | I | R | B | 0 | 4 | Y | 1 | 1 | 1 | M | 2006-03-28 |
about 900 square feet. 2 bedrooms, 1 bath, living room and kitchen. | |||||||||||||
4359 | LAS VEGAS | NV | I | R | B | 5 | 4 | Y | 59 | 50 | 8 | M | 2006-03-28 |
1 livingroom has fireplace 2 small baths hall 2 bds sm.kitchen/dinning large sliding doors 1 coat good paint no repairs needed. | |||||||||||||
4358 | PUEBLO | CO | I | R | W | 2 | 1 | N | 12 | 12 | 8 | M | 2006-03-28 |
bedroom 12' X 12' | |||||||||||||
4357 | CITRUS HEIGHTS | CA | I | R | B | 9 | 12 | Y | 30 | 75 | 8 | H | 2006-03-28 |
entire interior ceilings baseboard doors window trim baseboard. 90percent Lath and plaster 10 percent cinderblock.Width Length Heigth dementions are entire inside estimated calcultion | |||||||||||||
4356 | BETHESDA | MD | I | R | B | 11 | 15 | N | 25 | 60 | 8 | H | 2006-03-28 |
A three level townhouse a total of 1900 sq ft stairway area is two stories high.Windows are metal clad no painting necessary. | |||||||||||||
4355 | COMUS | MD | I | R | W | 78 | 15 | Y | 500 | 900 | 99 | M | 2006-03-28 |
It is a three level townhouse, just the walls need to be painted. a total of 1900 sq ft.windows are aluminum | |||||||||||||
4354 | SUFFOLK | VA | I | R | W | 0 | 0 | Y | 60 | 30 | 8 | H | 2006-03-27 |
We would like the whole interior painted, our house is 2500 sq ft, currently only has white paint in everyroom. We have 4 bedrooms, 3 baths, kitchen, dining room, den, family room. Unsure of the exact dimensions, currently we are living in Japan and will | |||||||||||||
4353 | COLUMBUS | OH | E | R | B | 0 | 4 | N | 0 | 0 | 0 | H | 2006-03-27 |
Exterior of my home needs painting. Trim on windows amd exterior of house. House is primarily siding, but has trim areas and one main area in the front need attention. | |||||||||||||
4352 | OLIVE BRANCH | MS | E | R | B | 2 | 5 | Y | 55 | 20 | 35 | H | 2006-03-27 |
Home is at 6362 Oak Run Drive East in Olive Branch, MS. if you want to estimate.My cell phone is 901-647-8513 and my name is Tony Grubbs | |||||||||||||
4351 | POWDER SPRINGS | GA | E | R | B | 3 | 30 | Y | 50 | 35 | 45 | M | 2006-03-27 |
Front is all brick except trim other and porch columns 3 sides needs paint. 2 story house and basement. 2 coats not required, but a job done better then the builder and a thicker coat is. Also interested in having all of my windows chaulked before pain | |||||||||||||
4350 | OWINGS MILLS | MD | I | R | B | 5 | 1 | Y | 36 | 24 | 7 | H | 2006-03-27 |
living room is 22 X 11 dining room is 14 X 11 Doors painted will be the front, closet, bath, and french doors. Window trim - one large window in living room. FLEXIBLE ON DATES | |||||||||||||
4349 | BELLEVUE | TN | E | R | B | 1 | 6 | N | 50 | 50 | 15 | M | 2006-03-27 |
I will need to get you measurements - entered above is not correct - but am interested in quotes for exterior painting of brick/vinyl - smaller ranch style home - mostly brick - some vinyl on top. | |||||||||||||
4348 | KAGEL CANYON | CA | E | R | T | 0 | 0 | Y | 0 | 0 | 0 | H | 2006-03-27 |
4346 | SAINT CHARLES | MO | E | R | B | 0 | 0 | N | 999 | 999 | 99 | H | 2006-03-25 |
seeking bids on exterior house painting job in St. Charles, MO (off central school road& midrivers drive) will most likely install soffit prior to paint will require proof of insurance and lien waivers bbb good standing | |||||||||||||
4345 | SCOTTSDALE | AZ | I | R | W | 0 | 0 | N | 14 | 50 | 12 | M | 2006-03-25 |
walls only in living room, dining room and up wide stairs, vaulted ceilings | |||||||||||||
4344 | BUENA VENTURA LAKES | FL | I | R | B | 8 | 5 | Y | 35 | 40 | 20 | M | 2006-03-24 |
1464 sq ft condo with 2 stories. 3 beds, 3 baths. Will need ceilings done, as well. One window is sliding glass doors at end of great room. | |||||||||||||
4343 | WAKEFIELD | MA | E | R | T | 2 | 14 | N | 25 | 35 | 20 | M | 2006-03-24 |
I'd like quotes on painting my external trim on my house - specifically around the doors and windows. I also have shutters that need to be painted. Some need to be replaced as well. Could you do that as well I also have a wood around my desk that need | |||||||||||||
4342 | ROSWELL | GA | I | R | B | 12 | 8 | Y | 36 | 46 | 24 | M | 2006-03-24 |
Just guessing on the dimensions. Need 2 rooms painted and one hallway. As well as all trim and doors and window frames painted through out the house. One ceiling touch up required from water stain (size approx 1'x1'). | |||||||||||||
4341 | CATALPA | VA | I | R | B | 18 | 19 | Y | 0 | 0 | 0 | H | 2006-03-24 |
2200sq ft new house has primer coat from construction needs 3 bathrooms, 1 bedroom, livingroom, dining room, family room, kitchen and 2 hallways painted very little prep needed looking for a high quality job Start and finish dates are flexable | |||||||||||||
4340 | LAWNDALE | CA | I | R | W | 1 | 1 | N | 19 | 13 | 8 | H | 2006-03-24 |
I have a kitchen that need to be painted, it has like six small cracks and some patched areas that need to be sanded and primed | |||||||||||||
4339 | SAINT CHARLES | MD | I | R | W | 0 | 0 | N | 53 | 41 | 9 | H | 2006-03-23 |
No ceilings. Family room, study, morning room. Three to four days to paint. New construction. House will be empty of furniture. | |||||||||||||
4338 | ELLICOTT CITY | MD | I | R | B | 1 | 1 | Y | 14 | 10 | 8 | M | 2006-03-23 |
Need to paint 2 bedrooms 14x10 11x11 height is 8feet | |||||||||||||
4337 | BALTIMORE | MD | I | R | B | 0 | 1 | Y | 0 | 0 | 0 | M | 2006-03-23 |
Need to paint my living room and dining room combo along with stair well and hall way. For accurate length and width Avaiable for Saturday the 25th measurement. Not sure width and length and height | |||||||||||||
4336 | LITTLETON | CO | I | R | B | 30 | 25 | Y | 999 | 999 | 99 | H | 2006-03-23 |
4000 Sq Ft home interior painting | |||||||||||||
4335 | BENTONVILLE | AR | I | R | W | 0 | 0 | N | 15 | 15 | 10 | H | 2006-03-22 |
New home-moved into in Dec.--want to change color from dark brown color in one bedroom and attached bathroom to a lighter green. Walls and ceiling need paint. Trim and baseboards are pale yellow. | |||||||||||||
4334 | EL TORO | CA | I | R | W | 0 | 0 | N | 9 | 10 | 8 | M | 2006-03-22 |
Small kitchen in a townhouse needs walls and ceiling repainted, but no cabinets. Less than 300 square feet space. | |||||||||||||
4333 | LOTHIAN | MD | I | R | B | 6 | 7 | N | 16 | 22 | 19 | H | 2006-03-22 |
2 rooms need to be painted. Family room with above measurements (total 3 walls, 2 colors plus fireplace from floor to ceiling, no doors, 6 of 7 windows), and front foyer 12X16X19 including stairway (different color than family room, spindles on stairway, | |||||||||||||
4332 | INDIANAPOLIS | IN | E | R | B | 2 | 10 | Y | 50 | 70 | 10 | M | 2006-03-22 |
I have 45 condo units to paint. I have detailed information bid sheets available by fax or email. Project to start Mid may and last 3-4 months depending on weather | |||||||||||||
4331 | FLORHAM PARK | NJ | E | R | T | 0 | 0 | N | 0 | 0 | 0 | M | 2006-03-22 |
I have 4 new fiberglass columns (primed) 18' x 18" wide (round) and some new fascia boards capping a box beam that need painting. Fascia boards are @ 18"H x 12"D 60'L (total) and require painting on front, bottom and back. Some minor priming needed on fas | |||||||||||||
4330 | ALEXANDRIA | VA | E | R | T | 0 | 0 | Y | 12 | 30 | 50 | M | 2006-03-22 |
Need paint on the roof trim only. Townhouse in Kingstowne. | |||||||||||||
4329 | LEXINGTON | KY | I | R | B | 6 | 11 | Y | 178 | 164 | 8 | H | 2006-03-22 |
4328 | HOUSTON | TX | E | C | W | 0 | 0 | N | 740 | 260 | 36 | M | 2006-03-21 |
The job is exterior repainting 2storey building approximately 37,000 sq ft | |||||||||||||
4327 | STAFFORD | VA | I | R | B | 3 | 8 | Y | 0 | 0 | 0 | M | 2006-03-21 |
I have a town home approx 2200 sq foot of space 95 percent finished. I would like three and one half baths, two master bedrooms, kitchen, family room, office, living room, dinning area painted. Primary master bath has vaulted ceiling at twelve ft high o | |||||||||||||
4326 | SAN DIEGO | CA | E | R | B | 1 | 0 | Y | 46 | 52 | 12 | H | 2006-03-21 |
front length 51ft 1in. right side 46ft 7 in. left side 46ft 2 inch. back 50ft. stucco exterior. 200ft of fascia with 2 foot soffits | |||||||||||||
4325 | SAN ANTONIO | TX | E | R | B | 3 | 17 | Y | 41 | 39 | 20 | M | 2006-03-21 |
One side - brick (paint door and trim) two sides - 1/2 brick one side - no brick (double doors) Use paint that does not allow bleeding | |||||||||||||
4324 | CANYON COUNTRY | CA | E | R | B | 2 | 17 | Y | 21 | 38 | 26 | M | 2006-03-21 |
1825 sq ft 2 story home. Cement siding and stucco with wood trim porch | |||||||||||||
4323 | PHILA | PA | I | R | B | 7 | 5 | Y | 20 | 60 | 8 | M | 2006-03-21 |
1744 Sqft walls 715 Sqft Ceiling 2459 Sqft wallpaper removal | |||||||||||||
4322 | ALPHARETTA | GA | I | R | B | 0 | 0 | N | 0 | 0 | 0 | L | 2006-03-21 |
I need some finishing touches that my uncle left. some walls need some repaint and 2 bathrooms painted with a spanish texture on one. One bedroom and a closet | |||||||||||||
4320 | FRAMINGHAM | MA | I | R | B | 6 | 4 | Y | 14 | 17 | 8 | M | 2006-03-21 |
I am looking for bids to paint two rooms in my condo to get it ready to sell. Room 1 is 14x17 with one large window and 3 doors. Room two is 11x15 with 2 windows, one door and two sliding closet doors. Also to paint trim and one window in kitchen. | |||||||||||||
4319 | RANCHO MIRAGE | CA | I | R | B | 7 | 10 | Y | 60 | 30 | 8 | H | 2006-03-21 |
1500 sq. foot condo at Mission Hills. Acoustic Ceiling scraping, wall paper removal in two bathrooms and paint throughout. | |||||||||||||
4318 | CAPE CORAL | FL | I | R | W | 0 | 0 | N | 32 | 50 | 9 | M | 2006-03-21 |
brand new 2600 SF home. Will have coat of white paint already done. Would like to paint interior walls a light beige - same color throughout. Do not need baseboards,doors, ceilings or trim painted. 2 story home. Do not need 2 bedrooms done or master close | |||||||||||||
4317 | CAPE CORAL | FL | I | R | W | 0 | 0 | N | 32 | 50 | 9 | H | 2006-03-21 |
brand new 2600 SF home. Will have coat of white paint already done. Would like to paint interior walls a light beige - same color throughout. Do not need baseboards,doors or trim painted. 2 story home. Do not need 2 bedrooms done or master closet (remove | |||||||||||||
4316 | GRAPEVINE | TX | I | R | B | 10 | 10 | Y | 50 | 34 | 10 | H | 2006-03-21 |
1700 sq feet house, entire interior needs painting. 3 x rooms need wallpaper to be removed (not all walls). More details to follow. | |||||||||||||
4315 | CITY OF INDUSTRY | CA | I | R | B | 5 | 5 | Y | 25 | 50 | 8 | M | 2006-03-20 |
1,136 SF,two story condo with 3 bedrooms, 2 bathrooms, need to paint walls and ceiling | |||||||||||||
4314 | WEST MONROE | NY | E | R | W | 2 | 12 | N | 35 | 44 | 24 | H | 2006-03-20 |
Farm house with asbestos siding. Main house is 27x44 two story. single story addition is 25x24. Estimate for walls only. house has vinyl windows,wrapped trim,facia and overhangs | |||||||||||||
4313 | STAMFORD | CT | I | R | B | 3 | 12 | N | 11 | 18 | 10 | M | 2006-03-20 |
3 rooms - 2 are 11x18, 1 is 11x7. Also, back entranceway and stair case (15 stairs high, 12 ft ceilings). all rooms different colors, ceiling needs work as well. some significant cracks in ceiling and walls, all coated with white primer currently. | |||||||||||||
4312 | GLASS | VA | I | R | W | 0 | 0 | N | 12 | 12 | 0 | M | 2006-03-20 |
I need to paint the ceiling in my den about a 12x12 room and finish my upstairs hallway which includes a stairwell ceiling I have paint that was purchased at WalMart for reference | |||||||||||||
4311 | POTTSTOWN | PA | I | R | B | 5 | 3 | Y | 22 | 25 | 7 | M | 2006-03-19 |
finished basement, including small bathroom, needs paint on the walls and the trim. Also need smoke marks from burning candles (at the top of the walls near the ceiling) properly treated. Would like project done in April or early May at the latest. | |||||||||||||
4310 | SAINT LOUIS | MO | E | R | T | 0 | 0 | Y | 0 | 0 | 0 | M | 2006-03-18 |
wire brush and paint 235 feet of chain link fence posts and support tubing, not wire mesh, it is vinyl. | |||||||||||||
4309 | SNELL | VA | E | R | B | 0 | 0 | Y | 50 | 30 | 20 | M | 2006-03-18 |
Contemporary Stucco. Varing roof lines and heights. | |||||||||||||
4308 | ALTON | TX | E | C | W | 8 | 6 | Y | 50 | 50 | 20 | H | 2006-03-17 |
4307 | ARIZONA BOYS RANCH | AZ | I | R | W | 0 | 0 | N | 0 | 0 | 0 | M | 2006-03-17 |
New home, no furniture. Would like the interior walls to be painted prior to move in. Something that cleans easily such as eggshell. Here is the home model. I do not have dimensions. http://www.homelifecommunities.com/arizona/pdf/Remington.pdf | |||||||||||||
4306 | ARIZONA BOYS RANCH | AZ | I | R | W | 0 | 0 | Y | 0 | 0 | 0 | M | 2006-03-17 |
New home, no furniture. Would like the interior walls to be painted prior to move in. Something that cleans easily such as eggshell. Here is the home model. I do not have dimensions. http://www.homelifecommunities.com/arizona/pdf/Remington.pdf | |||||||||||||
4305 | RIDGEWAY | CT | I | R | B | 3 | 5 | N | 300 | 400 | 20 | M | 2006-03-17 |
1 bedroom and 1 1/2 bathroom townhouse. 2 floors. High ceiling in the kitchen and staircase. Painting and fixing the wear and tear cracks. | |||||||||||||
4304 | LEWISVILLE | TX | I | R | W | 0 | 0 | N | 10 | 12 | 9 | M | 2006-03-17 |
Basically a square room with one small inset area for a dresser to go. Each wall is to be a different color. This will be our babies room. I have the paint. Behr paint. No ceilings... no baseboards. Just walls that have an orange peel texture. | |||||||||||||
4303 | SUN CITY | AZ | I | R | W | 0 | 0 | N | 60 | 30 | 8 | M | 2006-03-16 |
A new home of 3000 SF - the closet do not have to be painted, nor the trim/ceilings. Basically one color-throughout. Not sure of the dimensions of the rooms. | |||||||||||||
4302 | SUN CITY | AZ | I | R | W | 0 | 0 | N | 0 | 0 | 0 | M | 2006-03-16 |
A new home of 3000 SF - the closet do not have to be painted, nor the trim/ceilings. Basically one color-throughout. | |||||||||||||
4301 | KEARNEY | NE | I | R | W | 15 | 20 | N | 50 | 50 | 10 | H | 2006-03-16 |
2,500 sqft home have the paint. Strait one color paint. Two coats of good paint. | |||||||||||||
4300 | LAKEHILLS | TX | I | R | B | 20 | 20 | Y | 50 | 40 | 40 | M | 2006-03-16 |
all interior trim and casings will be varnished using sanding sealer,stain and two coats of varnish.same process for all doors and cabinets.overall interior approx.2860 sq ft. | |||||||||||||
4299 | LAKEHILLS | TX | I | R | B | 20 | 20 | Y | 50 | 40 | 40 | M | 2006-03-16 |
all interior trim and casings will be varnished using sanding sealer,stain and two coats of varnish.same process for all doors and cabinets.overall interior approx.28060 sq ft. | |||||||||||||
4298 | LAS VEGAS | NV | I | R | B | 5 | 6 | N | 20 | 20 | 20 | M | 2006-03-16 |
1400 square foot home,three bedrooms, two baths | |||||||||||||
4297 | CATALPA | VA | E | R | B | 1 | 25 | Y | 50 | 60 | 22 | H | 2006-03-16 |
Exterior clap board siding in decent shape has been scraped once - needs pressure wash light scraping and sanding - primer and 2 coats of paint | |||||||||||||
4295 | AKRON | OH | E | R | B | 2 | 19 | Y | 0 | 0 | 0 | M | 2006-03-15 |
We need someone to paint the exterior of our home this spring. The house is 3 stories but the first floor is brick. The windows are capped in vinyl & do not need painted. | |||||||||||||
4294 | CARPENTERSVILLE | IL | I | R | W | 0 | 0 | N | 0 | 0 | 0 | H | 2006-03-15 |
2800 SQ FT, 12 ROOMS, 4 BED, 2 1/2 BATH, OFFICE, LR, DR, FORMAL LR, KIT, FOYER, HALL WAYS, & LAUNDRY ROOM | |||||||||||||
4293 | SALTON CITY | CA | I | R | W | 0 | 0 | N | 54 | 60 | 10 | M | 2006-03-15 |
New Construction - Salton City - 10' Ceilings Walls and Ceiling - No Trim 2 Color - Ceiling and Walls | |||||||||||||
4292 | CHAPEL HILL | NC | I | R | W | 19 | 9 | N | 60 | 30 | 8 | M | 2006-03-15 |
We want all the rooms in our new townhouse painted before we move in. It is about 1800 square feet. No trim painting required. | |||||||||||||
4291 | PEORIA | AZ | E | R | B | 2 | 17 | Y | 70 | 40 | 10 | H | 2006-03-14 |
I have all of the paint and materials to paint my home I'm looking for a company to prep and paint home Is there any companies willing I have a 2200 sq ft home 3 car garage single level pitch roof | |||||||||||||
4290 | STAUNTON | IL | E | R | B | 3 | 12 | Y | 12 | 35 | 10 | M | 2006-03-14 |
4289 | INDIANAPOLIS | IN | E | R | T | 0 | 4 | Y | 2 | 150 | 25 | M | 2006-03-14 |
Painting window frames on 2nd story ,eaves and soffits. Rest of house is sided, and I can do 1st floor. | |||||||||||||
4288 | LENEXA | KS | I | R | W | 1 | 1 | N | 10 | 10 | 15 | M | 2006-03-14 |
Need vaulted foyer painted. I have paint already, just too high for me. 2 1/2 walls, just want a pricing idea. | |||||||||||||
4287 | NC STATE UNIVERSITY | NC | E | R | B | 2 | 10 | Y | 60 | 30 | 8 | H | 2006-03-14 |
I just bought number 12 rosemary street I am going to need exterior paint asap I am getting estimates this week and will want the work done before the 15th of April single story small house but needs lots of work...Can you go by and have a look at the ext | |||||||||||||
4286 | LAWRENCEVILLE | GA | I | R | W | 6 | 8 | N | 6 | 8 | 10 | M | 2006-03-13 |
I need the living room, family room, kitchen, hallway, master bedroom, spare bedroom, master bath, and spare bath painted. Ceilings are 10ft. Large windows in house. Light prep needed, touch up trim. | |||||||||||||
4285 | CANOGA PARK | CA | E | R | B | 1 | 2 | Y | 30 | 30 | 10 | M | 2006-03-13 |
This is a Guest House. Exterior only | |||||||||||||
4284 | CANOGA PARK | CA | E | R | B | 1 | 8 | Y | 45 | 60 | 10 | M | 2006-03-13 |
4283 | FORT WORTH | TX | I | R | B | 12 | 0 | Y | 52 | 52 | 10 | H | 2006-03-13 |
2674 sq ft home has texured knock down walls, figure 12 doors. All windows are vinyl so their not to be painted. No ceiling painting. Most rooms have 10 ft ceilings except for 3 bathrooms and the master bedroom. | |||||||||||||
4282 | ERIE | CO | E | R | B | 1 | 12 | Y | 0 | 0 | 0 | H | 2006-03-13 |
I don't know the exact length, width, and height of our house, the total sq ft including garage is 2132. The dates we desire are flexible. The house is currently grey and we would like to paint it a chocolate color with white trim and hunter green accen | |||||||||||||
4281 | INDIAN CREEK | IL | I | R | W | 0 | 0 | N | 60 | 65 | 9 | M | 2006-03-12 |
1200sqft 2bdrm apt, painting bedrooms, bathrooms, and living/dining area. No paint for doors, windows, or trim. Floorplan avaiable at http://www.museumgardens.com/apar/apar_mich_expa.html | |||||||||||||
4280 | RALEIGH | NC | E | R | B | 4 | 19 | Y | 30 | 60 | 30 | H | 2006-03-12 |
typical 2 story, 2 car garage colonial Raleigh house built in 1983. | |||||||||||||
4279 | KELLER | TX | I | R | W | 0 | 0 | N | 0 | 0 | 9 | H | 2006-03-11 |
Looking for someone to paint multiple rooms in our new home. Foyer, 2 bathrooms, Kitchen, Dining room, and Family room. We'll supply the paint, do you the rest. | |||||||||||||
4278 | GLENDALE | CA | E | R | B | 3 | 11 | N | 23 | 41 | 12 | M | 2006-03-11 |
Aluminum siding, wooden windows and doors. Needs to be refreshed. | |||||||||||||
4277 | LAKE RIDGE | VA | I | R | B | 12 | 9 | Y | 60 | 30 | 8 | H | 2006-03-11 |
I am in need of a quote for two bedrooms, three bathrooms, kitchen, living room, dining room, upstairs hallway and two stairwells. I also need all trim and windows painted as well as room doors. The kitchen wall needs to be leveled or evened out before pa | |||||||||||||
4276 | STOCKTON | CA | I | R | B | 4 | 5 | N | 0 | 60 | 8 | H | 2006-03-11 |
master bath needs major drywall repairs 4ft area may need to be replaced & taped,5 areas minor patch work,prep prime and paint wall area of 670 sq ft |