6557 Available Projects
From November 3, 2002 to Today
Contractors: please click on Login button above to login and submit bids on these projects.
Column heading buttons: click on to sort by (e.g. click on RC to see all commercial jobs first and residential jobs second, or click on State button to sort by State, etc.).
Column Definitions: ID=Reference Number, IE=Interior/Exterior, RC=Residential/Commercial, P=Paint Walls/Trim/Both, D=# of Doors, Win=# of Windows, OB=Overhang/Baseboard paint Yes/No, W=Width in feet, L=Length in feet, H=Height in feet, Q=Quality Low/Medium/High.
Results Page(s) (100 per page): 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66
ID | Ci | St | IE | RC | P | D | Win | OB | W | L | H | Q | Posted |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Description | |||||||||||||
3335 | ORANGE | CA | I | R | W | 4 | 4 | N | 20 | 45 | 8 | L | 2004-12-31 |
2 Br, 2 Bath Condo, Living room has a pitched cieling starting at 8' upto 10' | |||||||||||||
3334 | KATY | TX | E | R | T | 3 | 7 | Y | 50 | 40 | 10 | M | 2004-12-30 |
rental house needs new paint before it goes back on the market for sale. I live out of town. Need good references. | |||||||||||||
3333 | FORT LAUDERDALE | FL | I | R | B | 8 | 6 | Y | 20 | 25 | 8 | H | 2004-12-28 |
We need three or four rooms painted in the next two or three days. House is unoccupied. Need quality work, done quickly and cleanly | |||||||||||||
3332 | MC KINNEY | TX | I | R | W | 0 | 0 | Y | 60 | 30 | 8 | M | 2004-12-27 |
Need kitchen and formal dining faux finished. Need all of lower level ceiling and living room painted. Paint will be provided. | |||||||||||||
3331 | CORONA | NY | I | R | B | 2 | 1 | Y | 15 | 23 | 8 | H | 2004-12-26 |
3330 | ATL | GA | I | R | B | 0 | 6 | Y | 25 | 25 | 8 | M | 2004-12-21 |
3329 | W CHESTER | PA | I | R | B | 1 | 0 | Y | 6 | 20 | 10 | H | 2004-12-21 |
foyer, upstairs and 2nd floor hallway | |||||||||||||
3328 | CLINTON TOWNSHIP | MI | I | R | B | 0 | 0 | N | 5 | 8 | 6 | M | 2004-12-20 |
First: House built in 1959. Single level ranch. Main bathroom needs wallpaper removed and drywall primed and painted. Wall needing work is waist high to the ceiling. Waist high to the floor is tile. Ceiling is too be painted also but needs mold removal, s | |||||||||||||
3327 | CLINTON TOWNSHIP | MI | I | R | W | 0 | 0 | N | 5 | 8 | 6 | M | 2004-12-20 |
First: House built in 1959. Single level ranch. Main bathroom needs wallpaper removed and drywall primed and painted. Wall needing work is waist high to the ceiling. Waist high to the floor is tile. Ceiling is too be painted also but needs mold removal, s | |||||||||||||
3326 | SHIREMANSTOWN | PA | E | C | B | 3 | 5 | Y | 9 | 50 | 10 | L | 2004-12-18 |
700 sq ft apartment 2 story | |||||||||||||
3325 | PANAMA CITY | FL | E | R | B | 0 | 1 | Y | 0 | 0 | 0 | M | 2004-12-17 |
I have about 400 sqft of fence that needs to be repainted it is a 3ft high kind of like a chippendale fence, it does have alot of detail | |||||||||||||
3324 | PANAMA CITY | FL | E | R | B | 0 | 0 | Y | 0 | 0 | 0 | M | 2004-12-17 |
I have about 400 sqft of fence it is 3ft high and is kind of like a chippendale fence has lots of detail work. | |||||||||||||
3322 | DUQUESNE | PA | I | R | B | 8 | 7 | N | 65 | 79 | 8 | M | 2004-12-16 |
Ranch style home with 3 bedrooms, living room, kitchen & bathroom. Plaster walls with cove moulding in living room. I estimate 2296 sq ft of wall space & 1196 sq ft of ceiling | |||||||||||||
3320 | MINNEAPOLIS | MN | I | R | W | 0 | 0 | N | 41 | 72 | 9 | M | 2004-12-14 |
3319 | PHOENIX | AZ | E | R | B | 3 | 5 | Y | 38 | 38 | 8 | M | 2004-12-13 |
3318 | KATY | TX | E | R | B | 3 | 6 | Y | 35 | 47 | 15 | H | 2004-12-12 |
our house is primarily brick with wood trim/window box and wood on peaks. It also has original siding on detached garage (25x25) - as well as a breezway. In addition to the painting, we are also looking for gutter replacements along the front and back of | |||||||||||||
3317 | SULLY STATION | VA | I | R | B | 0 | 5 | Y | 28 | 23 | 8 | H | 2004-12-09 |
Repair minor drywall damage. Prep and paint living room and dining room to include baseboards, crown molding, window trim and celing. Paint to be used will be premium quality Duron paint. | |||||||||||||
3316 | ALPHA | NJ | I | R | W | 0 | 0 | N | 20 | 10 | 10 | H | 2004-12-08 |
The total livable interior of the house is approximately 1800 square feet - - 2 bedrooms, 2 full bathrooms, 2 half bathrooms, family room, living room, kitchen. | |||||||||||||
3315 | CHICAGO | IL | I | R | B | 2 | 17 | N | 90 | 60 | 9 | H | 2004-12-08 |
Moving into new condo and would like the entire place painted. Approximately 1300 sq. feet includes 2 bedrooms, sunroom, 1 bath, living room, dining room, kitchen and hallways | |||||||||||||
3314 | DAVIE | FL | E | C | B | 14 | 6 | N | 200 | 450 | 20 | M | 2004-12-08 |
office building with no prep work and no pressure cleaning but needs a good paint job. | |||||||||||||
3313 | PARAMUS | NJ | I | C | T | 0 | 0 | Y | 0 | 0 | 0 | M | 2004-12-07 |
please give me a price to stain and finish 9000' of 6" crown molding and 7000' of 6" base molding | |||||||||||||
3312 | ROSE HILL | TX | I | R | B | 7 | 12 | Y | 60 | 30 | 9 | M | 2004-12-07 |
1300 sq ft., poorly patched paint | |||||||||||||
3311 | BROADVIEW HEIGHTS | OH | I | R | W | 7 | 8 | N | 60 | 80 | 12 | M | 2004-12-07 |
townhome living room is 12x19 dining room 9x11 master bedroom 12x18 2nd bedroom 10x11 2 1/2 bathrooms and hallways need painted too total square foot is 1288 start date is an estimate | |||||||||||||
3310 | FAIRVIEW | TX | I | C | B | 15 | 10 | Y | 999 | 999 | 99 | M | 2004-12-07 |
THIS IS A MEDICAL OFFICE BUILDING THAT IS APROX 2,700 SQF. I JUST NEED A QUICK ESTIMATE FOR A OFFICE THIS SIZE. THANK YOU | |||||||||||||
3308 | MAYWOOD PARK | OR | I | R | W | 0 | 0 | N | 15 | 12 | 9 | H | 2004-12-02 |
kitchen cabinets | |||||||||||||
3307 | MAYWOOD PARK | OR | I | R | W | 0 | 0 | N | 15 | 12 | 9 | H | 2004-12-02 |
3306 | CARL FISHER | FL | I | R | B | 6 | 0 | Y | 40 | 30 | 8 | H | 2004-11-30 |
3305 | LINDEN | NJ | I | R | B | 0 | 1 | Y | 6 | 30 | 9 | M | 2004-11-30 |
my entrance hallway with stairs need to be painted around rug areas. High ceilings | |||||||||||||
3304 | DRIVER | VA | I | R | W | 0 | 0 | N | 46 | 61 | 24 | H | 2004-11-29 |
Need to remove wallpaper in kitchen/breakfast nook. Paint kitchen, breakfast nook, family room, stairwell, 2 story foyer. Lots of open spaces. No ceilings painted. | |||||||||||||
3303 | SPARTANBURG | SC | I | R | B | 3 | 4 | Y | 1 | 1 | 8 | H | 2004-11-28 |
Living room, hallway, 1 bedroom and 1 bathroom. Depending on cost, we may want to add 2 additional bedrooms | |||||||||||||
3302 | BROOKLYN | NY | I | R | B | 5 | 0 | N | 12 | 14 | 10 | L | 2004-11-27 |
3301 | ORE VALLEY | PA | E | R | B | 3 | 13 | Y | 20 | 40 | 30 | H | 2004-11-25 |
Corner home painted brick with painted wood trim , expect extra nice job in historical district | |||||||||||||
3300 | FONTANA | CA | I | R | W | 0 | 0 | Y | 0 | 0 | 0 | M | 2004-11-25 |
Currently my walls are painted flat white. I would like to have all walls except kitchen and bathrooms with acrylic eggshell. My house size is 2581 sq ft. | |||||||||||||
3299 | MILFORD | CT | I | R | B | 3 | 5 | N | 999 | 999 | 7 | H | 2004-11-24 |
i have three rooms and a hall way that needs paint going with something simaliar to the paint thats there now ceilings as well | |||||||||||||
3298 | MARINA BAY | MA | I | R | B | 0 | 12 | N | 0 | 0 | 0 | H | 2004-11-23 |
6 rooms 1 hallway all 9' ceilings total approx. 884 sq. ft. of living space | |||||||||||||
3296 | KELLER | TX | I | R | B | 12 | 16 | N | 60 | 30 | 8 | H | 2004-11-22 |
Buying house. Complete interior job including some wallpaper removal. Living room 18x17, dining room 12x11, kitchen 13x13 wallpaper removal, breakfast area 15x7 wallpaper removal, gameroom 15x12, utility 9x7, bedroom 1 16x14, bedroom 2 12x11 will need p | |||||||||||||
3295 | HOUSTON | TX | E | R | W | 2 | 8 | N | 45 | 50 | 12 | M | 2004-11-22 |
3294 | DELRAY BEACH | FL | E | R | B | 3 | 10 | Y | 30 | 60 | 10 | M | 2004-11-21 |
pressure wash, replace 10 ft. section facia board,6 shutters, patch 50 storm cover bolt holes,single coat good paint. | |||||||||||||
3291 | BEDFORD | TX | E | R | B | 2 | 11 | Y | 60 | 48 | 12 | M | 2004-11-20 |
House is L shaped. Width & Length provided are the longest. The shorter width is about 30', and the shorter length is about 26'. | |||||||||||||
3290 | MIDWAY | KY | I | R | B | 2 | 3 | Y | 15 | 20 | 8 | M | 2004-11-19 |
3289 | ANTIOCH | IL | I | R | W | 0 | 0 | N | 0 | 0 | 0 | H | 2004-11-17 |
1 year old home needs interior painted. 2300 square ft home, 3 bedrooms up, new bedroom and playroom in basement. No flat paint, prefer your color wheel. Cathedral ceiling in living room. KLM built, Pinehurst model. | |||||||||||||
3288 | CUMMING | GA | E | R | T | 0 | 0 | Y | 150 | 150 | 0 | H | 2004-11-16 |
Pulte Home, 2 story, we want the gutters painted with an oil, and the trim treated before being painted to kill any mold. Thank you | |||||||||||||
3287 | MINNEAPOLIS | MN | E | R | W | 0 | 0 | N | 40 | 25 | 20 | M | 2004-11-16 |
I started to paint my house this summer but couldn't finish it. 2/4 outer walls of the house need to be painted (the 2 walls are probably around 1200 sqft). This is a two story stucco duplex with basically flat walls (i.e. no complex angles). The paint | |||||||||||||
3286 | MARIETTA | GA | I | R | W | 0 | 0 | N | 36 | 36 | 8 | L | 2004-11-15 |
Small 2 bedroom townhouse total 1400 square feet. Need to paint living/dining area hallway/steps, 2 bedrooms (not incl closets), and kitchen. All flat white. | |||||||||||||
3285 | MESQUITE | TX | I | R | T | 0 | 0 | N | 1 | 6 | 0 | M | 2004-11-15 |
I have a place on my ceiling where top floor shower stall leaked and csused tape to come unstuck. Needs some texturizing too. Sheet rock seems fine. | |||||||||||||
3284 | WALNUTPORT | PA | I | R | B | 3 | 30 | N | 0 | 0 | 0 | H | 2004-11-14 |
whole house interior paint | |||||||||||||
3283 | BRENT | FL | I | R | W | 7 | 9 | N | 22 | 50 | 8 | M | 2004-11-12 |
include ceilings with primer | |||||||||||||
3282 | GIG HARBOR | WA | I | R | W | 2 | 4 | N | 24 | 20 | 12 | H | 2004-11-12 |
Looking to paint great room of manufactured home. Room is tape and textured. Would like a colorwash paint treatment that would make the room have a more swedish modern feel. (Think IKEA)12' center height with 6' outside walls. Not certain but might like t | |||||||||||||
3281 | NEW EGYPT | NJ | I | R | B | 0 | 0 | Y | 15 | 24 | 16 | M | 2004-11-11 |
3280 | FOX RV VLY GN | IL | I | R | B | 6 | 8 | Y | 60 | 30 | 8 | M | 2004-11-11 |
3000sq.ft two story colonial,repaint areas needed.Remove wallpaper and paint as needed. | |||||||||||||
3279 | KENDALL | FL | I | R | B | 10 | 10 | Y | 60 | 30 | 8 | M | 2004-11-10 |
3278 | GARDENA | CA | E | R | B | 4 | 12 | Y | 0 | 0 | 0 | H | 2004-11-10 |
Stucco, 3 br, 2ba, attached garage. 1 story 1500 sq ft w/brick facade in front | |||||||||||||
3277 | FAYETTEVILLE | NC | E | R | B | 0 | 16 | Y | 60 | 30 | 16 | M | 2004-11-10 |
i calculated the ht to be 16 ft because my house is a 2 story. | |||||||||||||
3276 | HOUSTON | TX | I | R | B | 1 | 2 | Y | 16 | 14 | 8 | M | 2004-11-09 |
I have 3 interior rooms and a hallway that need to be painted. | |||||||||||||
3275 | MONROE | CT | I | R | B | 10 | 15 | Y | 10 | 12 | 7 | M | 2004-11-09 |
full interior of 3 floor home. new walls everywhere that are taped and primed. Home consists of 8x10 kithcen, 10x12 living, 10x12 dining, 3 10x10 bedrooms, 1 15x20 common room, 2 8x10 bathrooms, 2 hallways, 2 stairwells - all walls and trim. Rough esti | |||||||||||||
3274 | ATL | GA | I | R | W | 0 | 0 | N | 15 | 22 | 9 | M | 2004-11-04 |
I am looking for someone who can repaint the living room in a new condo...the touch up paint I used does not match the wall paint. I will supply paint. | |||||||||||||
3273 | HILL COUNTRY VILLAGE | TX | E | R | T | 0 | 0 | Y | 1 | 320 | 14 | H | 2004-11-04 |
eaves/overhangs entry doorway/ceiling some board replacements | |||||||||||||
3272 | ROANOKE | TX | I | R | W | 5 | 6 | N | 50 | 40 | 8 | M | 2004-11-02 |
4 rooms - master bed 19'2" X 14' 3 1/2" walls only master bath 8'7" X 8' 9 1/2" study 12'8" X 12'7" powder bath 10'1" X 5' 1/2" no ceilings to paint but FYI - 8' ceilings in study and baths, and 10' sloped ceiling in maste | |||||||||||||
3271 | NAPLES | FL | I | C | B | 12 | 18 | Y | 80 | 125 | 9 | M | 2004-11-01 |
Condominium Clubhouse including meeting room, card room, kitchen, office, & storage room. | |||||||||||||
3270 | GBG | PA | E | R | W | 1 | 8 | N | 48 | 48 | 10 | H | 2004-10-31 |
This is an exterior paint job. I do not have a square foot number however, it is a very small ranch home, maybe about 2,000 square feet of exterior paint surface. It has newer vinyl siding and would therefor need 2 coats of primer I would think. | |||||||||||||
3269 | DALLAS | GA | I | R | W | 0 | 0 | N | 12 | 12 | 8 | M | 2004-10-30 |
I need all walls in house painted. Plus basement. | |||||||||||||
3268 | LITHOPOLIS | OH | I | R | W | 0 | 2 | N | 16 | 30 | 10 | M | 2004-10-28 |
Family room approx 12x12 and upstairs hallway approx 18x4 | |||||||||||||
3267 | WADSWORTH | OH | I | R | W | 3 | 3 | N | 12 | 24 | 10 | H | 2004-10-28 |
Kitchen/Dinette area of newly constructed home. Walls only. NO ceiling and no painted trim as everything is all oak. 3 archways. | |||||||||||||
3266 | TAMPA | FL | I | R | B | 8 | 5 | Y | 107 | 95 | 84 | M | 2004-10-28 |
Repaint of 4 small bedrooms 3 are 11X11 1 is 12X16 , Dining Room 10X13, Living Room 14X16, Family Room 16X18, Den 10X11, and 3 bathrooms | |||||||||||||
3264 | EDMOND | OK | I | R | B | 12 | 7 | Y | 12 | 12 | 8 | M | 2004-10-27 |
Approx 1700sf LR 15'T 14X14 2 bdr 12X12 mast bdr 15X15, sm inset, sm bath tiled 2nd bath 6X10 tub tiled laundry 10X6 hall 25 kit/din 12x26 | |||||||||||||
3263 | DURHAM | NC | E | R | B | 2 | 10 | Y | 60 | 30 | 8 | H | 2004-10-27 |
Home is under 1500 sq ft with a 2 car garage attached. | |||||||||||||
3262 | BEGGS | OK | E | R | B | 4 | 10 | Y | 30 | 65 | 9 | H | 2004-10-27 |
Need exterior scraped, caulked and painted. House is mostly brick in front, but 1/2 in back. Interior also needs painted. 2 BR, LR, Kitchen, Dining Room, Vaulted ceiling in LR area needs paint also | |||||||||||||
3260 | ARVADA | CO | E | R | B | 2 | 10 | N | 60 | 30 | 20 | H | 2004-10-27 |
1800 square foot, bi-level home, all wood | |||||||||||||
3259 | LEWISVILLE | TX | I | R | W | 0 | 0 | Y | 0 | 0 | 0 | H | 2004-10-27 |
House is 1900sq ft. Need someone to paint living room, hallway, 2 bedrooms approximatley(12x12)each. I will purchase paint. Would like to have it done as soon as possible. | |||||||||||||
3258 | ALPHARETTA | GA | I | R | B | 19 | 14 | Y | 30 | 60 | 8 | M | 2004-10-27 |
Vacant House. Vaulted ceilings in GR. Want to paint & seal floor in 2 car garage and mud room. | |||||||||||||
3257 | TAMPA | FL | I | R | B | 0 | 0 | Y | 0 | 0 | 50 | M | 2004-10-26 |
I have ceiling that needs to be painted, maybe 50 ft high over pews in a church. | |||||||||||||
3255 | GIBSONTON | FL | I | R | W | 10 | 10 | N | 300 | 10 | 8 | L | 2004-10-24 |
Brand new 2818 sq ft house want just walls in majority of house painted the same color before we move in. If you want to see the floor plan-- www.maronda.com the Baybury model Unsure of exact closing date, but should be at the end of November | |||||||||||||
3254 | JACKSONVILLE | FL | I | C | B | 24 | 0 | Y | 0 | 360 | 8 | L | 2004-10-24 |
new work3 coats | |||||||||||||
3253 | RUTHERFORD | NJ | I | R | W | 0 | 3 | N | 26 | 30 | 8 | M | 2004-10-23 |
Living room, hallway, and stairs | |||||||||||||
3251 | ESMOND | RI | E | C | W | 2 | 11 | Y | 40 | 70 | 12 | H | 2004-10-22 |
roughly 4,000 square feet | |||||||||||||
3250 | BALCH SPRINGS | TX | I | C | W | 0 | 0 | Y | 8 | 16 | 50 | M | 2004-10-21 |
Need contractor to submit bid for taping and bedding and painting a water damaged area of ceiling that will require scaffolding approximately 50 to 75 feet high. There is also an area approximately 6 ft wide by 50ft tall that will have to be taped, bedded | |||||||||||||
3249 | NAPLES | FL | I | R | B | 6 | 4 | Y | 41 | 57 | 8 | M | 2004-10-19 |
2 bedrooms, living room and kitchen | |||||||||||||
3248 | BLOOMFIELD HILLS | MI | E | C | W | 0 | 0 | N | 30 | 240 | 12 | H | 2004-10-18 |
30 feet wide 240 feet long 12 feet high.. use sherwin-william duration brand.maybe just the roof for now..roof is approx.3840sq.ft. | |||||||||||||
3247 | DETROIT | MI | I | R | B | 4 | 11 | Y | 128 | 96 | 36 | M | 2004-10-18 |
3246 | MARIETTA | GA | I | R | W | 2 | 2 | Y | 11 | 11 | 8 | M | 2004-10-18 |
two 11x11 bedrooms 25yr old house original drywaller used nail and glue Wish to rescrew,mud and paint 1 coat same as existing in one room ceiling is dropped must reattach | |||||||||||||
3244 | MIAMI | FL | I | R | B | 4 | 12 | Y | 40 | 45 | 8 | M | 2004-10-18 |
House is 1800sq ft All the ceiling,walls,trim, 3 closets and crown molding will need to be painted. The molding and 4 doors will need oil based paint all other paint will be a 1 coat semi gloss. In your estimate please include the labor and material charg | |||||||||||||
3243 | PHOENIX | AZ | E | R | B | 3 | 7 | Y | 38 | 40 | 8 | M | 2004-10-17 |
3242 | UNION CITY | CA | I | R | B | 3 | 0 | Y | 60 | 30 | 8 | M | 2004-10-16 |
house is 1500sq ft | |||||||||||||
3241 | MONT VERNON | NH | I | R | B | 26 | 20 | Y | 257 | 347 | 8 | M | 2004-10-14 |
Project is interior of vacant 3 floor house for sale. Int walls (Linen Wht), some ceilings (linen Wht), all trim (Wht). 9 rooms (Liv, Din, Fam, Kit/Din, Laundry, 4 Beds), 3.5 baths, Foyer, 2 stairwells. 4 rooms current deep color, require primer. | |||||||||||||
3240 | MONT VERNON | NH | I | R | B | 26 | 20 | Y | 257 | 347 | 8 | H | 2004-10-14 |
Project is interior of vacant 3 floor house for sale. Int walls (Linen Wht), some ceilings (linen Wht), all trim (Wht). 9 rooms (Liv, Din, Fam, Kit/Din, Laundry, 4 Beds), 3.5 baths, Foyer, 2 stairwells. 4 rooms current deep color, require primer. | |||||||||||||
3239 | CO SPGS | CO | E | R | W | 4 | 8 | Y | 1 | 50 | 16 | M | 2004-10-14 |
front of split level four plex, only right now. Rest of building later in spring. 2902 Straus | |||||||||||||
3238 | ARLINGTON | TX | E | R | B | 1 | 0 | Y | 33 | 45 | 10 | M | 2004-10-13 |
Windows will not need painting. | |||||||||||||
3237 | FORT LAUDERDALE | FL | I | R | W | 0 | 0 | N | 0 | 0 | 0 | H | 2004-10-13 |
Walls and ceiling are currently white. Ceilings are average height. There will no furniture in the condo at the time of painting. We would like color on: Living Room: 13 X 23 Bedroom: 14 X 12 Bedroom 2: 11 X 12 Small Hallway: Not sure of measurement | |||||||||||||
3236 | SHELBY TOWNSHIP | MI | I | R | W | 0 | 0 | N | 10 | 10 | 8 | H | 2004-10-13 |
Living Rm. 10'x12', 2 Bed Rms. 10'x10' Bathroom 5'x9' Kithchen 11'x11'....al new drywall, we need a good primer sealer and 2 coats of semi gloss paint for the walls and flat latex for the celings. No paint forthe baseboards, windows or the doors. | |||||||||||||
3235 | CASSELBERRY | FL | I | R | B | 3 | 4 | Y | 60 | 30 | 8 | H | 2004-10-11 |
3 bed room house. not painting the cielling, but 6 walls need wll paper removed also painting kitchen cabinets and 2 bathrooms, laundry room | |||||||||||||
3234 | LARGO | FL | I | R | W | 6 | 12 | N | 0 | 0 | 0 | M | 2004-10-11 |
This is a townhouse that is being built and we are closing on November 24th 2004. We want to paint the interior before we move in. The ceilings are 8ft Ceilings except for the upstairs they are vaulted but I'm not sure how high they are. The townhouse | |||||||||||||
3233 | LARGO | FL | I | R | W | 6 | 12 | N | 0 | 0 | 0 | M | 2004-10-11 |
This is a townhouse that is being built and we are closing on November 24th 2004. We want to paint the interior before we move in. The ceilings are 8ft Ceilings except for the upstairs they are vaulted but I'm not sure how high they are. The townhouse | |||||||||||||
3232 | LARGO | FL | I | R | W | 6 | 12 | N | 0 | 0 | 0 | M | 2004-10-11 |
This is a townhouse that is being built and we are closing on November 24th 2004. We want to paint the interior before we move in. The ceilings are 8ft Ceilings except for the upstairs they are vaulted but I'm not sure how high they are. The townhouse | |||||||||||||
3231 | LARGO | FL | I | R | W | 6 | 12 | N | 0 | 0 | 0 | M | 2004-10-11 |
This is a townhouse that is being built and we are closing on November 24th 2004. We want to paint the interior before we move in. The ceilings are 8ft Ceilings except for the upstairs they are vaulted but I'm not sure how high they are. The townhouse | |||||||||||||
3230 | LARGO | FL | I | R | W | 6 | 12 | N | 0 | 0 | 0 | M | 2004-10-11 |
This is a townhouse that is being built and we are closing on November 24th 2004. We want to paint the interior before we move in. The ceilings are 8ft Ceilings except for the upstairs they are vaulted but I'm not sure how high they are. The townhouse | |||||||||||||
3227 | SANTA CLARA | CA | I | R | B | 0 | 0 | Y | 0 | 0 | 0 | M | 2004-10-07 |
2b/1.5bath Townhome - need popcorn ceilings scraped and retextured. Living and loft bedroom share same ceiling, 2 hallways (up/down), and guest bdr. Approx. 1150 sq. feet. Basic texture to match walls after popcorn removed. | |||||||||||||
3226 | WILLIAMSBURG | VA | E | R | T | 2 | 0 | N | 10 | 10 | 10 | H | 2004-10-07 |
1 entry door 1 entry door interior molding 1 front porch(25x5 ft)/railing and posts 1 garage door exterior molding 1 back garage door | |||||||||||||
3225 | CAMPBELL | CA | I | R | W | 2 | 1 | N | 13 | 15 | 9 | H | 2004-10-07 |
3224 | WESLEY CHAPEL | FL | I | R | W | 1 | 1 | N | 12 | 12 | 8 | H | 2004-10-05 |
3223 | FRESNO | CA | E | R | T | 0 | 0 | Y | 30 | 50 | 8 | M | 2004-10-05 |
Area's of chipped and peeling paint on fascia boards along front of dwelling require scrape and paint. |