6557 Available Projects
From November 3, 2002 to Today
Contractors: please click on Login button above to login and submit bids on these projects.
Column heading buttons: click on to sort by (e.g. click on RC to see all commercial jobs first and residential jobs second, or click on State button to sort by State, etc.).
Column Definitions: ID=Reference Number, IE=Interior/Exterior, RC=Residential/Commercial, P=Paint Walls/Trim/Both, D=# of Doors, Win=# of Windows, OB=Overhang/Baseboard paint Yes/No, W=Width in feet, L=Length in feet, H=Height in feet, Q=Quality Low/Medium/High.
Results Page(s) (100 per page): 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66
ID | Ci | St | IE | RC | P | D | Win | OB | W | L | H | Q | Posted |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Description | |||||||||||||
2047 | GULF GATE BRANCH | FL | E | R | T | 2 | 0 | Y | 3 | 1 | 6 | M | 2003-12-17 |
Need new steel front door painted and trim around it inside and out. Also need new 15 lite french doors (one set)-back of house painted inside and out, trim as well. | |||||||||||||
2046 | GULF GATE BRANCH | FL | E | R | T | 2 | 0 | Y | 3 | 6 | 6 | H | 2003-12-17 |
Need new steel front door painted and trim around it inside and out. Also need new 15 lite french doors (one set)-back of house painted inside and out, trim as well. | |||||||||||||
2045 | CLEVELAND | OH | E | R | B | 0 | 16 | Y | 30 | 20 | 2 | H | 2003-12-16 |
2.5 story dutch colonial. narrow lap siding on lower 2/3rds of house. Shake shingles on upper 3rd. I do not believe there is an overhang. Base color and 1 trim color. House will need scraping. Only trim around windows needs painted. | |||||||||||||
2044 | ROCKVILLE | MD | I | R | B | 13 | 10 | Y | 20 | 30 | 8 | H | 2003-12-14 |
about 1200 square feet of home. regular 8 ft. ceilings on two separate floors. kitchen, dining, living and 3 bedrooms, 2 baths. | |||||||||||||
2043 | NEW YORK | NY | E | R | B | 3 | 4 | Y | 30 | 4 | 7 | L | 2003-12-14 |
ghfg | |||||||||||||
2042 | NEW YORK | NY | E | R | B | 3 | 4 | Y | 30 | 4 | 7 | L | 2003-12-14 |
ghfg | |||||||||||||
2041 | SOUTH PLAINFIELD | NJ | I | R | B | 8 | 5 | Y | 68 | 77 | 68 | H | 2003-12-12 |
Total Living Area length width sq feet living 20 12 240 dining 12 10 120 1bed 14 13 182 2 bed 10 10 100 3 bed 10 13 130 kitchen 11 10 110 | |||||||||||||
2040 | FLORISSANT | MO | I | R | B | 4 | 4 | Y | 20 | 20 | 12 | M | 2003-12-11 |
I need painting done before the holiday. I have a great room and kitchen with vaulted ceilings that need painting. I also need the hallway and 1 bedroom painted. | |||||||||||||
2039 | ANTHONY | IN | I | R | W | 0 | 0 | N | 64 | 55 | 10 | M | 2003-12-11 |
2 bedrooms, one 9'x10', one 10'x 11'. 1 living room 14'x12'. 1 dinning room 10'x10'. Kitchen 8'x 12'. 1 Hallway 8'x 4'. 1 small bathroom 5'x 8'. No trim, window, or door painting. Paint walls and ceilings in all rooms except kitchen. In Kitchen paint | |||||||||||||
2038 | HAZELWOOD | WA | I | R | B | 2 | 4 | Y | 15 | 11 | 12 | M | 2003-12-11 |
2037 | HAZELWOOD | WA | I | R | W | 2 | 5 | Y | 15 | 11 | 12 | M | 2003-12-11 |
2036 | FORT WORTH | TX | I | R | W | 2 | 3 | N | 14 | 20 | 15 | M | 2003-12-10 |
I am looking for the faux brick and plaster look...the area is roughly 600 sf (with vaulted ceilings) | |||||||||||||
2035 | FORT WORTH | TX | I | R | W | 2 | 3 | N | 14 | 20 | 20 | M | 2003-12-10 |
I am looking for the faux brick and plaster look...the area is roughly 600 sf (with vaulted ceilings) | |||||||||||||
2034 | DEER PARK | TX | I | R | B | 0 | 0 | Y | 22 | 16 | 9 | M | 2003-12-10 |
There is brown siding in the living room. We are wanting to paint over it and do the kitchen cabinets that are the same color. There is a large firplace in the room and a back door with windows takes up much of the other wall. | |||||||||||||
2033 | MANCHESTER | NH | I | R | W | 3 | 1 | N | 20 | 17 | 8 | M | 2003-12-10 |
I needed the interior of my 1800 sq foot home painted, it already has one coat of streaky poorly done painting on it. | |||||||||||||
2032 | FAIRFAX | VA | I | R | B | 0 | 0 | Y | 12 | 12 | 17 | H | 2003-12-10 |
Foyer- high cieling and curved staircase Living Room- open floor plan with 17-20 ft cieling upstairs hallway- overlooks foyer and living room | |||||||||||||
2030 | EAST BERNSTADT | KY | I | R | W | 0 | 0 | N | 20 | 12 | 8 | H | 2003-12-09 |
2029 | SPEEGLEVILLE | TX | E | R | B | 18 | 10 | Y | 50 | 60 | 8 | H | 2003-12-09 |
2028 | SPEEGLEVILLE | TX | E | R | B | 18 | 10 | Y | 40 | 60 | 8 | H | 2003-12-09 |
new house being built, with cabinets to be finished in kitchen and both bathrooms (vanities). Outside to be painted one color outside enamel, inside wall paint on walls, cielings flat wall, another color and enamel on doors, trim and crown molding in livi | |||||||||||||
2027 | EVANSTON | IL | I | R | T | 16 | 15 | Y | 0 | 0 | 0 | H | 2003-12-09 |
All trim throughout apartment. liv rm(23x14, 3 wind,frplc,bookshelf) din rm(16x14,3 wind 1dr)w/crown molding. 3 bedrm (10x12, 15x14, 15x14 7 wind, 8 drs) foyer and hall (8x6, 3x12, 4drs) kit (10x14,1wind 1dr) bath (1wind,2drs) | |||||||||||||
2026 | LIVE OAK | TX | I | R | B | 0 | 0 | Y | 0 | 30 | 12 | M | 2003-12-09 |
2025 | EAST BERNSTADT | KY | I | R | W | 2 | 4 | Y | 20 | 43 | 8 | M | 2003-12-08 |
2024 | MAGNOLIA | TX | E | R | B | 3 | 2 | N | 32 | 54 | 20 | M | 2003-12-08 |
New construction. Large 3 car garage with 3 car carport. Hardy plank. Front of garage is brick - no paint. Requires caulking. Ready to start. | |||||||||||||
2023 | EAST BERNSTADT | KY | I | R | B | 1 | 2 | Y | 12 | 12 | 8 | M | 2003-12-08 |
2022 | EAST BERNSTADT | KY | I | R | B | 1 | 2 | Y | 12 | 12 | 8 | H | 2003-12-08 |
2021 | EAST BERNSTADT | KY | I | R | B | 1 | 2 | Y | 12 | 12 | 8 | M | 2003-12-08 |
2020 | EAST BERNSTADT | KY | I | R | B | 1 | 2 | Y | 12 | 15 | 8 | M | 2003-12-08 |
2019 | CORONA | CA | I | R | B | 1 | 1 | N | 10 | 15 | 9 | M | 2003-12-08 |
2018 | CORONA | CA | I | R | B | 5 | 6 | N | 10 | 15 | 10 | M | 2003-12-08 |
2017 | DARLINGTON | NJ | I | R | B | 3 | 3 | Y | 51 | 42 | 8 | H | 2003-12-08 |
I need the following rooms painted: Bedroom - 9'x 11' Bedroom - 13' x 15' Bathroom - 4' x 6' Rec Room - 16' x 19' Hallway | |||||||||||||
2016 | POWELL | OH | I | R | B | 3 | 1 | N | 14 | 22 | 8 | H | 2003-12-08 |
Refinished half basement. Laundry Room, Storage area. Prime with two coats paint. | |||||||||||||
2015 | RANCHO CALIFORNIA | CA | I | R | B | 3 | 4 | Y | 10 | 10 | 10 | L | 2003-12-08 |
3 bedrooms two approx 10X10X10, 3rd slightly larger. Possible rest of home if offered a good price. Home is in great shape, but I prefer washable enamel pain. It currently has flat paint. Only need one good coat of washable enamel paint in the the thr | |||||||||||||
2014 | JANESVILLE | WI | I | R | W | 1 | 2 | Y | 13 | 19 | 8 | H | 2003-12-08 |
new remodel bedroom ((2) 4'x4' windows and (1) six panel door not to be painted)) (19'x13') with closet (3'x12' with roughed 6' wide door) plus ceiling in both | |||||||||||||
2013 | FORT LEE | NJ | I | R | W | 0 | 0 | N | 3 | 3 | 2 | H | 2003-12-08 |
no stucteral damage but needs skim coat of spackel sand then prime and two painting. | |||||||||||||
2012 | FORT LEE | NJ | I | R | W | 0 | 0 | N | 3 | 3 | 2 | H | 2003-12-08 |
no stucteral damage but needs skim coat of spackel sand then prime and two painting. | |||||||||||||
2011 | FORT LEE | NJ | I | R | W | 0 | 0 | N | 3 | 3 | 2 | H | 2003-12-08 |
no stucteral damage but needs skim coat of spackel sand then prime and two painting. | |||||||||||||
2010 | SAN FRANCISCO | CA | E | R | B | 4 | 35 | Y | 60 | 30 | 30 | M | 2003-12-07 |
3-story, 2-unit Edwardian style with very few accents/moulding. Bottom level is garage. Top 2 levels are flats. 4 bay windows in front of building. | |||||||||||||
2009 | SAN FRANCISCO | CA | E | R | B | 4 | 35 | Y | 60 | 30 | 30 | M | 2003-12-07 |
3-story, 2-unit Edwardian style with very few accents/moulding. Bottom level is garage. Top 2 levels are flats. 4 bay windows in front of building. | |||||||||||||
2008 | PHOENIX | AZ | E | R | B | 0 | 8 | Y | 29 | 58 | 10 | M | 2003-12-07 |
2007 | PHOENIX | AZ | E | R | B | 0 | 8 | Y | 29 | 58 | 10 | M | 2003-12-07 |
2006 | BALDWIN | NC | I | R | B | 9 | 2 | Y | 50 | 50 | 8 | H | 2003-12-07 |
2005 | BURNSVILLE | MN | I | R | W | 0 | 0 | N | 60 | 30 | 2 | M | 2003-12-06 |
2004 | BURNSVILLE | MN | I | R | W | 0 | 0 | N | 0 | 0 | 0 | M | 2003-12-06 |
2003 | BURNSVILLE | MN | I | R | W | 0 | 0 | N | 0 | 0 | 0 | M | 2003-12-06 |
2002 | ROANOKE | VA | I | R | B | 8 | 10 | Y | 10 | 300 | 10 | H | 2003-12-05 |
Old home with prep work needed | |||||||||||||
2001 | WOODLAND HILLS | CA | E | R | B | 1 | 10 | Y | 60 | 30 | 8 | H | 2003-12-05 |
The house is one story and 1800 square feet | |||||||||||||
2000 | HIGHLAND | MN | E | R | B | 2 | 10 | N | 30 | 60 | 9 | M | 2003-12-05 |
1999 | BAY PORT | NY | I | R | B | 0 | 4 | Y | 14 | 26 | 8 | M | 2003-12-05 |
Living room includes bay window consisting of 2 casement windows both 26 x 62 plus 1 fixed window 62 x 62. Fireplace is 55 W x 31 D. 1 triple-casement window 75 W x 50 H. 2 interior entryways one 48 x 81 and another 35 x 81. | |||||||||||||
1998 | COTTAGE LAKE | WA | I | R | B | 8 | 5 | Y | 25 | 30 | 9 | L | 2003-12-04 |
"Doors" means both sides of door. "Windows" only means the sill--there is no trim. There are also 10 Closet & Hinged Doors, where only one side needs to be painted. No furniture in unit. Too many dimensions to enter. Unit is 1450 sq ft--need entire inter | |||||||||||||
1997 | HIGHLAND | MN | E | R | B | 0 | 10 | N | 30 | 60 | 8 | M | 2003-12-04 |
1994 | SEDONA | AZ | I | R | B | 3 | 4 | N | 60 | 30 | 8 | M | 2003-12-04 |
1993 | SCOTTSDALE | AZ | E | R | B | 2 | 0 | Y | 30 | 45 | 22 | M | 2003-12-03 |
2900 sq.ft., 2-story stucco house | |||||||||||||
1992 | CULVER CITY | CA | I | R | W | 3 | 4 | N | 0 | 0 | 0 | M | 2003-12-03 |
2 bedrooms in a 830 sq ft condo. Only noticeable areas nd painting. Possibly living/dining room plus halls. | |||||||||||||
1991 | WESTFIELD | NJ | I | R | B | 3 | 3 | Y | 15 | 18 | 8 | H | 2003-12-03 |
Bedroom. 2 baths, hallway all needs painting...will buy own paint | |||||||||||||
1990 | WESTFIELD | NJ | I | R | B | 3 | 3 | Y | 15 | 18 | 8 | H | 2003-12-03 |
Bedroom. 2 baths, hallway all needs painting...will buy own paint | |||||||||||||
1989 | OAKLEY | CA | E | R | W | 16 | 43 | Y | 40 | 70 | 22 | M | 2003-12-03 |
3/4 stucco home. Repaint. | |||||||||||||
1988 | JACKSONVILLE | FL | E | R | B | 1 | 20 | Y | 0 | 141 | 10 | H | 2003-12-03 |
2 coats of paints needed | |||||||||||||
1987 | JACKSONVILLE | FL | E | R | B | 1 | 20 | Y | 0 | 141 | 10 | M | 2003-12-03 |
2 coats of paints needed | |||||||||||||
1986 | YANKTON | SD | I | C | W | 2 | 2 | N | 44 | 8 | 19 | M | 2003-12-02 |
apartment Hallways | |||||||||||||
1985 | ELK GROVE | CA | I | R | W | 0 | 0 | N | 0 | 0 | 0 | H | 2003-12-02 |
Living, Dining, Kitchen, Den, 3 Rooms. Walls Only. 1850sqft Living Space | |||||||||||||
1984 | MAPLEWOOD | MN | E | R | B | 2 | 10 | Y | 25 | 75 | 25 | H | 2003-12-02 |
Not sure the exact dimensions of the exterior. Just looking for average quotes for average sized home. | |||||||||||||
1983 | GREENVILLE | SC | I | R | B | 4 | 8 | Y | 100 | 24 | 10 | H | 2003-12-02 |
9 rooms. 2400 sq.ft. total, paint walls, trim, ceilngs. great room is cathedral with exposed beams(beams will not be painted) total ceiling height is 30 feet(must use scaffolding). cover floor & all furniture with drop cloth. Only premium paint must be u | |||||||||||||
1982 | JACKSONVILLE | FL | E | R | B | 1 | 18 | Y | 0 | 144 | 11 | H | 2003-12-01 |
6 over 1 windows in dad shape | |||||||||||||
1981 | THOMSON | GA | I | R | W | 0 | 0 | Y | 18 | 26 | 8 | M | 2003-12-01 |
Hi, I don't have a wall that needs painting it is a ceiling. The popcorn is falling off and I need a quote to take it off and paint the ceiling in orange peel or something, or fix the existing popcorn and paint the ceiling. | |||||||||||||
1980 | JACKSONVILLE | FL | E | R | B | 1 | 18 | Y | 0 | 144 | 11 | H | 2003-12-01 |
6 over 1 windows in dad shape | |||||||||||||
1979 | JACKSONVILLE | FL | E | R | B | 1 | 18 | Y | 0 | 144 | 11 | H | 2003-12-01 |
6 over 1 windows in dad shape | |||||||||||||
1978 | GILBERT | AZ | E | R | W | 0 | 0 | N | 1 | 400 | 6 | H | 2003-12-01 |
This is for an exterior wall that goes around the back yard. The wall is cement block covered with stucco-like finish (no paint currently). The wall is 400ft long (total), 6feet high. Paint on one side only. | |||||||||||||
1975 | HOUSTON | TX | I | R | W | 0 | 0 | N | 0 | 0 | 0 | H | 2003-12-01 |
new home, not lived in, will be ready late Jan 2004, approx 6 to 10 rooms, no trim, no doors, walls only for study, dining, living, game, 4 bedrooms, maybe more. | |||||||||||||
1974 | TACOMA | WA | E | R | B | 2 | 12 | Y | 40 | 40 | 20 | H | 2003-12-01 |
Need to repaint exterior and trim on a 5 year old Burnstead Home in Heritage park. | |||||||||||||
1973 | JEWETT | TX | I | R | B | 3 | 2 | Y | 15 | 17 | 8 | M | 2003-12-01 |
tear sheetrock out 4'x53",replace studs around one side of window & trim,base board.Replace sheetrock,tape & float,float out joints around 2 windows, clauk 17'of base board. | |||||||||||||
1972 | ASHBURN | VA | I | R | B | 0 | 0 | Y | 22 | 35 | 9 | M | 2003-12-01 |
Need entire house painted, it's a 3 level townhose. No cielings, except for one small bedroom. All walls same color, trim/baseboards/handrailing semi gloss white. | |||||||||||||
1971 | DALLAS | GA | E | R | T | 2 | 11 | Y | 0 | 0 | 0 | M | 2003-12-01 |
Do not know width/length/height Looking for ballpark estimates Will follow-up with contractors to give an exact estimate by going to property House is split foyer, basement and garage downstairs 1240 "living" sq. ft. mainly upstairs | |||||||||||||
1970 | INDIAN HEAD PARK | IL | I | R | W | 1 | 0 | N | 0 | 0 | 0 | M | 2003-12-01 |
We are looking to have our ceilings painted and the walls in three of the rooms in our house. | |||||||||||||
1969 | BOYNTON BEACH | FL | I | R | B | 9 | 10 | Y | 8 | 10 | 11 | M | 2003-11-30 |
Master Bedroom (2 walls), Master Bathroom (2 walls) , 2nd bathroom (1 wall) 2 interior hallways, kitchen, breakfast nook, partial touchup in living room. Office area and trim in 2nd bedroom. All baseboards, high gloss white. Home is 5 years old but | |||||||||||||
1968 | AURORA | CO | I | R | W | 0 | 0 | N | 10 | 12 | 8 | M | 2003-11-29 |
1 bedroom, 1 coat of paint. Easy job. | |||||||||||||
1967 | DAYTONA BEACH | FL | E | R | B | 1 | 12 | Y | 50 | 53 | 16 | M | 2003-11-29 |
My house is a story and a half, I would like the paint removed from the red brick on the front of the house, put their by the previous owners, and the rest painted white and trimmed in kaki, It is currently white trimmed with maroon | |||||||||||||
1966 | LATHRUP VILLAGE | MI | I | R | B | 1 | 1 | Y | 10 | 10 | 8 | M | 2003-11-26 |
1965 | LATHRUP VILLAGE | MI | I | R | B | 1 | 1 | Y | 10 | 10 | 8 | M | 2003-11-26 |
1963 | APPLETON | WI | E | R | W | 0 | 0 | N | 70 | 80 | 6 | H | 2003-11-26 |
Rectangular Cedar fence needs staining. North&South sides(70' 2coat outside, 1coat inside), Eastside(80' 2coat outside, 1coat inside), Westside(80' inside only 2coat) All sides 6' in height. Sherwin Williams Woodscapes solid color stain(taupe color) | |||||||||||||
1962 | DETROIT | MI | E | R | B | 15 | 17 | Y | 3 | 0 | 8 | M | 2003-11-26 |
I have a brand new 2400 square foot rance that needs painting. It is a basic new construction paint job. Semi-gloss on trim and flat on the walls. | |||||||||||||
1961 | DETROIT | MI | E | R | B | 15 | 16 | Y | 3 | 0 | 8 | M | 2003-11-26 |
I have a brand new 2400 square foot rance that needs painting. It is a basic new construction paint job. Semi-gloss on trim and flat on the walls. | |||||||||||||
1960 | NEW ORLEANS | LA | E | R | B | 6 | 12 | N | 70 | 125 | 50 | H | 2003-11-25 |
1959 | BLACK POINT | CA | I | R | B | 10 | 20 | Y | 100 | 100 | 30 | H | 2003-11-24 |
I am looking for someone to paint my house in Novato in January. It is about 3300 sq ft. This form requires measurements, but I don't know them so ignore those numbers. I would like an estimate for the entire house and then a second estimate for part of t | |||||||||||||
1958 | NUTLEY | NJ | I | R | B | 3 | 4 | Y | 13 | 11 | 10 | H | 2003-11-24 |
I need to paint the following rooms 1. Bedroom (w x l x h - 13' x 11' x 10') 2. Basement (w x l x h - 15'6'' x 21'8'' x 10') 3. Kitchen Cabinets (currently black) 4. Bathroom - standard | |||||||||||||
1957 | KLEIN | TX | I | R | B | 16 | 18 | Y | 60 | 30 | 8 | M | 2003-11-24 |
We would like the complete interior painted. The house is a two story home, with 3 bedrooms, 3 bathrooms, 1 office, 2 living rooms, 2 dining rooms and 1 kitchen. Please note that the ceiling in the downstairs living room is very high (cathedral ceiling). | |||||||||||||
1956 | BERLIN | MD | E | R | T | 0 | 15 | N | 39 | 53 | 52 | H | 2003-11-24 |
15 vinyl window frames, interior and exterior. Sizes given are approximate. Some windows are smaller, i.e., bathrooms | |||||||||||||
1955 | E FARMINGDALE | NY | I | R | B | 5 | 10 | N | 62 | 72 | 8 | M | 2003-11-24 |
1954 | E FARMINGDALE | NY | E | R | B | 5 | 10 | N | 62 | 72 | 8 | M | 2003-11-24 |
1953 | BIXBY KNOLLS | CA | I | R | B | 0 | 0 | N | 14 | 20 | 8 | M | 2003-11-24 |
Started painting not happy with color. Needs a base plus 1 layer of decent paint. Cleanliness and neatness are very important to us. | |||||||||||||
1952 | LEXINGTON | KY | E | R | B | 1 | 6 | N | 60 | 30 | 25 | M | 2003-11-24 |
project is exterior of a two story house,approx.1600 sq ft. vinyl siding | |||||||||||||
1951 | BRECKENRIDGE HILLS | MO | I | R | B | 6 | 10 | Y | 12 | 12 | 8 | M | 2003-11-23 |
1950 | BRANDON | FL | E | R | B | 4 | 10 | N | 60 | 30 | 8 | H | 2003-11-23 |
Residential 2000 sq ft home exterior. New stucco. Brandon Fl. Need color design help. I can provide paint and primer. | |||||||||||||
1949 | BROOKLYN | NY | I | R | B | 0 | 0 | Y | 17 | 17 | 9 | M | 2003-11-23 |
17' x 17' tin ceiling and trim | |||||||||||||
1948 | PARSIPPANY | NJ | I | R | B | 0 | 0 | N | 0 | 0 | 0 | H | 2003-11-23 |
1 bedroom walls/ceiling & trim 2 standard windows together.room size W13'x 11'9" Ceiling 8' 1 bedroom walls ceiling & trim 2 standard windows different parts of the room. 8'Ceiling (W13'6" x L15'ROOM SIZE ) Small bathroom in this room with one windo | |||||||||||||
1947 | SAN DIEGO | CA | I | R | W | 0 | 1 | N | 12 | 12 | 10 | M | 2003-11-21 |
Room is currently painted yellow and purple, needs painted white (ceiling and walls). No trim work. No doors, only one window to paint around. Easy job. | |||||||||||||
1946 | SILVER SPRING | MD | E | R | B | 2 | 1 | Y | 30 | 30 | 10 | H | 2003-11-21 |
cape cod. Two story. Aluminum siding, paint is peeling. Front and back door wood need prep and oil based paint. | |||||||||||||
1945 | SILVER SPRING | MD | E | R | B | 2 | 1 | Y | 30 | 30 | 10 | H | 2003-11-21 |
cape cod. Two story. Aluminum siding, paint is peeling. Front and back door wood need prep and oil based paint. | |||||||||||||
1944 | INDIANAPOLIS | IN | I | R | B | 1 | 1 | Y | 16 | 20 | 12 | H | 2003-11-21 |
Small bathroom and adjoining bedroom | |||||||||||||
1943 | ATLANTIS | FL | I | R | B | 7 | 7 | Y | 60 | 30 | 8 | H | 2003-11-21 |
This is a new townhome, no furniture moving, we also need designer assistance with colors to go with our artwork and furniture. Prefer Ralph Lauren colors and possible faux finish work. The townhome is 1800 sq. ft, 2 story, 3 br, 2.5 bath, base boards a | |||||||||||||
1942 | ATLANTIS | FL | I | R | B | 7 | 7 | Y | 60 | 30 | 8 | H | 2003-11-21 |
This is a new townhome, no furniture moving, we also need designer assistance with colors to go with our artwork and furniture. Prefer Ralph Lauren colors and possible faux finish work. The townhome is 1800 sq. ft, 2 story, 3 br, 2.5 bath, base boards a |