6557 Available Projects
From November 3, 2002 to Today
Contractors: please click on Login button above to login and submit bids on these projects.
Column heading buttons: click on to sort by (e.g. click on RC to see all commercial jobs first and residential jobs second, or click on State button to sort by State, etc.).
Column Definitions: ID=Reference Number, IE=Interior/Exterior, RC=Residential/Commercial, P=Paint Walls/Trim/Both, D=# of Doors, Win=# of Windows, OB=Overhang/Baseboard paint Yes/No, W=Width in feet, L=Length in feet, H=Height in feet, Q=Quality Low/Medium/High.
Results Page(s) (100 per page): 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66
ID | Ci | St | IE | RC | P | D | Win | OB | W | L | H | Q | Posted |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Description | |||||||||||||
1622 | CORONA | CA | I | R | B | 6 | 0 | N | 0 | 0 | 0 | L | 2003-10-13 |
We are in the process of closing on a new house in the Corona area, I am looking for someone to come in and do a basic paint over in the entire house. house is approx 1650sqr/ft. | |||||||||||||
1621 | GAITHERSBURG | MD | I | R | B | 7 | 15 | N | 0 | 0 | 0 | H | 2003-10-13 |
Hi, I am interested in getting a quote for painting my single family house. Areas to be painted : Living room , Family room, Dining Room, Foyer, Hallway,Kitchen, 4 Bedrooms, sitting room in the master bedroom and Master Bathroom. Total sq.feet roughly w | |||||||||||||
1620 | CARLSBAD | CA | I | R | B | 4 | 5 | Y | 21 | 26 | 8 | M | 2003-10-13 |
2 bdrms 10x10, 12x12 liv rm, 2 baths 5x8, 1 hall 3x5, 1 entry 3x5, 1 kitchen 5x9 | |||||||||||||
1619 | NOVATO | CA | E | R | B | 3 | 12 | N | 100 | 50 | 12 | M | 2003-10-13 |
Single Story, ranch style house in Pleasant Valley area of Novato. The dimensions are really unknown. We are on Gustafson Ct. and most of the houses in this area are so similar that the true information should be easily aquired...Sorry | |||||||||||||
1618 | PASADENA | TX | I | R | W | 0 | 0 | N | 1 | 1 | 1 | M | 2003-10-13 |
Need quote for 1 bathroom and kitchen. | |||||||||||||
1617 | IRVING | TX | I | R | W | 0 | 0 | N | 16 | 18 | 9 | M | 2003-10-13 |
This job consists of painting a guest bedroom in a new house. The doors and windows do not need to be painted. I've got 9' ceilings. I've also got a bathroom attached that I will want to paint (smaller follow-on project. | |||||||||||||
1616 | IRVING | TX | I | R | W | 0 | 0 | N | 16 | 18 | 9 | M | 2003-10-13 |
This job consists of painting a guest bedroom in a new house. The doors and windows do not need to be painted. I've got 9' ceilings. I've also got a bathroom attached that I will want to paint (smaller follow-on project. | |||||||||||||
1615 | MONEE | IL | I | R | B | 3 | 1 | N | 12 | 16 | 8 | H | 2003-10-13 |
master bedroom. we supply the paint. paint walls and ceiling with primer and 2 coats, keep carpet clean, wood trimming clean, door trimmings clean, tape those trimmings. | |||||||||||||
1614 | WESTCHESTER | IL | I | R | B | 1 | 2 | Y | 12 | 12 | 8 | H | 2003-10-13 |
Wanting to faux paint our kitchen | |||||||||||||
1613 | DEARBORN | MI | I | R | T | 0 | 2 | Y | 2 | 2 | 2 | H | 2003-10-13 |
I HAVE ONE BEDROOM THAT NEEDS THE WALLS ONLY AND THEN 2 SMALLER BEDROOMS HTAT NEED CROW AND TRIM NO DOORS AND 1 BATHROOM THAT NEEDS CROWN AND TRIM AND THE OTHER BATHROOM THAT NEEDS ONLY CROWN A SMALL HAAL WAY THAT NEEDS CROWN AND TRIM | |||||||||||||
1612 | DEARBORN | MI | I | R | T | 0 | 2 | Y | 2 | 2 | 2 | H | 2003-10-13 |
I HAVE ONE BEDROOM THAT NEEDS THE WALLS ONLY AND THEN 2 SMALLER BEDROOMS HTAT NEED CROW AND TRIM NO DOORS AND 1 BATHROOM THAT NEEDS CROWN AND TRIM AND THE OTHER BATHROOM THAT NEEDS ONLY CROWN A SMALL HAAL WAY THAT NEEDS CROWN AND TRIM | |||||||||||||
1611 | SNELLVILLE | GA | I | R | W | 0 | 0 | N | 14 | 38 | 18 | H | 2003-10-13 |
Contemporary home with open floor plan. Living and dining room areas flow together with vaulted ceilings. | |||||||||||||
1610 | DALLAS | GA | E | R | B | 3 | 10 | Y | 35 | 60 | 25 | M | 2003-10-13 |
2-story house not sure as to square footage. 3/2 basic 2 story square house. I am guessing at 40x60. Needs pressure washing and caulking. Has original paint builders paint from 1997. I will visit references homes. Start date is soon depending on your | |||||||||||||
1609 | AGUA DULCE | CA | I | R | W | 0 | 0 | N | 160 | 120 | 8 | M | 2003-10-12 |
The entire interior of a new 2600 square foot house. No ceilings, baseboards, doors or windows. Paint will be provided and no furniture will be in the house. There are 4 bedrooms, three bathrooms, a kitchen, living room, family room and dining room. | |||||||||||||
1608 | AGUA DULCE | CA | I | R | W | 0 | 0 | N | 160 | 120 | 8 | M | 2003-10-12 |
The entire interior of a new 2600 square foot house. No ceilings, baseboards, doors or windows. Paint will be provided and no furniture will be in the house. There are 4 bedrooms, three bathrooms, a kitchen, living room, family room and dining room. | |||||||||||||
1607 | BOCA RATON | FL | I | R | B | 5 | 0 | Y | 0 | 0 | 0 | H | 2003-10-12 |
I have a decent size job here. My condo is 1000 sq. ft. The majority of the rooms have already been painted by myself. All that remains is a small kitchen, 1 small bathroom, 1 small bath ceiling, some trim, some touch up, and a few doors 5 I believe. I am | |||||||||||||
1606 | LEWIS CENTER | OH | I | R | W | 0 | 0 | N | 18 | 36 | 8 | H | 2003-10-12 |
I have a family room, dining room and kitchen that needs painted. the total room space is roughly 700 ft. sq. However, the space has cabinets, doors, windows, etc. that won't be painted. I'm not fully sure how much wall space actually needs painted. | |||||||||||||
1605 | LITHONIA | GA | I | R | W | 0 | 0 | Y | 0 | 0 | 0 | M | 2003-10-12 |
NEED AN ESTIMATE ON INTERIOR OF HOME APPX.4000SF. TWO STORY FAMILY ROOM. NO TRIM OR DOORS JUST THE WALLS | |||||||||||||
1604 | SANTA ROSA | CA | I | R | B | 0 | 0 | Y | 0 | 0 | 0 | M | 2003-10-11 |
1603 | EDGEWOOD | WA | E | R | B | 2 | 0 | Y | 25 | 46 | 8 | M | 2003-10-11 |
1100 sq ft rambler, T-111 siding, southern exposure needs prep and priming. Easy access around entire house.Metal gutters to be included in trim painting. | |||||||||||||
1602 | COLUMBIA | MD | I | R | B | 12 | 12 | Y | 50 | 50 | 50 | M | 2003-10-11 |
Paint the entire house on the inside with good quality paint. Remove and re hang wall hangings. | |||||||||||||
1601 | ANDALUSIA | PA | E | R | B | 2 | 6 | Y | 12 | 12 | 12 | M | 2003-10-11 |
townhouse - paint over existing aluminum siding.i don't know what to put in for width,length or height | |||||||||||||
1600 | EDGEWOOD | WA | E | R | B | 1 | 0 | Y | 24 | 54 | 8 | M | 2003-10-10 |
T-111 siding. small rambler w/2 gable ends, single car garage door to be painted. | |||||||||||||
1599 | VAIDEN | MS | I | R | B | 7 | 0 | Y | 100 | 137 | 40 | H | 2003-10-10 |
sheetrock walls mud, sanding ,fixing all nicks etc. | |||||||||||||
1598 | VAIDEN | MS | I | R | B | 7 | 0 | Y | 100 | 137 | 40 | H | 2003-10-10 |
sheetrock walls mud, sanding ,fixing all nicks etc. | |||||||||||||
1597 | AULT FIELD | WA | E | R | B | 2 | 9 | Y | 40 | 30 | 20 | M | 2003-10-09 |
Two-storey, chimney, 1600 total square feet, dimensions given are mere guesses only. | |||||||||||||
1596 | CORDOVA | TN | E | R | T | 3 | 22 | Y | 67 | 70 | 20 | H | 2003-10-09 |
4500 sq ft home. Some wood needs replacing. Some windows need re-glazing. some scraping needed. | |||||||||||||
1595 | CORDOVA | TN | E | R | T | 3 | 22 | Y | 67 | 70 | 20 | H | 2003-10-09 |
4500 sq ft home. Some wood needs replacing. Some windows need re-glazing. some scraping needed. | |||||||||||||
1594 | CLIFFWOOD BCH | NJ | I | R | B | 0 | 7 | N | 9 | 12 | 8 | M | 2003-10-09 |
9 x 12 loft: a 11 x 12 bedroom: a 12 x 16 bedroom and a 12 x 18 living that needs painting. | |||||||||||||
1593 | APTOS | CA | E | R | B | 2 | 4 | Y | 12 | 24 | 20 | H | 2003-10-09 |
two walls only (of a new addition), 24 by 12, two stories. New unpainted wood siding. Need it painted before the rains. Not sure how many coats needed in that situation--you tell me. | |||||||||||||
1592 | REDONDO BEACH | CA | I | R | B | 1 | 1 | N | 20 | 12 | 16 | M | 2003-10-09 |
Family room with vaulted ceiling and 2 flights of stairs. Walls only, ceiling already done. Painting over light blue color with light sage color. May need primer. | |||||||||||||
1591 | BROOKLYN | NY | I | R | B | 7 | 0 | Y | 4 | 90 | 10 | L | 2003-10-09 |
it is the interior stairwell of an apartment building, 3 floors, plus the floor. | |||||||||||||
1590 | NAPERVILLE | IL | I | R | B | 0 | 0 | Y | 18 | 25 | 8 | M | 2003-10-09 |
single family home with 4 bed rooms, living, family, kitchen, dining rooms, | |||||||||||||
1589 | ALOHA | OR | E | R | W | 0 | 0 | Y | 16 | 0 | 4 | H | 2003-10-09 |
I need the top 4 feet of my chimney (wood covered) painted. | |||||||||||||
1588 | F M | FL | E | R | B | 3 | 10 | N | 50 | 30 | 9 | M | 2003-10-09 |
small home painted gray with white trim | |||||||||||||
1587 | F M | FL | E | R | B | 3 | 10 | N | 50 | 30 | 9 | M | 2003-10-09 |
small home painted gray with white trim | |||||||||||||
1586 | ROSALIA | WA | E | R | B | 4 | 11 | Y | 65 | 31 | 10 | H | 2003-10-09 |
Ranch style home in Rosalia, WA was poorly painted, needs new professional job. Dates flexible. Please include any cost-effective suggestions. | |||||||||||||
1585 | MIAMI | FL | I | R | B | 10 | 10 | Y | 60 | 30 | 2 | H | 2003-10-08 |
2 apartments in Florida totalling 8,000 interior sq. feet. I am an interior designer and am looking for good quality paint work at a goo dprice. Thanks. | |||||||||||||
1584 | SHELBY TOWNSHIP | MI | I | R | W | 0 | 0 | N | 12 | 12 | 9 | M | 2003-10-08 |
I have a living room and kitchen to paint. living is 20 22 kitchen 12 10 give me quotes for each with trim and without greatly appriciated thanks little or no prepping necessary | |||||||||||||
1583 | SHELBY TOWNSHIP | MI | I | R | B | 0 | 0 | N | 12 | 12 | 9 | M | 2003-10-08 |
I have a living room and kitchen to paint. living is 20 22 kitchen 12 10 give me quotes for each with trim and without greatly appriciated thanks little or no prepping necessary | |||||||||||||
1582 | SHELBY TOWNSHIP | MI | I | R | B | 0 | 0 | Y | 22 | 20 | 9 | M | 2003-10-08 |
I have a living room and kitchen to paint. living is 20 22 kitchen 12 10 give me quotes for each with trim and without greatly appriciated thanks little or no prepping necessary | |||||||||||||
1581 | SHELBY TOWNSHIP | MI | I | R | B | 0 | 0 | N | 22 | 20 | 9 | M | 2003-10-08 |
I have a living room and kitchen to paint. living is 20 22 kitchen 12 10 give me quotes for each with trim and without greatly appriciated thanks little or no prepping necessary | |||||||||||||
1580 | SHELBY TOWNSHIP | MI | I | R | B | 0 | 0 | N | 0 | 0 | 0 | M | 2003-10-08 |
I have a living room and kitchen to paint. living is 20 22 kitchen 12 10 give me quotes for each with trim and without greatly appriciated thanks little or no prepping necessary | |||||||||||||
1578 | MIAMI | FL | I | R | B | 10 | 10 | Y | 2 | 2 | 7 | H | 2003-10-08 |
2 apartments in Aventura, Fla. about 8,000 sq. ft. | |||||||||||||
1577 | VILLANOVA | PA | I | R | B | 10 | 10 | Y | 2 | 2 | 7 | M | 2003-10-08 |
2 apartments in Aventura, Florida about 8,000 sq. ft. in total | |||||||||||||
1575 | HOFFMAN EST | IL | I | R | W | 2 | 0 | Y | 105 | 70 | 9 | M | 2003-10-08 |
2800 SQ Feet single family house and all rooms need to be painted. 4 BR, 2 1/2 Bath, Family, Living, Foyer, Kitchen and garage. | |||||||||||||
1574 | LAGUNA BEACH | CA | I | C | W | 0 | 0 | N | 0 | 0 | 0 | M | 2003-10-08 |
2400 sq ft office, no doors or trim | |||||||||||||
1573 | DAVIE | FL | E | R | B | 3 | 0 | Y | 50 | 90 | 10 | M | 2003-10-08 |
3500 square feet exterior painted for home sale. not painting brick or garage door. Need it to look good for prospective buyers. 4 sets of shutters. Need to finance project. | |||||||||||||
1572 | SIMI VALLEY | CA | I | R | B | 10 | 0 | N | 26 | 51 | 8 | M | 2003-10-08 |
I'm not sure if I put in all the numbers you need. I need 2000 square feet painted. All ceilings are 8 foot except the living room which is open through floor above all the way to the ceiling. (Room size is 22 x 12.6). I do want the ceilings painted. I | |||||||||||||
1571 | NEW ROCHELLE | NY | I | R | W | 0 | 0 | Y | 10 | 10 | 10 | H | 2003-10-08 |
1 room. Ceiling and walls. | |||||||||||||
1570 | NEW ROCHELLE | NY | I | R | W | 0 | 0 | Y | 10 | 10 | 10 | H | 2003-10-08 |
1 room. Ceiling and walls. | |||||||||||||
1569 | CANAL WHCHSTR | OH | I | C | W | 0 | 0 | Y | 12 | 12 | 12 | H | 2003-10-08 |
4 coats of paint on each room | |||||||||||||
1568 | BENBROOK | TX | E | R | B | 0 | 0 | Y | 3 | 300 | 0 | M | 2003-10-08 |
house paint pealing badly on sun soaked areas fascia and 2'truss overhang replace one window sill exterior 81.5" by 8" replace 2-12.5' fascia boards paint entire fascia and overhang | |||||||||||||
1567 | BAMMEL | TX | I | R | W | 2 | 4 | N | 12 | 18 | 10 | M | 2003-10-07 |
1566 | FORKS | PA | I | R | B | 0 | 4 | Y | 12 | 24 | 8 | H | 2003-10-07 |
Might want type of pattern on walls,such as stripes | |||||||||||||
1565 | FORKS | PA | I | R | B | 0 | 4 | Y | 12 | 24 | 8 | H | 2003-10-07 |
Might want type of pattern on walls,such as stripes | |||||||||||||
1564 | LANDING | NJ | E | R | B | 3 | 17 | Y | 25 | 40 | 16 | H | 2003-10-07 |
Bi-level with 2 garage doors | |||||||||||||
1563 | LITTLE ROCK | AR | E | R | B | 2 | 8 | N | 30 | 60 | 10 | M | 2003-10-07 |
I power-wash, provide primer and paint | |||||||||||||
1562 | IRVING | TX | I | R | W | 0 | 2 | N | 10 | 15 | 12 | H | 2003-10-07 |
I need the dinning room and the library painted, they both the a chair trim, the dinning has 1 wall,1 wall with window,a column, and the study has 2 wall,wall with window. | |||||||||||||
1561 | DUNEDIN | FL | E | R | B | 2 | 11 | Y | 40 | 60 | 8 | M | 2003-10-07 |
1560 | AVONDALE-GOODYEAR | AZ | I | R | W | 0 | 0 | N | 0 | 0 | 0 | H | 2003-10-07 |
2300 sq ft, two-story, vacant house | |||||||||||||
1559 | SNOHOMISH | WA | I | R | W | 0 | 0 | N | 0 | 0 | 0 | H | 2003-10-07 |
2500 square foot house All one color | |||||||||||||
1558 | MARGATE | FL | E | R | B | 2 | 10 | Y | 40 | 60 | 18 | M | 2003-10-07 |
two story, approx. 2,000 square feet CocoBay subdivision | |||||||||||||
1557 | TABB | VA | I | R | B | 0 | 0 | N | 50 | 28 | 10 | M | 2003-10-07 |
we'd like someone to paint the downstairs walls and ceilings. the job also involves removing a wallpaper trim in the kitchen. | |||||||||||||
1556 | OGONTZ CAMPUS | PA | I | R | B | 8 | 5 | Y | 28 | 32 | 8 | H | 2003-10-07 |
family room and bedroom, paint paneling in family room and both sides of 8 doors in both rooms which includes the exterior of two doors and a closet door. The wallpaper needs to be removed in the bedroom. There are 5 windows to be painted. There seem | |||||||||||||
1555 | ARLINGTON | MA | I | R | T | 0 | 0 | N | 14 | 11 | 0 | M | 2003-10-07 |
Want to have two ceilings painted in our condo. Both ceilings are 11x14. | |||||||||||||
1554 | CABIN JOHN | MD | I | R | B | 1 | 1 | Y | 13 | 13 | 8 | M | 2003-10-06 |
Over the next year I plan to do one room at a time in my home. It was all just painted, but I have decided to go with an entirely different style and color scheme. I am only looking for a quote on this one room right now, thought. It isn't very large. | |||||||||||||
1553 | CANTON | OH | I | R | B | 0 | 2 | Y | 0 | 0 | 0 | M | 2003-10-06 |
Need five rooms and hallways painted asap. | |||||||||||||
1552 | CANTON | OH | I | R | B | 0 | 2 | Y | 0 | 0 | 0 | M | 2003-10-06 |
Need five rooms and hallways painted asap. | |||||||||||||
1551 | SUWANEE | GA | I | R | W | 0 | 0 | N | 10 | 10 | 10 | M | 2003-10-06 |
My wife and I did some touch ups to our walls and the paint did not blend in well. Need help to get rid of the many spots on walls, most only 4x4 inches in size. Actual size is an estimate only as the spots are in three different rooms. | |||||||||||||
1550 | KALAMAZOO | MI | I | R | B | 6 | 0 | Y | 0 | 0 | 0 | M | 2003-10-06 |
1700 sqare ft. needs to be painted. The house is empty, carpet will be replaced afterwards. Two rooms need wallpaper taken down...need estimate. | |||||||||||||
1549 | KALAMAZOO | MI | I | R | B | 6 | 0 | Y | 0 | 0 | 0 | M | 2003-10-06 |
1700 sqare ft. needs to be painted. The house is empty, carpet will be replaced afterwards. Two rooms need wallpaper taken down...need estimate. | |||||||||||||
1548 | FREMONT | CA | I | R | W | 0 | 0 | N | 0 | 0 | 0 | M | 2003-10-06 |
What I'd like painted: a dining room (3 walls, sloping up to 12' high about 14' long, 10' wide), adjoining living room (3 walls)12' long and 8' wide, an entry hall (1 wall) 10' long and a small hallway (1 wall about 8' long)... The walls are white and I' | |||||||||||||
1547 | KING | CA | I | R | B | 10 | 10 | Y | 100 | 100 | 8 | H | 2003-10-06 |
Approximately 3000 square feet of house 10 rooms | |||||||||||||
1546 | KING | CA | I | R | B | 10 | 10 | Y | 100 | 100 | 8 | H | 2003-10-06 |
Approximately 3000 square feet of house 10 rooms | |||||||||||||
1545 | MARGATE | FL | E | R | T | 0 | 5 | Y | 3 | 0 | 5 | M | 2003-10-06 |
Hi there, I am in the process of fixing my home from a leak coming from my windows. I need someone right away to take the existing caulk off and put a fresh coat on. I need this done right away b/c it is doing serious damage. Please get back to me righ | |||||||||||||
1544 | DULLES | VA | E | C | B | 1 | 0 | Y | 50 | 50 | 50 | H | 2003-10-06 |
Estimate on sandblasting and painting two (2) concrete ready mix plants one which is located in Centreville, Virginia and the other being located in Newpost, Virginia. Contact for further information or to see the plants is Leonard Breneman at 571-436- | |||||||||||||
1543 | UNION CITY | CA | I | R | B | 0 | 2 | N | 16 | 16 | 12 | M | 2003-10-06 |
1542 | UNION CITY | CA | I | R | B | 0 | 2 | N | 16 | 16 | 12 | M | 2003-10-06 |
1541 | UNION CITY | CA | I | R | B | 0 | 2 | N | 16 | 16 | 12 | M | 2003-10-06 |
1540 | UNION CITY | CA | I | R | B | 0 | 2 | N | 16 | 16 | 12 | M | 2003-10-06 |
1539 | CHINO HILLS | CA | I | R | B | 7 | 8 | Y | 77 | 90 | 8 | H | 2003-10-06 |
1379 sq. ft house. No paint in kitchen. House is empty. Carpet in 4 rooms will be replaced after painting. (Include estimate for removal of acoustic ceiling). Each room is a different color. | |||||||||||||
1538 | ATL | GA | I | R | T | 0 | 0 | N | 14 | 24 | 0 | M | 2003-10-06 |
Need quote to paint and finish ceiling of rec room. No walls at all. | |||||||||||||
1537 | SACRAMENTO | CA | E | R | B | 2 | 2 | Y | 50 | 50 | 10 | H | 2003-10-06 |
1600 Square Foot House | |||||||||||||
1536 | SACRAMENTO | CA | E | R | B | 2 | 2 | Y | 50 | 50 | 10 | M | 2003-10-06 |
1600 Square Feet | |||||||||||||
1535 | GARLAND | TX | I | R | B | 5 | 8 | Y | 28 | 32 | 8 | M | 2003-10-06 |
(include all ceilings)master bedroom, 2 additional smaller bedrooms, hall, entry way, utility room, dining room, 2 bathrooms, large walk-in closet. Ceiling only in Living Room and Kitchen (has paneling & wallpaper). | |||||||||||||
1534 | CASTAIC | CA | E | R | B | 0 | 0 | N | 999 | 999 | 99 | M | 2003-10-06 |
Two bedrooms, one bath and a hallway. | |||||||||||||
1533 | OCEANSIDE | CA | E | R | B | 2 | 13 | Y | 25 | 35 | 25 | H | 2003-10-05 |
1750 sq ft home in Oceanside. 10 years old. Two story. | |||||||||||||
1532 | SACRAMENTO | CA | E | R | B | 1 | 6 | Y | 25 | 35 | 12 | M | 2003-10-05 |
1600 Square Foot House | |||||||||||||
1531 | NEW YORK | NY | I | R | B | 3 | 2 | Y | 12 | 15 | 10 | H | 2003-10-05 |
IT is a 400 square foot apartment. The paint has been layered on and needs to be stripped and repainted. IF possible I would like to add a crown molding up top. | |||||||||||||
1530 | NEW YORK | NY | I | R | B | 3 | 2 | Y | 12 | 15 | 10 | M | 2003-10-05 |
IT is a 400 square foot apartment. The paint has been layered on and needs to be stripped and repainted. IF possible I would like to add a crown molding up top. | |||||||||||||
1529 | NEW YORK | NY | I | R | W | 3 | 2 | Y | 12 | 15 | 10 | M | 2003-10-05 |
IT is a 400 square foot apartment. The paint has been layered on and needs to be stripped and repainted. IF possible I would like to add a crown molding up top. | |||||||||||||
1528 | NEW YORK | NY | I | R | W | 3 | 2 | Y | 12 | 15 | 10 | H | 2003-10-05 |
IT is a 400 square foot apartment. The paint has been layered on and needs to be stripped and repainted. IF possible I would like to add a crown molding up top. | |||||||||||||
1527 | TORRANCE | CA | E | R | B | 2 | 11 | Y | 0 | 0 | 0 | M | 2003-10-05 |
1100 square foot single story home. Ten windows, one sliding door, and two doors. Will need some prep work but not much because the house has recently be re-roofed and re-installed windows. Would like two quotes... one for just paint and one for paint and | |||||||||||||
1526 | MOUNTAIN VIEW | CA | E | R | T | 0 | 20 | Y | 20 | 40 | 30 | H | 2003-10-05 |
Preparation and painting of all exterior wood window frames and trim on the second and third floors of a three story house. | |||||||||||||
1525 | MINNEAPOLIS | MN | I | R | W | 0 | 0 | N | 32 | 16 | 8 | M | 2003-10-05 |
Approx 1000 total square footage: 2 bdrms 1.5 bath 1 living/dining room 1 kitchen | |||||||||||||
1524 | ATL | GA | I | R | B | 7 | 10 | Y | 60 | 30 | 8 | H | 2003-10-05 |
interior painting of 4 brs 3 baths, kitchen, dining room and library plus hallways, foyers and living areas. most challenging part is two story foyer and living room. 8 month old house with neutral paint color on walls now | |||||||||||||
1523 | BAKERSFIELD | CA | E | R | B | 2 | 15 | N | 35 | 40 | 10 | M | 2003-10-05 |
Two-bedroom, basic 1950s stucco home | |||||||||||||
1522 | CENTREVILLE | VA | I | R | B | 2 | 6 | N | 60 | 30 | 8 | M | 2003-10-05 |
Regular home. | |||||||||||||
1521 | JACKSONVILLE | FL | E | R | B | 1 | 0 | Y | 0 | 233 | 13 | M | 2003-10-05 |