6557 Available Projects
From November 3, 2002 to Today
Contractors: please click on Login button above to login and submit bids on these projects.
Column heading buttons: click on to sort by (e.g. click on RC to see all commercial jobs first and residential jobs second, or click on State button to sort by State, etc.).
Column Definitions: ID=Reference Number, IE=Interior/Exterior, RC=Residential/Commercial, P=Paint Walls/Trim/Both, D=# of Doors, Win=# of Windows, OB=Overhang/Baseboard paint Yes/No, W=Width in feet, L=Length in feet, H=Height in feet, Q=Quality Low/Medium/High.
Results Page(s) (100 per page): 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66
ID | Ci | St | IE | RC | P | D | Win | OB | W | L | H | Q | Posted |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Description | |||||||||||||
1520 | SAN JOSE | CA | E | R | B | 3 | 12 | Y | 60 | 80 | 40 | H | 2003-10-05 |
Location: Hidden Glen - Evergreen, San Jose 2 story 2550 sq ft. Arcadia style house. | |||||||||||||
1519 | LOS ANGELES | CA | I | R | B | 9 | 14 | Y | 100 | 88 | 9 | M | 2003-10-04 |
3 Bedroom Apartment with Living Room, Dining Room, Kitchen, Hallway, and 1 Bathroom. | |||||||||||||
1518 | SUGARHILL | GA | E | R | B | 3 | 11 | Y | 20 | 40 | 30 | M | 2003-10-04 |
I want only the exterior of a 2-story home, 3 stories on one side (basement) & trim prepped & painted for owner to sell.. | |||||||||||||
1517 | CECIL | NJ | I | R | W | 0 | 0 | N | 0 | 0 | 0 | H | 2003-10-04 |
living room 30x15, stairwell, upstairs hallway, three bedrooms 20x20. Remove wallpaper and paint in bedrooms. bathroom needs wallpaper removed and needs to be painted. Minor holes need patching and a few cracks need patching. | |||||||||||||
1516 | MECOSTA | MI | I | R | B | 0 | 0 | N | 1 | 1 | 1 | H | 2003-10-04 |
walls are 8ft. high bedroom 1 10 13 bedroom 2 9 12 living room 28 13 bathroom 9 7 2 closets 6 wide primer coat as they are new walls and new trim...celing is painted already | |||||||||||||
1515 | CASSELBERRY | FL | I | R | B | 31 | 0 | N | 50 | 40 | 18 | M | 2003-10-03 |
1514 | CASSELBERRY | FL | I | R | B | 31 | 0 | Y | 50 | 40 | 22 | H | 2003-10-03 |
Upstairs: (900 sq' total) 4br, 1ba & hallway. 16 (avg 30"x80")six panel doors, including closets. All upstairs veilings are 8'. Downstairs: (2000 sq' total) master br, master bath, 2 w/i closets, foyer,(60sq' w/19' ceiling) dining room,living room(200 | |||||||||||||
1513 | CASSELBERRY | FL | I | R | W | 31 | 0 | Y | 50 | 40 | 22 | H | 2003-10-03 |
Upstairs: (900 sq' total) 4br, 1ba & hallway. 16 (avg 30"x80")six panel doors, including closets. All upstairs veilings are 8'. Downstairs: (2000 sq' total) master br, master bath, 2 w/i closets, foyer,(60sq' w/19' ceiling) dining room,living room(200 | |||||||||||||
1512 | SUGAR LAND | TX | I | R | B | 5 | 25 | Y | 126 | 107 | 20 | H | 2003-10-02 |
Entire house needs repainting.Living,study,dine,kit,brkft and 4 bdrms. | |||||||||||||
1511 | BISCAYNE PARK | FL | I | R | W | 5 | 3 | Y | 6 | 90 | 4 | M | 2003-10-02 |
1510 | ROSEVILLE | CA | E | R | B | 2 | 8 | Y | 32 | 30 | 8 | M | 2003-10-02 |
989 square feet house | |||||||||||||
1509 | CONCORD | CA | E | R | B | 3 | 11 | Y | 28 | 28 | 8 | H | 2003-10-02 |
will probably have new windows installed first.trim might need to be primed and painted | |||||||||||||
1508 | MARSHALL | TX | E | R | W | 0 | 0 | N | 0 | 0 | 0 | L | 2003-10-02 |
This property is located in Marshall TX. The homeowner has a budget of 1000.00 to get her house painted. We need a estimate for the project in order for the Homeowner to close, so she can the approximate cash out to close of 1000.00 or less. It is a on | |||||||||||||
1507 | ATTLEBORO | MA | E | R | B | 2 | 8 | Y | 40 | 24 | 8 | H | 2003-10-02 |
stain to be used cabot ovt dessert sand ,two sides of house to be painted,and also my 8x12 shed | |||||||||||||
1506 | TRACY | CA | I | R | B | 11 | 14 | Y | 160 | 160 | 20 | M | 2003-10-02 |
requesting interior painting on 1 level,appx. 1800sqft on a 2176sqft house with tall vault ceiling in living & family & dinning & kitchen rooms. Residence location is at Dalehurst Lane, Tracy, CA 95377. Please call 408-839-3622 to quote and to start imme | |||||||||||||
1505 | THOUSAND OAKS | CA | E | R | B | 2 | 10 | Y | 0 | 0 | 0 | H | 2003-10-02 |
Two story house. Approx 2000 square feet. | |||||||||||||
1504 | BROOKLYN | NY | I | R | B | 50 | 50 | Y | 407 | 408 | 8 | H | 2003-10-02 |
1503 | BROOKLYN | NY | I | R | B | 50 | 50 | Y | 10 | 81 | 8 | H | 2003-10-02 |
1502 | BROOKLYN | NY | I | R | B | 50 | 50 | N | 0 | 0 | 0 | H | 2003-10-02 |
i need to sub out a home that has been remodelled. all walls are newly sheetrocked and need to be primed as well as painted(2 coats). all trim is new and needs to have nail holes filled,caulked, primed and painted. all doors are new and need prime /paint | |||||||||||||
1501 | SCAPPOOSE | OR | E | R | B | 2 | 10 | Y | 35 | 50 | 25 | H | 2003-10-01 |
We would like our house painted. It is a 2 story 2100 sq foot house with a 3 car garage. We'd like you to do a good job and be insured. Please pressure wash the house first and put 2 coats of good paint on. Thanks for your bids. Also, we have trim wi | |||||||||||||
1500 | VAN NUYS | CA | E | R | B | 2 | 10 | Y | 3 | 400 | 8 | M | 2003-10-01 |
Traditional house in Lake Balboa. Detatched garage also needs painting. | |||||||||||||
1499 | SCOTTSDALE | AZ | I | R | W | 2 | 2 | N | 12 | 12 | 12 | M | 2003-10-01 |
1498 | ALPHARETTA | GA | E | R | T | 3 | 17 | Y | 35 | 60 | 12 | M | 2003-10-01 |
1497 | ALPHARETTA | GA | E | R | T | 3 | 17 | N | 35 | 60 | 12 | M | 2003-10-01 |
1496 | ALPHARETTA | GA | E | R | T | 3 | 17 | Y | 35 | 60 | 12 | H | 2003-10-01 |
1495 | SPOKANE | WA | E | R | B | 3 | 12 | Y | 34 | 32 | 30 | H | 2003-10-01 |
1494 | SPOKANE | WA | E | R | B | 3 | 12 | Y | 34 | 32 | 30 | M | 2003-10-01 |
1493 | CLOVERLY | MD | I | R | W | 0 | 0 | N | 32 | 100 | 8 | H | 2003-10-01 |
I just need my walls (whole house) painted a darker color than the present whit color. No doors, ceilings or windows are to be painted. My house is about 3000 sq-ft | |||||||||||||
1492 | ALEXANDRIA | VA | E | R | B | 12 | 12 | Y | 44 | 2 | 84 | M | 2003-10-01 |
Galvanized metal stores for Shurgard Storage have been painted w/latex cedar red paint WITHOUT primer. They need to be stripped, primed and painted - door and frame. 12 doors - both sides. | |||||||||||||
1491 | ENGLEWOOD | NJ | I | R | B | 5 | 4 | Y | 40 | 25 | 15 | M | 2003-10-01 |
This is a 1 bdrm townhouse with a loft. The ceilings in the living area are approx 20ft high and the bedroom are about 15ft high. I am taking possession October 30, 2003 and would like the work done a.s.a.p after that. | |||||||||||||
1490 | ARLINGTON | MA | E | R | T | 0 | 22 | Y | 0 | 0 | 0 | H | 2003-10-01 |
Windows are of varying sizes, they need to scraped and repainted. Frames around front and back door need to be scraped and repainted. The eaves on the top of the house and the sides under the roof need to be painted. | |||||||||||||
1489 | FREDERICK | MD | I | R | W | 0 | 0 | N | 60 | 60 | 60 | H | 2003-10-01 |
paint walls only (no trim, no windows, no ceilings)- kitchen, 2 baths, 4 bedrooms (1 medium size, 3 small) | |||||||||||||
1488 | GRAY COURT | SC | E | R | T | 3 | 15 | Y | 30 | 60 | 8 | H | 2003-10-01 |
paint exterior windows and eaves | |||||||||||||
1487 | MIAMI | FL | E | R | B | 0 | 0 | Y | 50 | 40 | 10 | H | 2003-10-01 |
Call me for more Information 3052298556 ask for Manny | |||||||||||||
1486 | ONTARIO | CA | I | R | B | 7 | 12 | Y | 60 | 30 | 10 | M | 2003-10-01 |
1485 | GAITHERSBURG | MD | I | R | B | 13 | 17 | Y | 24 | 40 | 9 | H | 2003-10-01 |
we have a brand new 3 level townhouse which will be ready for delivery in november. we wud like to have it painted before moving in. all levels need to be painted with wallpaper in the powder room. | |||||||||||||
1484 | DURHAM | NC | E | R | B | 5 | 20 | Y | 27 | 62 | 30 | H | 2003-10-01 |
Painting the exterior of the Historic Bennehan House (c.1787 & 1799). Old paint is peeling badly. This job requires significant scraping and sanding before application of pain.t | |||||||||||||
1483 | COLUMBUS | OH | E | R | T | 2 | 21 | Y | 45 | 50 | 25 | H | 2003-10-01 |
2 story house attached garage with family room in rear of garage. ten wood shutters. | |||||||||||||
1482 | BOULDER | CO | E | R | T | 2 | 10 | Y | 30 | 50 | 8 | H | 2003-10-01 |
This is a brick house (1954) which needs only the wood trim, eaves, chimney siding, etc painted. It's more than just "trim" I think, but does not include walls. Earlier paint jobs had little prep work, and therefore it doesn't look great, however is not p | |||||||||||||
1481 | ALAMEDA | CA | E | R | B | 2 | 10 | Y | 50 | 150 | 10 | H | 2003-10-01 |
1653 sq foot, single story ranch style home. Wood, stucco, and brick exterior, with overhang-- 2 car garage door. | |||||||||||||
1480 | TURLOCK | CA | I | R | B | 7 | 14 | Y | 20 | 50 | 3 | H | 2003-09-30 |
Moving into a 3 year old housse where the current owners smoke. Want the whole interior painted. | |||||||||||||
1479 | BRISTOL | CA | I | R | W | 1 | 0 | Y | 5 | 9 | 8 | M | 2003-09-30 |
I had this horrible wood paneling in my bathroom I tryed to take it off my self and paint it but no joy the glue they used to secure the panels is very commited to staying on the wall | |||||||||||||
1478 | LAGUNA BEACH | CA | I | R | T | 0 | 0 | Y | 0 | 0 | 0 | M | 2003-09-30 |
I just need someone to come in and repaint all the baseboards and interior trim in my house. | |||||||||||||
1477 | LANHAM | MD | E | R | B | 0 | 8 | N | 0 | 0 | 0 | M | 2003-09-30 |
I need to have the entire exterior of the house painted. The house is all Cedar and it may need repainting as well. | |||||||||||||
1476 | LANHAM | MD | E | R | B | 0 | 8 | N | 0 | 0 | 0 | M | 2003-09-30 |
I need to have the entire exterior of the house painted. The house is all Cedar and it may need repainting as well. | |||||||||||||
1475 | SCOTTSDALE | AZ | I | R | W | 0 | 2 | N | 12 | 12 | 0 | L | 2003-09-30 |
brand new house just need some color in the dining room there are 2 arched doorways w/out doors I'm not sure of the heiht but it is not a vaulted ceiling | |||||||||||||
1472 | CHARLOTTE | NC | E | R | T | 2 | 11 | N | 25 | 60 | 20 | M | 2003-09-30 |
Just need the trim on house painted. 2 story house. White color. I'm not certain about the width, length and height. | |||||||||||||
1471 | CHARLOTTE | NC | E | R | T | 2 | 11 | N | 25 | 60 | 20 | M | 2003-09-30 |
Just need the trim on house painted. 2 story house. White color. I'm not certain about the width, length and height. | |||||||||||||
1470 | BROOKLYN | NY | I | R | B | 0 | 4 | Y | 64 | 63 | 11 | M | 2003-09-30 |
The job entails painting 3 bedrooms and one living room. Dimensions are approximately: 15.5x12, 17x16, 10.6x14.1 and 21x21 Walls are approx 11 feet high Date for painting is not set yet | |||||||||||||
1469 | MIDDLE HOPE | NY | I | R | B | 0 | 4 | Y | 20 | 20 | 15 | H | 2003-09-30 |
Newly moved in, sparsely furnished...need entire home painted but intend on completing projects room by room. Walls are clean and no visible damage | |||||||||||||
1468 | FREDERICK | MD | I | R | B | 10 | 6 | Y | 40 | 30 | 9 | H | 2003-09-30 |
I have a LR/DR combo w/ 9 ft ceilings, small sun room, kitchen, foyer, finished basement, 2 BR, and 2.5 baths in townhouse to be painted. | |||||||||||||
1467 | PANAMA CITY | FL | I | R | B | 5 | 3 | Y | 0 | 0 | 99 | H | 2003-09-30 |
approx. 2500 square feet walls approx. 350 feet trim | |||||||||||||
1466 | ISLINGTON | MA | I | C | B | 0 | 0 | N | 0 | 0 | 0 | M | 2003-09-30 |
- high ceiling i-beam supports painted white - minor wall and exposed pipes painted white | |||||||||||||
1465 | ISLINGTON | MA | I | C | B | 0 | 0 | N | 0 | 0 | 0 | M | 2003-09-30 |
- high ceiling i-beam supports painted white - minor wall and exposed pipes painted white | |||||||||||||
1464 | RICHMOND | VA | I | R | B | 1 | 1 | Y | 11 | 8 | 8 | H | 2003-09-29 |
1463 | SAN JOSE | CA | E | R | B | 2 | 8 | Y | 2 | 45 | 14 | M | 2003-09-29 |
1462 | SAN JOSE | CA | E | R | B | 2 | 8 | Y | 2 | 45 | 12 | M | 2003-09-29 |
carport 12X20 House 22X45 Overhang 24"x 45'X 20' (x2) | |||||||||||||
1461 | ONTARIO | CA | I | R | B | 7 | 12 | N | 0 | 0 | 0 | M | 2003-09-29 |
1460 | RADNOR | PA | E | R | T | 4 | 18 | N | 35 | 85 | 15 | H | 2003-09-29 |
My house is a raised ranch with an attached garage. | |||||||||||||
1459 | GRAY COURT | SC | E | R | B | 3 | 16 | Y | 30 | 60 | 8 | H | 2003-09-29 |
Ranch 1750 square feet.I would like a quote for the entire exterior, and one quote for just the eaves,windows and doors. Thank you. | |||||||||||||
1458 | SCHWENKSVILLE | PA | E | R | T | 5 | 32 | Y | 1 | 120 | 20 | M | 2003-09-29 |
1457 | OAKS | PA | E | R | B | 4 | 32 | Y | 1 | 120 | 10 | H | 2003-09-29 |
It is an older house but the paint is still in ok shape. We want it done by Thanksgiving | |||||||||||||
1456 | HOFFMAN EST | IL | I | R | W | 2 | 2 | N | 12 | 20 | 18 | M | 2003-09-29 |
I need someone to paint my living room at my townhouse in Streamwood, IL. I haved taped most of the living room, so there is very little prep work to be done. I would like this completed and a response ASAP. Quicker responses will win the job. | |||||||||||||
1455 | AKRON | OH | E | R | B | 0 | 12 | Y | 25 | 40 | 15 | H | 2003-09-29 |
Entire house needs paint. Already pressurewashed, but needs more prep. We need grey with dark grey accents. Gutters will also need done. | |||||||||||||
1454 | ROUND LK PARK | IL | I | R | B | 18 | 13 | Y | 1 | 1 | 1 | H | 2003-09-29 |
We have moved into a home that defintely needs some work in the paint area. What we need done is the following: 2 story foyer, vaulted front room(12x12.4), powder room, dining room(14.2x11.7), vaulted family room(20.6x13.8), stairway up to second floor, | |||||||||||||
1453 | PERRYSBURG | OH | I | R | W | 2 | 4 | N | 40 | 12 | 10 | L | 2003-09-29 |
1452 | PERRYSBURG | OH | I | R | W | 2 | 4 | N | 40 | 12 | 10 | L | 2003-09-29 |
1451 | BROOKLYN | NY | I | R | B | 6 | 4 | N | 29 | 43 | 8 | H | 2003-09-29 |
bedroom(16x11x8)living room(12x22x8)hall one (6x8x8)hall2(4x3x8)looking for skim coat and painting | |||||||||||||
1449 | IRVINE | CA | I | R | W | 6 | 12 | N | 60 | 30 | 8 | M | 2003-09-28 |
Paint interior of 2050 square feet home. 3 bedrooms, 2.5 baths. Up to 4 different colors in eggshell. No furniture in house. | |||||||||||||
1448 | IRVINE | CA | I | R | W | 0 | 0 | N | 0 | 0 | 0 | M | 2003-09-28 |
Paint interior of 2050 square feet home. 3 bedrooms, 2.5 baths. Up to 4 different colors in eggshell. No furniture in house. | |||||||||||||
1447 | FORT LAUDERDALE | FL | I | R | B | 0 | 1 | N | 13 | 17 | 8 | L | 2003-09-28 |
Wallpaper removal first, woven wood(ratan like). Only three walls need done, one wall is a window from floor to ceiling. | |||||||||||||
1446 | GERMANTOWN | MD | E | R | T | 3 | 9 | Y | 20 | 0 | 30 | H | 2003-09-28 |
Windows and Doors, Trim on the house, trim on the roof. | |||||||||||||
1445 | KNOXVILLE | TN | E | R | B | 2 | 8 | Y | 30 | 50 | 25 | H | 2003-09-28 |
House is a split foyer with brick all around lower level and on front face. | |||||||||||||
1444 | HAMPTON | NJ | I | R | W | 1 | 0 | N | 22 | 20 | 9 | M | 2003-09-28 |
2 car garage needs to be painted so I can finally get it organized. It has already been spackled professionally, but the painting was never done. I want something that will look neat and finished. | |||||||||||||
1443 | JACKSONVILLE | FL | E | R | B | 2 | 14 | Y | 190 | 0 | 9 | H | 2003-09-27 |
house in bad shape | |||||||||||||
1442 | LEANDER | TX | E | R | B | 4 | 15 | Y | 26 | 48 | 20 | M | 2003-09-27 |
size estimate is for the exterior of a 2 story barn. Also needing paint is a 2 car garage and a well (pump) house (8x8). | |||||||||||||
1441 | PORTLAND | OR | E | R | B | 2 | 15 | Y | 38 | 69 | 25 | H | 2003-09-27 |
1440 | BOULDER | CO | I | R | T | 8 | 0 | Y | 24 | 56 | 0 | H | 2003-09-27 |
Trim only - There are 8 doors and there is only trim around the doors. All other trim in the house is for the wood floors and does not need to be done. | |||||||||||||
1439 | BLOOMFIELD | CA | I | R | B | 9 | 15 | Y | 60 | 30 | 10 | M | 2003-09-27 |
it is a 3br 3.5 bath lvng, dining and family room. it is on white oak circle. No furniture to move. off white or egg shell. not sure about the width lenght and height | |||||||||||||
1438 | TACOMA | WA | E | R | B | 3 | 5 | Y | 40 | 50 | 18 | M | 2003-09-27 |
Ranch style house. | |||||||||||||
1437 | TACOMA | WA | E | R | B | 3 | 5 | Y | 40 | 50 | 18 | M | 2003-09-27 |
Ranch style house | |||||||||||||
1436 | COLUMBUS | OH | E | R | T | 2 | 14 | Y | 0 | 0 | 0 | M | 2003-09-26 |
I have a 2 story aluminum siding home in the Gahanna area. I just need the wood,garage door, front & back door trimmed ( I have the primer & paint). I don't know the width, length, & height. | |||||||||||||
1435 | JACKSONVILLE | FL | I | R | W | 0 | 0 | N | 13 | 13 | 8 | M | 2003-09-26 |
paint 3 bedrooms all same size | |||||||||||||
1434 | PALMA CEIA | FL | I | R | B | 11 | 6 | Y | 30 | 20 | 8 | H | 2003-09-26 |
Number of doors includes 5 flat wood doors and luvre doors to 3 closets (6 closet doors in total). SF includes living room, small hallway, and 2 bedrooms. Ceilings also need to be painted. | |||||||||||||
1433 | ORIOLE | PA | E | R | B | 4 | 21 | Y | 25 | 25 | 30 | H | 2003-09-26 |
Large older home. | |||||||||||||
1432 | ROYAL PALM BEACH | FL | I | R | W | 0 | 0 | N | 20 | 30 | 30 | M | 2003-09-26 |
. | |||||||||||||
1431 | ROYAL PALM BEACH | FL | I | R | W | 0 | 0 | N | 74 | 70 | 31 | M | 2003-09-26 |
We need our family room, living room, dining room and play room painted single color. There is also a stairwell and 4 small hallway areas that will need to be painted. | |||||||||||||
1430 | ROYAL PALM BEACH | FL | I | R | W | 8 | 10 | N | 74 | 70 | 31 | M | 2003-09-26 |
We need our family room, living room, dining room and play room painted single color. There is also a stairwell and 4 small hallway areas that will need to be painted. | |||||||||||||
1429 | AHOSKIE | NC | E | R | B | 2 | 20 | Y | 8 | 155 | 8 | M | 2003-09-26 |
paint | |||||||||||||
1425 | RUSSELLVILLE | AR | I | R | B | 1 | 1 | N | 18 | 25 | 8 | H | 2003-09-25 |
repaint | |||||||||||||
1424 | RUSSELLVILLE | AR | I | R | B | 1 | 1 | Y | 18 | 25 | 8 | H | 2003-09-25 |
1423 | TALLAHASSEE | FL | E | R | B | 2 | 11 | Y | 30 | 45 | 15 | M | 2003-09-25 |
new home purchase (home built 1950). It is brick, but gutters, windows, trim, and one wooden siding needj painting. Windows: 1 large 8 medium 1 small 2 doors pressure wash Brick home 3 sides. One side wood siding (needs scraping and paintin | |||||||||||||
1422 | ARVADA | CO | E | R | B | 3 | 12 | Y | 0 | 0 | 0 | H | 2003-09-25 |
Tri-Level home, with garage and shed all to be painted. Home 2500 square feet | |||||||||||||
1421 | BROKEN ARROW | OK | E | R | B | 2 | 0 | Y | 30 | 60 | 8 | M | 2003-09-25 |
Exterior paint job needed. Half of soffits need one coat of finish. The other half is in need of primer first. Only soffits, fascia, and doors need paint, rest of house masonary. Minor scraping needed. Is painted white now, and needing white finish on | |||||||||||||
1420 | VALLEJO | CA | E | R | B | 3 | 11 | Y | 38 | 40 | 10 | M | 2003-09-25 |
Home is being remodeled adding two rooms. Stucco finish on home with the has original paint done 20 years ago. Some minor repair might be required. | |||||||||||||
1419 | AURORA | CO | I | R | B | 0 | 0 | N | 15 | 12 | 16 | M | 2003-09-25 |
This is actually 3 Townhome Ceilings that need painted. Roughed vaulted ceilings 8' to 16' at tallest point. All are about the same size. Suffered some water spotting due to leaks. May require some spackling or patch to a couple of cracked areas. More d | |||||||||||||
1418 | BEDFORD | MA | E | R | T | 2 | 16 | N | 60 | 40 | 16 | M | 2003-09-25 |
House has vinyl siding. Scrape and paint wooden window trim and fascia. | |||||||||||||
1417 | COLUMBUS | OH | E | R | T | 2 | 13 | Y | 0 | 0 | 0 | M | 2003-09-25 |
I have aluminum siding 2 story house and I just need the wood trimmed, garage door, & the two doors painted. I have the paint (prep and exterior paint). | |||||||||||||
1416 | PEACE HAVEN ESTATES | NC | I | R | W | 9 | 17 | N | 40 | 32 | 9 | H | 2003-09-25 |
It is a 2-story, 3200 square-foot new construction house located at the Ivystone community of Winston-Salem | |||||||||||||
1415 | BROOKLYN | NY | I | R | B | 0 | 0 | Y | 0 | 15 | 8 | M | 2003-09-25 |
need one wall in LR painted in color and one small bathroom repainted all in one color |