6557 Available Projects
From November 3, 2002 to Today
Contractors: please click on Login button above to login and submit bids on these projects.
Column heading buttons: click on to sort by (e.g. click on RC to see all commercial jobs first and residential jobs second, or click on State button to sort by State, etc.).
Column Definitions: ID=Reference Number, IE=Interior/Exterior, RC=Residential/Commercial, P=Paint Walls/Trim/Both, D=# of Doors, Win=# of Windows, OB=Overhang/Baseboard paint Yes/No, W=Width in feet, L=Length in feet, H=Height in feet, Q=Quality Low/Medium/High.
Results Page(s) (100 per page): 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66
ID | Ci | St | IE | RC | P | D | Win | OB | W | L | H | Q | Posted |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Description | |||||||||||||
755 | WASHINGTON | DC | E | C | B | 6 | 0 | Y | 40 | 25 | 9 | M | 2003-06-18 |
I need quote asap. I am looking for two coats of latex flat pain, doors and frames as well. | |||||||||||||
754 | JOSHUA | TX | E | R | B | 2 | 4 | Y | 20 | 32 | 8 | M | 2003-06-17 |
753 | JOSHUA | TX | E | R | B | 2 | 6 | Y | 30 | 40 | 8 | M | 2003-06-17 |
Its a little frame house. The front of the house has redwood siding, the rest of the house is just lap siding. | |||||||||||||
752 | EVANSTON | IL | I | R | B | 1 | 1 | Y | 12 | 12 | 8 | M | 2003-06-16 |
Bedroom is currently painted dark red, want a light colour over the top. also paint window, door and trim in contrasting colour | |||||||||||||
751 | MORGAN HILL | CA | I | R | B | 8 | 16 | Y | 70 | 50 | 8 | H | 2003-06-16 |
There are no panes or official trim to be painted with the windows, just sills. First floor: approx: 70x52 Second floor: 50x30 Vaulted ceilings in downstairs living room | |||||||||||||
750 | MUSKEGON | MI | E | R | B | 2 | 14 | Y | 50 | 50 | 50 | H | 2003-06-14 |
two story historic center hall colonial. three garages. | |||||||||||||
749 | MINNEAPOLIS | MN | I | R | B | 7 | 3 | Y | 25 | 30 | 7 | M | 2003-06-14 |
I am just moving into this Condo and would like it painted. The square footage is 1000 sq. ft. I don't know the exact measurement of the condo. There will be 4 colors with one room being dark blue. The others will be light colors with dark colors on the t | |||||||||||||
748 | JAMESTOWN | RI | I | R | B | 3 | 8 | Y | 13 | 22 | 7 | M | 2003-06-13 |
3 rooms- room1- 22x13, 3 windows, 1 door, 2 closets room2- 22x11.5, 3 windows, 1 door, 2 closets room3- 12x10, 2 windows, 1 door, 1 closet 1/2 of 12 foot hallway (6 feet of hallway) | |||||||||||||
747 | TUSTIN | CA | I | R | B | 9 | 0 | Y | 38 | 44 | 44 | M | 2003-06-12 |
Paint 1,243 sq.ft. 3 bedroom, 2 bath condo. Would like bid for refinishing kitchen cabinets | |||||||||||||
746 | TUSTIN | CA | I | R | B | 9 | 0 | Y | 38 | 44 | 44 | M | 2003-06-12 |
We would like to paint the entire 1,243 sq.ft. 3 bedroom, 2 bath condo/townhome we're buying. My width, length, height quotes aren't accurate as we don't know exact measurements of each room. We would also like a bid for refinishing the kitchen cabinets | |||||||||||||
745 | TUSTIN | CA | I | R | B | 9 | 0 | Y | 38 | 44 | 44 | M | 2003-06-12 |
We would like to paint the entire 1,243 sq.ft. 3 bedroom, 2 bath condo/townhome we're buying. My width, length, height quotes aren't accurate as we don't know exact measurements of each room. We would also like a bid for refinishing the kitchen cabinets | |||||||||||||
744 | TUSTIN | CA | I | R | B | 9 | 0 | Y | 38 | 44 | 44 | M | 2003-06-12 |
We would like to paint the entire 1,243 sq.ft. 3 bedroom, 2 bath condo/townhome we're buying. My width, length, height quotes aren't accurate as we don't know exact measurements of each room | |||||||||||||
743 | DIAMOND BAR | CA | E | R | B | 2 | 4 | Y | 35 | 60 | 20 | H | 2003-06-12 |
Two storey house, paint main door, front porch. | |||||||||||||
742 | NORTH BETHESDA | MD | I | R | B | 8 | 8 | N | 15 | 16 | 16 | H | 2003-06-11 |
this is a townhouse with 2,500 s.f. I would like to paint everything including doors, closets and trims. Also power wash of the deck. | |||||||||||||
741 | MOL | OH | E | R | B | 2 | 2 | Y | 36 | 22 | 12 | M | 2003-06-11 |
3 car garage scrape and paint 1 coat. | |||||||||||||
740 | MOL | OH | I | R | B | 1 | 2 | Y | 10 | 12 | 8 | L | 2003-06-10 |
bedroom, both walls and trim and ceiling. | |||||||||||||
739 | MOL | OH | E | R | B | 2 | 2 | Y | 36 | 22 | 12 | H | 2003-06-10 |
3 car garage, scrape and paint 2 coats. | |||||||||||||
738 | JONESBORO | GA | E | R | B | 2 | 6 | Y | 30 | 60 | 8 | M | 2003-06-10 |
Handrail 4'by 10', porch, garage, gutters painted,and clean | |||||||||||||
737 | JONESBORO | GA | E | R | B | 2 | 6 | Y | 30 | 60 | 8 | M | 2003-06-10 |
Handrail 4'by 10', porch, garage, gutters painted,and clean | |||||||||||||
736 | PLAINSBORO | NJ | I | R | W | 1 | 2 | N | 22 | 20 | 10 | M | 2003-06-10 |
735 | BRIDGEPORT | CT | I | R | W | 0 | 0 | N | 20 | 50 | 0 | H | 2003-06-10 |
Paint Kitchen and Living room (Cathedral ceiling in living room | |||||||||||||
733 | HAPPY VALLEY | OR | E | R | B | 3 | 16 | Y | 42 | 56 | 10 | M | 2003-06-09 |
This is a manufactured home and is not a full triple wide so this guesstimate may be high for sq ft. | |||||||||||||
732 | WALDORF | MD | E | R | T | 3 | 12 | Y | 15 | 30 | 30 | H | 2003-06-09 |
2 level townhouse. to include replacement of any rotted wood. | |||||||||||||
731 | EAGLE RIVER | AK | E | R | B | 3 | 15 | Y | 30 | 50 | 20 | H | 2003-06-09 |
home is wood exterior bone color with blue trim would like gray with green trim would like deck painted to match at later date once repairs have been completed, also. | |||||||||||||
730 | FORT LAUDERDALE | FL | I | R | B | 8 | 4 | Y | 28 | 32 | 8 | M | 2003-06-09 |
2 BR, 2 BA Condo. Approx 1200 to 1400 sq feet. | |||||||||||||
729 | FORT LAUDERDALE | FL | I | R | B | 8 | 4 | Y | 28 | 32 | 8 | M | 2003-06-09 |
2 BR, 2 BA Condo. Approx 1200 to 1400 sq feet Condo is dirty, needs cleaning. Windows have marble sills, metal windows. Metal closet doors need painting also, with paint the same color as walls. | |||||||||||||
728 | CLEVELAND | OH | E | R | B | 2 | 2 | Y | 36 | 22 | 12 | M | 2003-06-07 |
3 car garage scrape and paint, all doors and trim same color as walls of garage. (white) | |||||||||||||
727 | MARSHALLTON | DE | I | C | W | 0 | 0 | N | 0 | 0 | 0 | H | 2003-06-06 |
17000 sq ft floor area. Need four walls painted. 30 ft high walls. Please give me a rough estimate. 1 coat of primer, and two coats of flat paint. | |||||||||||||
724 | BUFFALO | NY | E | R | B | 2 | 22 | Y | 15 | 45 | 20 | M | 2003-06-05 |
Single family one and a half story home with a detached garage. | |||||||||||||
723 | COVENTRY | RI | E | R | W | 0 | 0 | Y | 34 | 36 | 20 | M | 2003-06-04 |
Doors and windows does not need painting. Exterior has a hall way on one side of the building not included in measurements. | |||||||||||||
722 | MINNEAPOLIS | MN | E | R | B | 1 | 0 | Y | 8 | 15 | 7 | H | 2003-06-04 |
single detached garage with a garage door but no other door or windows. Paint walls and trim the same color. Let me know if price includes cost of paint and supplies. | |||||||||||||
721 | CLINTON | CT | I | R | B | 1 | 5 | Y | 39 | 27 | 8 | H | 2003-06-03 |
Looking to have 2 rooms painted. Both rooms currently wallpapered. Wall paper will need to be removed and rooms painted. | |||||||||||||
720 | NEWNAN | GA | E | R | B | 3 | 18 | Y | 46 | 52 | 28 | M | 2003-06-03 |
House is "L" shaped not all lengths are 52 ft. most of the house is 30 ft. lenght. House is two story on basement. | |||||||||||||
719 | NEWNAN | GA | E | R | B | 3 | 18 | Y | 46 | 52 | 28 | M | 2003-06-03 |
House is "L" shaped not all lengths are 52 ft. most of the house is 30 ft. lenght. House is two story on basement. | |||||||||||||
718 | NEWNAN | GA | E | R | B | 3 | 18 | Y | 46 | 52 | 28 | H | 2003-06-03 |
House is "L" shaped,not all lenght is 52 ft. most on the house is 30 ft. House is two story on basement not all height is 28 ft. | |||||||||||||
717 | MARSHALLTON | DE | E | R | B | 0 | 0 | N | 0 | 0 | 0 | M | 2003-06-02 |
sub work wanted. call me at 302-723-1967 or e-mail me at talentgencon@comcast.net | |||||||||||||
716 | ROCHESTER | MN | I | R | W | 0 | 0 | N | 0 | 0 | 0 | M | 2003-06-02 |
1360 sq. ft primer walls and paint white on ceilings | |||||||||||||
715 | BYRON | MN | I | R | W | 0 | 0 | Y | 0 | 0 | 0 | M | 2003-06-02 |
1360 square feet White ceilings primer and tan walls | |||||||||||||
714 | GRAHAM | WA | I | R | W | 13 | 11 | N | 38 | 41 | 18 | M | 2003-06-02 |
3 bdrm 2.5 bath, 2 story,less than 1800 sq ft., 1 bay window, no painting of interior doors, liv rm and din rm - great room concept | |||||||||||||
713 | GRAHAM | WA | E | R | B | 2 | 11 | Y | 38 | 41 | 18 | M | 2003-06-02 |
2 story,less than 1800 sq ft., 1 bay window, 2 garage doors | |||||||||||||
712 | MOUNT PROSPECT | IL | I | R | W | 0 | 0 | N | 900 | 900 | 14 | M | 2003-06-02 |
1300 Square feet | |||||||||||||
711 | OAKLAND | CA | E | R | B | 5 | 11 | Y | 40 | 80 | 12 | H | 2003-06-01 |
ranch style house with two car garage. The garage is over the house. House is "L" shaped, so dimensions are estimates since I couldn't fill in all measurments w/ forms. The house is 1700 sq. ft. w/ a combination wood and stucco surface. | |||||||||||||
710 | CAMANO CITY | WA | E | R | B | 2 | 0 | Y | 60 | 30 | 8 | M | 2003-05-30 |
Rambler built on a slope, one side of house two story's high. Also want to have it pressure washed before painted. | |||||||||||||
709 | PHOENIX | AZ | E | R | B | 3 | 13 | N | 24 | 37 | 8 | H | 2003-05-30 |
24'x37' wants brush and rolled (not sprayed) with pure white. Painted brick up to 8 foot, attached car port 12'x24', back patio 8'x37', front patio 6'x37', all eves and windows (13 windows) are dark chocolate brown, house has a lot of paint that has pee | |||||||||||||
708 | OLYMPIA | WA | E | R | B | 1 | 22 | Y | 60 | 30 | 14 | M | 2003-05-30 |
one story 2 trim colors 10 year latex | |||||||||||||
707 | ARDMORE | NC | I | R | B | 12 | 20 | Y | 60 | 30 | 10 | H | 2003-05-29 |
706 | ARDMORE | NC | I | R | B | 12 | 20 | Y | 60 | 30 | 10 | H | 2003-05-29 |
705 | HARTFORD | CT | I | R | B | 1 | 0 | N | 0 | 0 | 0 | H | 2003-05-28 |
Paint finshed basement walls, room dimenmsion 11x24. Sand, prime and paint (16) stairs which lead to basement. Paint walls which enclose stairway. White paint. Paint upper stairway walls which lead to second floor and hallway on second floor (dimension | |||||||||||||
704 | EDEN PRAIRIE | MN | I | R | W | 0 | 0 | N | 19 | 50 | 8 | H | 2003-05-28 |
Purchased brand new 'model' townhome, so not alot of prep work - Living room, dining rm & stairwell need new colors. LR & DR have multiple windows, so not alot of full walls to paint. | |||||||||||||
703 | MARYSVILLE | WA | E | R | B | 3 | 17 | Y | 37 | 43 | 30 | M | 2003-05-27 |
Two story home on a slope. T-111 siding on both sides and rear, l-p siding on the front. Trim will need some prep work ,no prep on the majority of the house. Garage door not included in number of doors. | |||||||||||||
701 | DEARBORN HEIGHTS | MI | E | R | B | 2 | 11 | Y | 22 | 26 | 20 | H | 2003-05-27 |
1000 sq feet, aluminum siding, two story. Please also send prices for "good workmanship" | |||||||||||||
700 | FAYETTEVILLE | NC | E | R | B | 2 | 8 | Y | 25 | 45 | 12 | M | 2003-05-25 |
Hello, I am currently overseas with the Army with no idea when I will be back to do it myself. Looking to have a house ext. painted. Walls and trim. need to replace a couple facia bords as well. Drop me an email and I will respond with required info | |||||||||||||
699 | MARIGOLD | CA | E | R | B | 3 | 0 | Y | 55 | 45 | 9 | M | 2003-05-24 |
apprx 2400 sq ft ranch home (sq ft includes attch garage) one story 3 ft roof overhang to be painted | |||||||||||||
698 | WHIPPANY | NJ | E | R | B | 0 | 0 | Y | 0 | 0 | 0 | H | 2003-05-23 |
THE EXTERIOR OF THE HOME IS ALUMINUM SIDING AND WE WANT TO PAINT IT. THE SIDING IS IN GOOD SHAPE. THE HOME IS APPROX. 1700 SQ FT | |||||||||||||
697 | BENTONVILLE | AR | I | R | W | 0 | 0 | N | 23 | 51 | 11 | M | 2003-05-23 |
696 | MUHLENBERG | NJ | E | R | B | 0 | 0 | N | 0 | 0 | 0 | H | 2003-05-23 |
i am a painting contractor with 12 years experience. looking for work in N.J. interior&exterior,powerwashing,reseal decks, wallpaper install&removal BEST PRICES ALL WORK GARANTEED FOR ONE YEAR | |||||||||||||
695 | MONROE | WA | E | R | B | 0 | 10 | Y | 1 | 1 | 1 | M | 2003-05-22 |
Our house is a typical split-level Monroe, WA home. It is around 2,000 sf. I have digital pictures of all sides of the house that I can send to anyone that contacts me. | |||||||||||||
694 | ORCHARD LAKE | MI | E | R | B | 2 | 14 | Y | 40 | 40 | 30 | H | 2003-05-22 |
Need exterior of house painted. 2 story, 2400 sq ft. Need garage door and front door painted as well. | |||||||||||||
693 | MOBILE | AL | E | R | T | 3 | 10 | Y | 12 | 220 | 10 | M | 2003-05-21 |
two gables with siding one front porch 8ft wide 65 feet long 8 shuters | |||||||||||||
692 | LARCHMONT | NY | I | R | B | 6 | 8 | Y | 50 | 25 | 8 | H | 2003-05-21 |
691 | MANTECA | CA | I | R | T | 7 | 0 | N | 0 | 0 | 0 | M | 2003-05-21 |
Interior doors repainted. Sanded, primed, one coat good paint. Doors include both sides & jams. Seven doors total. | |||||||||||||
690 | FORT WORTH | TX | I | R | B | 10 | 3 | Y | 44 | 43 | 8 | L | 2003-05-21 |
Living Room 19 x 16 (Cathedral Ceiling) Dining Room 12 x 11 Kitchen 10 x 8 Hall 3 x 8 bdroom 11 x 14 bdroom 10 x 10 misc room 10 x 21 The 3 rooms are 1 large open living area. To sell house. I need to use a credit card | |||||||||||||
689 | CLEMENTON | NJ | I | R | B | 8 | 5 | Y | 99 | 99 | 99 | H | 2003-05-21 |
This is a 3-bedroom townhome that was painted orange, blue and green. I would like it back to neutral color. | |||||||||||||
688 | ELGIN | IL | I | R | W | 0 | 0 | N | 25 | 14 | 17 | M | 2003-05-19 |
loft-style condo with high ceilings (17-plus feet) - large living area, small kitchen. One wall is brick and does not need paint. Ceiling does not need to be painted. Darker paint will be used in kitchen area. Above measurements are estimates. | |||||||||||||
687 | NEBR CITY | NE | I | R | W | 0 | 0 | N | 34 | 34 | 10 | M | 2003-05-19 |
Remove existing wallpaper. Repaint with semi-gloss egg shell white. Replace ceiling tile material in basement with new. | |||||||||||||
686 | CAMBRIDGE | MD | E | R | B | 2 | 6 | Y | 60 | 30 | 8 | M | 2003-05-19 |
need to paint a small bedroom, living room, hallway and kitchen | |||||||||||||
685 | CAMBRIDGE | MD | E | R | B | 2 | 6 | Y | 0 | 0 | 0 | M | 2003-05-19 |
need to paint a small bedroom, living room, hallway and kitchen | |||||||||||||
684 | AVONDALE-GOODYEAR | AZ | I | R | W | 0 | 0 | N | 50 | 52 | 10 | H | 2003-05-18 |
The house is brand new and the interior is painted white by the builder.I want to paint over with color.There are vaulted ceilings and the house is one story.I would like a bid on painting just the walls and a seperate bid on also painting the ceilings.Th | |||||||||||||
683 | BALTIMORE | MD | E | R | B | 1 | 0 | N | 1 | 24 | 70 | H | 2003-05-18 |
Repaint botched job on exterior metal door and paint porch and small deck railings | |||||||||||||
682 | BALTIMORE | MD | E | R | B | 1 | 0 | N | 1 | 24 | 70 | H | 2003-05-18 |
680 | VISALIA | CA | I | R | B | 10 | 0 | Y | 0 | 0 | 0 | M | 2003-05-17 |
Interior of a 1600sq ft home. | |||||||||||||
678 | HUNTINGTON | CT | E | R | B | 0 | 21 | Y | 25 | 25 | 30 | H | 2003-05-16 |
677 | PORTLAND | OR | E | R | B | 5 | 18 | Y | 22 | 44 | 22 | M | 2003-05-15 |
1893 2 story Victorian with 10 inch lap siding and trim, painted grey with dark green trim, cedar shingle area on front. Want same or similar color. Needs 5 percent area scape and prime. | |||||||||||||
676 | OXFORD | MI | I | R | B | 0 | 0 | Y | 30 | 40 | 8 | H | 2003-05-15 |
675 | FAIRFIELD | OH | E | R | B | 4 | 11 | Y | 60 | 50 | 10 | M | 2003-05-14 |
674 | SACRAMENTO | CA | E | R | B | 0 | 0 | Y | 24 | 34 | 8 | H | 2003-05-14 |
wood siding patio cover.eve wood replaced.We 6 gallon house paint 2 gallons trim.Little or no prep required | |||||||||||||
673 | SHERMAN OAKS | CA | I | R | B | 3 | 1 | Y | 12 | 8 | 8 | M | 2003-05-14 |
Paint walls and textured ceiling for 2 bdrm 1 bath apartment. Need living room and 1 bedroom painted. Ceiling in both. | |||||||||||||
672 | SHERMAN OAKS | CA | I | R | B | 3 | 1 | Y | 12 | 8 | 8 | M | 2003-05-14 |
Paint walls and textured ceiling for 2 bdrm 1 bath apartment. Need living room and 1 bedroom painted. Ceiling in both. | |||||||||||||
671 | LEONARD | ND | E | R | W | 0 | 0 | Y | 32 | 0 | 40 | M | 2003-05-13 |
This is one end of a barn. Needs to be scraped. One coat would be OK, I would furnish the paint | |||||||||||||
670 | GULF GATE BRANCH | FL | E | R | B | 2 | 4 | Y | 25 | 50 | 10 | M | 2003-05-13 |
1100 sq ft house. looking for complete exterior painting. | |||||||||||||
669 | MARLTON LAKES | NJ | I | R | B | 0 | 0 | Y | 19 | 14 | 8 | H | 2003-05-13 |
668 | HUNTINGTON BEACH | CA | E | R | B | 0 | 0 | Y | 60 | 30 | 8 | H | 2003-05-12 |
667 | ALPHARETTA | GA | I | R | W | 0 | 0 | N | 0 | 0 | 0 | H | 2003-05-12 |
665 | PRINCE WILLIAM | VA | I | R | B | 15 | 23 | Y | 12 | 12 | 8 | H | 2003-05-11 |
Nearly all walls covered w/wall paper. Need painted 2200 sqft ceiling & 1 bedroom: 1 laundry rm, 1 pantry, 5 closets: chair railing/ceilng molding in 2 rms. Replace wall paper in foyer and stairway. | |||||||||||||
664 | GURLEYVILLE | CT | E | R | B | 2 | 18 | Y | 30 | 60 | 20 | H | 2003-05-10 |
Aprox 2500 Sq. Feet | |||||||||||||
663 | AURORA | CO | I | R | W | 3 | 5 | N | 60 | 30 | 10 | M | 2003-05-09 |
1500 square foot vacant home | |||||||||||||
662 | BRIDGEPORT | CT | E | R | W | 0 | 0 | N | 33 | 50 | 16 | L | 2003-05-09 |
need a final coat of solid stain, i will buy paint, sherwin williams brand, just the field, all moldings are perma white plastic, putting house on market, see my house on ISOLDMYHOUSE.COM- 519,000 TRUMBULL | |||||||||||||
661 | NEW YORK | NY | I | R | B | 6 | 0 | Y | 100 | 10 | 9 | H | 2003-05-08 |
Junior-4 apartment - 1000sf. Walls need some prep work -spackle some nail holes, etc. Ceilings need to be painted. | |||||||||||||
660 | NEW YORK | NY | I | R | B | 6 | 0 | Y | 100 | 10 | 9 | H | 2003-05-08 |
Junior-4 apartment - 1000sf. Walls need some prep work -spackle some nail holes, etc. Ceilings need to be painted. | |||||||||||||
659 | WEST CHESTER | PA | I | R | B | 1 | 5 | Y | 16 | 45 | 10 | H | 2003-05-08 |
One large room (used to be two but shared wall was removed.) One bedroom with vaulted ceiling, one wall with exposed brick and there are exposed wooden beams. | |||||||||||||
658 | SAN FRANCISCO | CA | E | R | B | 5 | 35 | Y | 1 | 230 | 30 | M | 2003-05-08 |
657 | OKLAHOMA CITY | OK | E | R | B | 2 | 7 | Y | 40 | 30 | 12 | H | 2003-05-07 |
656 | OKLAHOMA CITY | OK | E | R | B | 2 | 7 | Y | 40 | 30 | 12 | M | 2003-05-07 |
655 | SALISBURY MILLS | NY | I | R | B | 2 | 3 | N | 23 | 20 | 10 | H | 2003-05-07 |
654 | SALISBURY MILLS | NY | I | R | B | 2 | 3 | N | 23 | 20 | 10 | H | 2003-05-07 |
653 | COLUMBIA | MD | E | R | T | 3 | 11 | Y | 20 | 30 | 60 | H | 2003-05-07 |
It is a brick rowhome needing exterior paint basiclly trim and overhangs eves. ect. Right now I am just liking for prices not sure if it can be done right now. | |||||||||||||
652 | HOFFMAN EST | IL | I | R | B | 5 | 8 | Y | 12 | 12 | 8 | H | 2003-05-07 |
I am looking for an upstairs, 4 bedrooms, 2 bathrooms and the hallway, staircase and foyer | |||||||||||||
651 | GIG HARBOR | WA | E | R | B | 8 | 44 | Y | 40 | 40 | 16 | H | 2003-05-07 |
3000 sq ft, 5 year old, house with deck over garage garage, exterior only, top half natural cedar shakes, bottom "hardy" plank. Some calking required. Roof is busy, white trim, intersecting gables, overhang is varnish, daylight basement. Cedar Shakes have | |||||||||||||
650 | GIG HARBOR | WA | E | R | B | 8 | 44 | Y | 40 | 40 | 16 | H | 2003-05-07 |
3000 sq ft, 5 year old, house with deck over garage garage, exterior only, top half natural cedar shakes, bottom "hardy" plank. Some calking required. Roof is busy, white trim, intersecting gables, overhang is varnish, daylight basement. Cedar Shakes have | |||||||||||||
649 | ASHBURN | VA | E | R | T | 2 | 6 | Y | 0 | 0 | 0 | H | 2003-05-06 |
3 level TH with 2 bay windows (2levels) that are wood need scraped and painted - some minor wood replaced possibly. Also has some trim around door and roof edge. |