6557 Available Projects
From November 3, 2002 to Today
Contractors: please click on Login button above to login and submit bids on these projects.
Column heading buttons: click on to sort by (e.g. click on RC to see all commercial jobs first and residential jobs second, or click on State button to sort by State, etc.).
Column Definitions: ID=Reference Number, IE=Interior/Exterior, RC=Residential/Commercial, P=Paint Walls/Trim/Both, D=# of Doors, Win=# of Windows, OB=Overhang/Baseboard paint Yes/No, W=Width in feet, L=Length in feet, H=Height in feet, Q=Quality Low/Medium/High.
Results Page(s) (100 per page): 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66
ID | Ci | St | IE | RC | P | D | Win | OB | W | L | H | Q | Posted |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Description | |||||||||||||
205 | ALEXANDRIA | VA | I | R | W | 1 | 0 | N | 0 | 0 | 0 | M | 2003-01-29 |
Moving into a townhouse in Amberleigh, and would like a estimate for wall painting throughout, plus repainting door/trim in one bathroom. Rooms are living room, dining room, 2 bedrooms, 3 bathrooms, family room and a couple of hallways. Total squa | |||||||||||||
204 | BOX SPRINGS | CA | E | R | W | 3 | 16 | N | 0 | 0 | 12 | M | 2003-01-28 |
This is a residential home. One story with detached one car garage. The sq. footage of the home is approx. 1000 (including garage). We just need someone to do a decent job very quickly on this project. THANKS. | |||||||||||||
203 | QUEEN ANNE | WA | E | C | W | 0 | 0 | N | 250 | 150 | 99 | H | 2003-01-28 |
Existing 25 story EIFS condo building in Dallas. Needs painting of many small areas to repair patches in EIFS which do not match existing adjacent EIFS surfaces. Specification for repairs is available. Access to facade is limited and special scaffolding i | |||||||||||||
202 | NORTH SACRAMENTO | CA | I | R | B | 8 | 9 | Y | 75 | 86 | 8 | M | 2003-01-28 |
Interor residential (four bedroom one bath).Fill obvious holes, one good coat of paint. | |||||||||||||
201 | NORTH SACRAMENTO | CA | E | R | B | 3 | 9 | Y | 30 | 60 | 9 | M | 2003-01-28 |
Exterior residential rental (four bedroom).Fill obvious holes, power-wash, primer coat, one good coat of Medium priced paint. | |||||||||||||
200 | CHINO HILLS | CA | E | R | B | 4 | 17 | Y | 35 | 65 | 18 | H | 2003-01-27 |
STANDARD 2 STORY TRACT HOUSE - 8 FOOT CEILINGS.PATCH, SAND, PRIME. WOULD LIKE TO USE DUNN-EDWARDS ACRI-PLAT PAINT. OPTION - OWNER SUPPLIED PAINT | |||||||||||||
199 | CHINO HILLS | CA | E | R | B | 4 | 17 | Y | 35 | 65 | 18 | H | 2003-01-27 |
STANDARD 2 STORY TRACT HOUSE - 8 FOOT CEILINGS.PATCH, SAND, PRIME. WOULD LIKE TO USE DUNN-EDWARDS ACRI-PLAT PAINT. OPTION - OWNER SUPPLIED PAINT | |||||||||||||
198 | BENTLEYVILLE | OH | E | R | B | 3 | 14 | Y | 24 | 40 | 20 | H | 2003-01-27 |
The south side is in very bad shape, alligatoring and peeling to the wood. Desire complete paint removal to south side. Home built in 1898. 3 levels. | |||||||||||||
197 | KELLER | TX | E | R | B | 3 | 25 | Y | 60 | 40 | 25 | H | 2003-01-27 |
Need all exterior wood of house and garage painted, repaired as needed, including power wash, scrape, sand,window caulking and trim replacement as needed.10 year old house 2 story, 2700 sq ft home mostly brick detached garage | |||||||||||||
196 | HOLLYWOOD | FL | E | R | B | 2 | 9 | Y | 25 | 32 | 10 | H | 2003-01-27 |
1956 florida home 2/1 800sq ft. | |||||||||||||
195 | HOLLYWOOD | FL | E | R | B | 2 | 9 | Y | 25 | 32 | 10 | M | 2003-01-27 |
1956 florida home 2/1 800sq ft. | |||||||||||||
194 | PLANETARIUM STATION | NY | I | R | B | 5 | 7 | N | 15 | 20 | 8 | H | 2003-01-26 |
1150 sq.ft.,2 bedrooms, 2 baths, livingroom, dining room, kitchen, walk-in closet, ceilings | |||||||||||||
193 | PLANETARIUM STATION | NY | I | R | B | 5 | 7 | Y | 25 | 60 | 8 | H | 2003-01-26 |
1150 sq.ft.,2 bedrooms, 2 baths, livingroom, dining room, kitchen, walk-in closet, ceilings | |||||||||||||
192 | PLANETARIUM STATION | NY | I | R | B | 5 | 7 | Y | 25 | 60 | 8 | H | 2003-01-26 |
1150 sq.ft.,2 bedrooms, 2 baths, livingroom, dining room, kitchen, walk-in closet, ceilings | |||||||||||||
191 | WILM | NC | I | R | W | 0 | 0 | N | 12 | 12 | 8 | H | 2003-01-26 |
i would like a mural painter on my wall | |||||||||||||
190 | WILM | NC | I | R | W | 0 | 0 | Y | 0 | 0 | 0 | H | 2003-01-26 |
Mural | |||||||||||||
189 | BRIDGEPORT | IN | E | R | B | 4 | 13 | Y | 0 | 0 | 20 | H | 2003-01-26 |
BI-LEVEL HOME. WANTING IT PAINTED A DIFFERENT COLOR. THE HOUSE IS 2100 SQ. FT | |||||||||||||
188 | MARIETTA | GA | I | R | T | 3 | 9 | Y | 24 | 30 | 9 | M | 2003-01-25 |
I just need trim/moldings and windows and doors in Kitchen/breakfast room/family room. Windows are 6 feet high This is a 1 day/2man job. | |||||||||||||
187 | EDMONDS | WA | I | R | B | 0 | 0 | N | 18 | 20 | 12 | H | 2003-01-25 |
new construction | |||||||||||||
186 | BRIDGETOWN | OH | E | R | B | 2 | 18 | Y | 25 | 47 | 25 | M | 2003-01-25 |
The exterior walls are stucco. I'm looking to get a top to bottom job, exterior walls and trim. Including May as start date, but could be sooner depending on weather. | |||||||||||||
185 | BRIDGETOWN | OH | E | R | B | 2 | 18 | Y | 25 | 47 | 25 | M | 2003-01-25 |
The exterior walls are stucco. I'm looking to get a top to bottom job, exterior walls and trim. Including May as start date, but could be sooner depending on weather. | |||||||||||||
184 | SAN LEANDRO | CA | E | R | W | 0 | 0 | Y | 0 | 0 | 0 | H | 2003-01-24 |
I have a very old home and I want to paint it with that faux Italian or Spanish look It's only a one story and about 1600 sq. ft If you understand what I'm talking about please contact me Probably going to want done before April but NO later T | |||||||||||||
183 | PGH | PA | I | R | B | 0 | 0 | Y | 20 | 75 | 9 | H | 2003-01-24 |
This is a 4 story townhouse. I would like the entry foyer--main floor(open LR,DR- Kitchen) 2nd floo(Den Bedroom and bath) and 3rd floor loft (cathetral Cielings)Depending on cost I may decide do each floor as a separate project | |||||||||||||
182 | PORTLAND | OR | E | R | B | 4 | 7 | Y | 1 | 1 | 1 | H | 2003-01-24 |
2700 SF house Main level with day basement Attached garage. | |||||||||||||
181 | CEDAR HILL | TX | I | R | W | 0 | 1 | N | 3 | 5 | 8 | M | 2003-01-24 |
The area is an entryway with 16 ft. ceilings, plus the adjoining hallway (3x5x8 above). The entryway is approximately 6x7x16) | |||||||||||||
180 | LAKE LINGANORE | MD | E | R | T | 1 | 5 | Y | 24 | 50 | 30 | M | 2003-01-24 |
Basically I need to know how much it would cost to powerwash and restain 3 sides of a 2 story, cedar siding house 24ft deep approximately 50ft long. | |||||||||||||
179 | LAKE LINGANORE | MD | E | R | T | 1 | 5 | Y | 24 | 50 | 30 | M | 2003-01-24 |
Basically I need to know how much it would cost to powerwash and restain 3 sides of a 2 story, cedar siding house 24ft deep approximately 50ft long. | |||||||||||||
178 | LAKE LINGANORE | MD | E | R | T | 1 | 5 | Y | 24 | 50 | 30 | M | 2003-01-24 |
Basically I need to know how much it would cost to powerwash and restain 3 sides of a 2 story, cedar siding house 24ft deep approximately 50ft long. | |||||||||||||
177 | NORFOLK | VA | E | R | B | 3 | 22 | Y | 30 | 100 | 60 | H | 2003-01-24 |
This is a 75 Year old home. There is some prep work around face boards and windows. The entire house is stucco. Should be a fairly easy job. | |||||||||||||
176 | LAKE RIDGE | VA | I | R | W | 3 | 4 | N | 12 | 27 | 8 | M | 2003-01-24 |
2 rooms (study and formal LR) connected by French doors. Carpet is to be replaced immediately after job, so little floor protection prep required. Ceilings should be painted too. Dimensions are actually for both rooms combined. There is a wall seperat | |||||||||||||
175 | CORONA | CA | I | R | W | 0 | 0 | N | 60 | 30 | 9 | M | 2003-01-23 |
new construction | |||||||||||||
174 | JERSEY CITY | NJ | I | R | B | 5 | 0 | Y | 28 | 40 | 8 | M | 2003-01-23 |
This is a one bedroom apt with an open kitchen. The bedrrom is 15x20x8 and the living room is 13x20x8. The bathroom is 5x8x8. Thank you | |||||||||||||
173 | GULF BREEZE | FL | I | C | B | 2 | 0 | Y | 32 | 32 | 10 | H | 2003-01-23 |
interior office new drywall, already sanded. has 8 foot by 8 foot glass door and two 10 by 10 windows that need taping up | |||||||||||||
172 | DANVERS | MA | I | R | W | 0 | 0 | N | 83 | 73 | 7 | H | 2003-01-23 |
Need wallpaper removed from 70 percent of the walls House built 1835 not high ceilings Need one 12x15 ceiling redone too | |||||||||||||
169 | TAFT | CA | E | R | B | 2 | 9 | N | 24 | 64 | 12 | M | 2003-01-22 |
This is a mobile home which was painted 7 years ago, but I hate the color (pink). The siding is some kind of pressed wood panels. I want a med-dark sage with white trim. | |||||||||||||
168 | BLACKLICK | OH | E | R | T | 1 | 5 | Y | 50 | 50 | 8 | H | 2003-01-22 |
2 story home, 5 yrs old, picture available to send via email if need to see for quote. Want trim, garage door, front door. | |||||||||||||
167 | LUSBY | MD | I | R | B | 3 | 12 | Y | 28 | 40 | 8 | M | 2003-01-22 |
Standard 3 bed, 2 bath Cape Cod. 1120 base sq. ft. 560 upstairs. Need entire interior painted (house going on the market in Feb.). | |||||||||||||
166 | ULM | AR | E | R | B | 0 | 0 | Y | 30 | 58 | 10 | L | 2003-01-22 |
I need the back side of my house to be touched up to show. I'm selling my house and want it not to look like wood. Just the back side. Also want to touch up the trim on the front where nails & staples have been for christmas lights. | |||||||||||||
165 | ULM | AR | E | R | B | 0 | 0 | Y | 30 | 58 | 10 | L | 2003-01-22 |
I need the back side of my house to be touched up to show. I'm selling my house and want it not to look like wood. Just the back side. Also want to touch up the trim on the front where nails & staples have been for christmas lights. | |||||||||||||
164 | NEW YORK | NY | I | R | B | 2 | 2 | Y | 12 | 14 | 9 | M | 2003-01-21 |
Living room to be painted. Three walls (including cabinets) plus one wall of built-in shelves. Ceiling to be painted as well. No preparations/treatments to walls. | |||||||||||||
163 | DULLES | VA | I | R | B | 15 | 7 | Y | 14 | 16 | 10 | M | 2003-01-21 |
Townhouse Living Room 10ft ceiling approx 16x16 Going up stairs 10ft ceiling Small Upstairs Hallway 8ft ceiling 2x5 2-3 bedrooms 8ft ceilings 2 at approx 16x14 and 1 at approx 14x12 Lower Level Rec Room 8ft ceiling approx 18x16. | |||||||||||||
162 | NEWNAN | GA | I | R | B | 15 | 20 | Y | 60 | 40 | 10 | H | 2003-01-20 |
161 | PHILA | PA | E | R | B | 1 | 1 | N | 1 | 1 | 1 | M | 2003-01-20 |
Have to much work and do not want to lose a good prospect We are your company Looking to gain some SubContract work, please contact me at the above email address or 215 533 5944. | |||||||||||||
160 | CUPERTINO | CA | I | R | B | 11 | 12 | Y | 200 | 300 | 8 | M | 2003-01-20 |
I need the interior of my home to be repainted. Size appox. 1900 sq.ft. May also need to remove the popcorn ceiling. | |||||||||||||
159 | LAKE WORTH | FL | E | R | B | 1 | 10 | Y | 25 | 30 | 8 | M | 2003-01-20 |
155 | CUPERTINO | CA | I | R | B | 11 | 12 | Y | 200 | 300 | 8 | M | 2003-01-20 |
I need the interior of my home to be repainted. Size appox. 1900 sq.ft. May also need to remove the popcorn ceiling. | |||||||||||||
154 | WASHINGTON TWPS | NJ | I | R | B | 2 | 2 | Y | 20 | 15 | 14 | H | 2003-01-20 |
Want family room painted...has cathedral ceilings..room is about 20 x 15. Also want two stairways painted (about 7 stairs in length each). Trim on doors and moulding, radiators. | |||||||||||||
153 | BELMONT HEIGHTS | UT | I | R | B | 2 | 7 | Y | 25 | 45 | 12 | H | 2003-01-20 |
7 year-old house that needs paint on ceiling as well...about 1800 sq feet | |||||||||||||
152 | BELMONT HEIGHTS | UT | I | R | B | 2 | 7 | Y | 25 | 45 | 12 | H | 2003-01-20 |
7 year-old house that needs paint on ceiling as well...about 1800 sq feet | |||||||||||||
151 | VANCOUVER | WA | E | R | B | 3 | 8 | Y | 72 | 40 | 10 | H | 2003-01-19 |
Single story, 3 car garage (garage doors also need painting) | |||||||||||||
150 | SAN DIEGO | CA | E | R | B | 1 | 12 | Y | 40 | 60 | 12 | H | 2003-01-19 |
1614 sq. ft house, wood board on front, stucco on sides and back. All need prep and painting. No paint on vinyl window trim or garage door. | |||||||||||||
149 | SCOTTSDALE | AZ | I | R | W | 2 | 2 | N | 12 | 12 | 10 | M | 2003-01-17 |
2-3 bedrooms and 3-4 closets. just walls - have wood stained trim. Just looking for a lobor cost because I have a paint conection. This will be for my mother's home in scottsdale but I just do not have the time to do it myself. thanks... | |||||||||||||
148 | SCOTTSDALE | AZ | I | R | W | 2 | 2 | N | 12 | 12 | 10 | M | 2003-01-17 |
2-3 bedrooms and 3-4 closets. just walls - have wood stained trim. Just looking for a lobor cost because I have a paint conection. This will be for my mother's home in scottsdale but I just do not have the time to do it myself. thanks... | |||||||||||||
147 | PUYALLUP | WA | E | R | B | 4 | 8 | Y | 30 | 65 | 30 | H | 2003-01-17 |
146 | WASHINGTON | DC | I | R | W | 5 | 5 | N | 27 | 25 | 8 | M | 2003-01-16 |
kitchen and dining room and hallway to be painted. owner already has purchased paint for both rooms. | |||||||||||||
145 | ADELPHI | MD | I | R | W | 0 | 0 | N | 0 | 50 | 28 | M | 2003-01-16 |
We would like someone to paint the ceiling of our ballroom. THe ceilings are slanted, and are 16' high at the peak, so you'd need a good ladder or scaffolding. | |||||||||||||
144 | SAN DIEGO | CA | E | R | B | 3 | 10 | Y | 120 | 100 | 12 | M | 2003-01-15 |
Exterior of small single story house that has wood shingle siding and very minimal trim and small overhang. One garage door, 2 other doors. 2 colors, trim and walls. Some chipped trim paint. Start/finish dates not that important...And staining of wooden f | |||||||||||||
143 | SAN DIEGO | CA | E | R | B | 3 | 10 | Y | 120 | 100 | 12 | M | 2003-01-15 |
Exterior of small single story house that has wood shingle siding and very minimal trim and small overhang. One garage door, 2 other doors. 2 colors, trim and walls. Some chipped trim paint. Start/finish dates not that important...And staining of wooden f | |||||||||||||
142 | NEW YORK CITY | NY | I | C | B | 1 | 6 | Y | 30 | 30 | 12 | M | 2003-01-15 |
Need to repaint, in white, interior office space, which is made up of 2 small rooms. About 1000sqft or so (needs to be measured), and maybe 12ft. high. There are pipes and fixtures along the ceilings. Flexible start. | |||||||||||||
141 | GREENWD | IN | I | R | B | 2 | 0 | Y | 60 | 30 | 8 | M | 2003-01-15 |
I'm not sure of measurements. The house is a 1330 square foot home. There is no need to paint the ceilings. It is a Dura-built home with normal ceiling height except for the great room. Just want white semi-gloss paint. | |||||||||||||
140 | COMO | MS | I | R | W | 0 | 0 | N | 0 | 0 | 0 | H | 2003-01-14 |
1 bdr 24 x 28 x 9, 1 bdr 28 x 28 x 9, 1 bdr 28 x 32 x 9, dining room 24 x 28 x 9, living room 40 x 16 x 9, kitchen 38 x 32 x 9, laundry room 14 x 16 x 9, hallway 28 x 24 x 9 | |||||||||||||
139 | BRONX | NY | I | R | B | 3 | 2 | Y | 11 | 16 | 8 | M | 2003-01-14 |
138 | TACOMA | WA | E | R | B | 1 | 9 | Y | 36 | 35 | 17 | M | 2003-01-14 |
2000sq' day basement. 1 floor in front with sides slopping to 2 floor in back. Located in the Northeast Tacoma/Federal Way area. | |||||||||||||
137 | CONCORD | NC | I | R | B | 1 | 2 | Y | 18 | 20 | 11 | H | 2003-01-14 |
The area that is to be painted is the living room / dining room and hallway. There are 2 windows in the living room and 1 door. The room is vaulted but hallway is only 8 feet tall. | |||||||||||||
136 | KETTERING | MD | I | R | B | 5 | 0 | Y | 200 | 200 | 20 | H | 2003-01-14 |
135 | KETTERING | MD | I | R | B | 5 | 0 | Y | 200 | 200 | 20 | H | 2003-01-14 |
133 | JACKSONVILLE | FL | E | R | B | 3 | 12 | Y | 50 | 22 | 35 | M | 2003-01-14 |
I own a residence, 2 story, 2300 sq ft, Repaint same color (white). Need work completed asap | |||||||||||||
132 | BARRINGTON | RI | I | R | B | 8 | 9 | Y | 60 | 30 | 8 | M | 2003-01-13 |
not sure what width and length mean,,but we want 5 rooms done,,living rm,,small bath,, small kitchen,,,two bedrooms..all rooms are on small side,,ceilings are 9 feet... | |||||||||||||
131 | AURORA | CO | E | R | B | 1 | 7 | Y | 50 | 30 | 20 | M | 2003-01-13 |
We have a two story, 1360 sq. foot home. I'm not exactly sure how that translates into exterior space but I gave it my best guess. We will also need some of the trim boards replaced. We are VERY flexible with our dates but need to have the project | |||||||||||||
130 | DOUGLASVILLE | GA | E | R | B | 4 | 15 | Y | 3 | 100 | 4 | H | 2003-01-13 |
Exterior paint job, windows, doors, carport, overhang/soffets, 8 sheets T1-11 siding (rest house is brick - not paint), 15 windows, possible interior touch up trim and ceiling. | |||||||||||||
129 | HARLEYSVILLE | PA | I | R | B | 1 | 1 | Y | 25 | 12 | 16 | H | 2003-01-12 |
Living room and dining room, both are currently wallpapered. Need to strip wall paper and then paint both rooms same color. Living room has catherdal ceiling. Dimension is based on living room only. Dining room is very small. | |||||||||||||
128 | BETHESDA | MD | E | R | B | 5 | 50 | Y | 100 | 125 | 12 | M | 2003-01-12 |
I need to repaint the entire exterior, and much of the interior of my home. | |||||||||||||
127 | NEW YORK | NY | I | R | B | 6 | 6 | Y | 115 | 10 | 8 | H | 2003-01-11 |
2 Bedroom 2 Bath 1150 sq feet. Apartment will be empty, no furniture. No repairs needed, just normal nail holes, etc. Protect all surfaces with sheets and tarps. Sand all walls and prepare for painting. Two coats required on all walls. Closet, Paint clos | |||||||||||||
126 | STATEN ISLAND | NY | I | R | W | 0 | 0 | N | 0 | 0 | 0 | M | 2003-01-10 |
buying house... want to paint interior.3 bedrooms upstairs... living room downstairs. | |||||||||||||
125 | FORT WORTH | TX | E | R | B | 0 | 0 | Y | 103 | 0 | 7 | H | 2003-01-10 |
Exterior paint of home. House is maily brick, but there is some wood areas and trim. The house is very dark brown, want to go to a sandy beige | |||||||||||||
124 | ZIONSVILLE | IN | I | R | B | 1 | 0 | Y | 14 | 11 | 9 | M | 2003-01-10 |
123 | ZIONSVILLE | IN | I | R | W | 1 | 0 | N | 14 | 11 | 9 | M | 2003-01-10 |
113 | YONKERS | NY | I | R | B | 4 | 0 | Y | 0 | 0 | 0 | H | 2003-01-09 |
The apartment is 750 square ft. The walls need to be stripped. Im not sure whats on the walls it could be stucco or just old built up paint, its about 1/16 of an inch thick and its cracking and comes right off. Some parts of the walls need to be plaste | |||||||||||||
112 | WICHITA | KS | E | R | W | 2 | 0 | N | 0 | 0 | 0 | M | 2003-01-09 |
front, one side, and two sections on the back of the house, all painted in white: front 9 X 50 north side 9 X 25 back section 9 X 10 back section 9 X 20 | |||||||||||||
111 | OKLAHOMA CITY | OK | I | C | B | 2 | 2 | N | 10 | 18 | 8 | H | 2003-01-09 |
110 | MARSHALLTON | DE | I | R | B | 6 | 3 | Y | 45 | 45 | 8 | M | 2003-01-08 |
Bottom floor interior of house - 2 main rooms - 11x16 and 11x19, with square arched openings to each, hall way, and stairs up to and including landing with 4 doors and doorframes. | |||||||||||||
109 | DALLAS | TX | E | R | T | 4 | 12 | Y | 50 | 60 | 20 | H | 2003-01-07 |
108 | CINCINNATI | OH | E | R | T | 2 | 8 | Y | 60 | 30 | 8 | M | 2003-01-07 |
We have a 2200 square foot home probably what your average home is listed as. It has aluminum siding and brick. Basically what needs painting is the trim around the windows, siding, two bay windows(one is over a pond), a small front porch with a rail. | |||||||||||||
107 | LAWRENCEVILLE | GA | E | R | T | 4 | 9 | Y | 30 | 60 | 12 | H | 2003-01-06 |
Adding vinyl siding. Need paint on basement stucco,12" soffits on each end of house, porch railing front and back,ceiling on front porch,decorative tooth molding on front of porch and garage. | |||||||||||||
106 | CARROLLTOWNE | MD | I | R | B | 0 | 0 | Y | 0 | 0 | 12 | H | 2003-01-06 |
Need the whole house painted. lvrm: 17x12 dnrm: 12x10 kitc: 15x11 msbrm: 15x12 2brm: 11x11 3brm: 12x11 4brm: 11x9 fmrm: 15x12 hallways,bthrms | |||||||||||||
105 | CARROLLTOWNE | MD | I | R | B | 0 | 0 | Y | 0 | 0 | 12 | H | 2003-01-06 |
Need the whole house painted. lvrm: 17x12 dnrm: 12x10 kitc: 15x11 msbrm: 15x12 2brm: 11x11 3brm: 12x11 4brm: 11x9 fmrm: 15x12 hallways,bthrms | |||||||||||||
104 | ELM GROVE | WI | I | R | W | 0 | 0 | N | 9 | 9 | 9 | H | 2003-01-05 |
Faux painting, base color w/ color glaze overcoat | |||||||||||||
103 | MINNEAPOLIS | MN | I | R | W | 4 | 7 | N | 50 | 42 | 8 | M | 2003-01-04 |
We would like an estimate for painting one living room 20 x 14, and 2 bedrooms 14 x 12, and 16 x 16. We would like an off-white color. | |||||||||||||
101 | PHOENIX | AZ | I | R | B | 4 | 4 | Y | 0 | 0 | 0 | M | 2003-01-04 |
I need 2 hallways, a main room, and a laundry room painted. The doors in one hall will need painting as well. I will buy paint and supplies. Just need someone to do work. | |||||||||||||
100 | BOWIE | MD | I | R | B | 0 | 1 | Y | 9 | 14 | 16 | H | 2003-01-04 |
paint foyer, crown molding, stairwell, baseboards | |||||||||||||
99 | TULSA | OK | E | R | B | 3 | 18 | N | 20 | 30 | 25 | M | 2003-01-03 |
Need outside of house painted. There are windows, but not too much trim. About 25-50 percent of the house is brick. I would also like caulking work done around the windows, if possible. | |||||||||||||
98 | GILBERT | AZ | I | R | W | 0 | 0 | Y | 60 | 40 | 10 | M | 2003-01-01 |
Re-paint entry, living room, family room, hallway, and 3 bedrooms. | |||||||||||||
97 | ORANGE PARK | FL | E | R | B | 3 | 17 | Y | 6 | 65 | 12 | H | 2002-12-09 |
this is a custom home re paint that requires a high quality finish some area's need excessive caulking. | |||||||||||||
96 | MIAMI | FL | I | R | B | 5 | 7 | Y | 32 | 30 | 9 | H | 2002-12-04 |
I HAVE A 1 BEDROOM 1 1/2 BATHROOM | |||||||||||||
95 | PHOENIXVILLE | PA | E | R | B | 99 | 99 | Y | 999 | 999 | 99 | M | 2002-12-03 |
94 | ENGLISH CREEK | NJ | I | R | B | 3 | 0 | Y | 20 | 24 | 30 | M | 2002-12-02 |
1 bd, 1 ba condo w/ cath ceiling. Ceil needs repair of tape in seam and paint L/R, hall, Bd, Ba. No closets, just woodwork in small kitchen | |||||||||||||
87 | ANTIOCH | TN | I | R | B | 2 | 2 | Y | 20 | 20 | 15 | H | 2002-11-27 |
86 | NEW YORK | NY | I | R | B | 2 | 2 | Y | 30 | 50 | 10 | H | 2002-11-27 |
Manhattan Place Condominium 630 First Ave.,Manhattan,N.Y.,N.Y. Unit 31B 670 sq.ft 1Bedroom 1Livingroom 1Bath 1Kitchen 2Closets with doors, Ceiling Primer first plus two coats Benjamin Moore painting | |||||||||||||
85 | BOWIE | MD | I | R | B | 12 | 16 | Y | 4 | 200 | 7 | M | 2002-11-27 |
HUD home being prepared for resale. Cape with 2 bd and a bath down and 2 bd and a bath up. kitc, dr & lr down. Needs quick touch up on exterior | |||||||||||||
84 | CHESTNUT STREET | IL | I | R | W | 2 | 4 | N | 21 | 21 | 10 | M | 2002-11-26 |
My landlord is selling the studio condo that I am renting. I have the main room primary yellow, the bathroon primary red, and the kitchen is primary blue. I need it returned to white. I am looking for a quick, inexpensive job that is passable. |