6557 Available Projects
From November 3, 2002 to Today
Contractors: please click on Login button above to login and submit bids on these projects.
Column heading buttons: click on to sort by (e.g. click on RC to see all commercial jobs first and residential jobs second, or click on State button to sort by State, etc.).
Column Definitions: ID=Reference Number, IE=Interior/Exterior, RC=Residential/Commercial, P=Paint Walls/Trim/Both, D=# of Doors, Win=# of Windows, OB=Overhang/Baseboard paint Yes/No, W=Width in feet, L=Length in feet, H=Height in feet, Q=Quality Low/Medium/High.
Results Page(s) (100 per page): 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66
ID | Ci | St | IE | RC | P | D | Win | OB | W | L | H | Q | Posted |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Description | |||||||||||||
83 | CHESTNUT STREET | IL | I | R | W | 2 | 4 | N | 21 | 21 | 10 | M | 2002-11-26 |
My landlord is selling the studio condo that I am renting. I have the main room primary yellow, the bathroon primary red, and the kitchen is primary blue. I need it returned to white. I am looking for a quick, inexpensive job that is passable. | |||||||||||||
82 | CHESTNUT STREET | IL | I | R | B | 2 | 4 | N | 21 | 21 | 10 | M | 2002-11-26 |
This is a studio apartment. Aprox. 550 sq ft. The main room is primary yellow, the bathrrom rpimary red and the kitchen primary blue. I need the place returned to white b/c the owner is selling the place. I jsut need a quick, cheap passable job...let | |||||||||||||
81 | EAU CLAIRE | MI | E | R | W | 0 | 0 | N | 11 | 19 | 0 | M | 2002-11-26 |
remove trim and paint 2 coats on 19 by 11 cieling and replace trim | |||||||||||||
80 | CEDAR MILL | OR | I | R | W | 0 | 0 | Y | 30 | 70 | 10 | H | 2002-11-26 |
4,500 SF house needs interior paint and not on trim walls only need paint may also need cieling paint | |||||||||||||
79 | CHARLOTTE | NC | I | R | B | 3 | 2 | N | 60 | 84 | 8 | H | 2002-11-25 |
Master Bedroom and Bathroom needs to have wallpaper removed from Cardboard facing drywall, then drywall finish applied to patch bad spots, primed and painted. 7 plus walls but not an easy job of removing wallpaper. | |||||||||||||
76 | MOHRSVILLE | PA | I | R | W | 0 | 0 | N | 20 | 40 | 25 | H | 2002-11-24 |
72 | SALINE | MI | I | R | B | 8 | 9 | Y | 60 | 30 | 8 | M | 2002-11-23 |
71 | ELK RIVER | MN | I | R | W | 0 | 0 | N | 20 | 14 | 12 | H | 2002-11-22 |
large bedroom that has vaulted ceilings. Color would be dark-maroon | |||||||||||||
70 | ELK RIVER | MN | I | R | W | 0 | 0 | N | 20 | 14 | 12 | M | 2002-11-22 |
large bedroom that has vaulted ceilings. Color would be dark-maroon | |||||||||||||
69 | SAN FRANCISCO | CA | E | R | B | 4 | 25 | Y | 25 | 80 | 40 | H | 2002-11-21 |
Pressure wash exterior. stripping, scraping, sanding, primer, some new wood, some weathered. some caulking needed. Two sets of stairs, porch, railing, no balconies. Pratt & Lambert paints only except front stucco: BMoore. Same and similar to existing col | |||||||||||||
68 | ELKTON | MD | E | R | B | 3 | 28 | Y | 100 | 75 | 99 | H | 2002-11-21 |
Victorian home on Main St., Elkton MD Queen Anne Style we want to use up to 8 colors | |||||||||||||
67 | NEW LENOX | IL | I | R | W | 0 | 0 | N | 0 | 0 | 0 | H | 2002-11-20 |
What I need is someone to tape, mud and paint a house approx 1000sq feet in all.upstairs and downstairs, 2 high ceilings, all one color of white, must be experienced with taping so paint job looks great. only serious experienced bidders please | |||||||||||||
66 | MIAMI | FL | I | R | B | 5 | 6 | Y | 30 | 30 | 8 | H | 2002-11-19 |
1 bedroom 1 1/2 bathroom 900sft. I want to remuve the pop corn in the apartment.a also remuve the kitchen cabinet and put nuw one. the side is 10'by 8'. | |||||||||||||
65 | BOULDER | CO | E | R | B | 1 | 12 | Y | 50 | 60 | 20 | M | 2002-11-18 |
64 | VENTURA | CA | E | R | B | 3 | 15 | Y | 60 | 30 | 10 | M | 2002-11-17 |
63 | ATLANTIC BEACH | FL | E | R | B | 2 | 6 | Y | 45 | 52 | 9 | H | 2002-11-15 |
Home has a brick front with a small front porch that will require painting along with a gable above the garage door. Garage door is one of the 2 doors to be painted. The front door is the other. | |||||||||||||
62 | HORSHAM | PA | E | R | B | 6 | 12 | N | 20 | 20 | 12 | M | 2002-11-14 |
Small Town Home. Living room, 3 Bedrooms, Stairs (1), Hallway (2), Kitchen and dinning room. | |||||||||||||
61 | CITRUS HEIGHTS | CA | E | R | B | 3 | 7 | Y | 45 | 45 | 15 | M | 2002-11-14 |
House is 1345 square feet with T1-11 on the front and stucco on the sides and rear. | |||||||||||||
60 | ROYERSFORD | PA | I | R | B | 1 | 4 | Y | 12 | 18 | 8 | M | 2002-11-13 |
59 | FORT WORTH | TX | I | R | B | 1 | 6 | Y | 28 | 32 | 8 | H | 2002-11-13 |
58 | FORT WORTH | TX | I | R | B | 1 | 6 | Y | 28 | 32 | 8 | H | 2002-11-13 |
57 | DANIELS | MD | I | R | B | 2 | 0 | Y | 0 | 0 | 0 | M | 2002-11-13 |
Need a few nail pops repaired, ceiling and walls painted in following: 2-story family room (18x20) w/8 windows, 0 doors and master bedroom/sitting rm & bath with cathedral ceiling (4 doors, 6 windows). | |||||||||||||
56 | FALLS CHURCH | VA | E | R | B | 2 | 1 | Y | 12 | 20 | 8 | M | 2002-11-13 |
Free-standing garage. Will need some sanding/prep work. May need more than one coat. | |||||||||||||
37 | ASTRODOME | TX | I | R | T | 25 | 0 | N | 0 | 0 | 0 | H | 2002-11-12 |
Approximately 40 linear ft of top and bottom kitchen cabinets need to be stained. Would like 2 coats of polyurethane. | |||||||||||||
36 | GIBSONIA | PA | I | R | B | 9 | 0 | N | 0 | 0 | 0 | M | 2002-11-11 |
This project is a kitchen, family room, powerder room, entrance way, and a upstairs hall. All the walls are the same color. and the base boards and doors will be painted white. | |||||||||||||
35 | OKLAHOMA CITY | OK | I | R | W | 0 | 0 | N | 5 | 12 | 10 | H | 2002-11-11 |
bathroom - currently painted dark purple, but want it a light color. the ceiling also is painted and would need to be painted over. | |||||||||||||
34 | BARCLAY | IL | I | R | W | 0 | 0 | N | 62 | 44 | 8 | M | 2002-11-11 |
One of the rooms, 16 X 17 has cathedral ceilings. The other rooms are a hallway 22 X 3, a dining room 12 X 13, and a kitchen 12 X 12. | |||||||||||||
33 | WHITMAN | MA | I | R | B | 4 | 2 | N | 17 | 22 | 7 | M | 2002-11-11 |
Paint interior stairway, small hallway and 12X14 bedroom. Paint doors and trim. Same color or darker than what is currently there. | |||||||||||||
32 | LOUISVILLE | CO | E | R | B | 2 | 25 | Y | 35 | 45 | 30 | H | 2002-11-10 |
30 | SEATTLE | WA | I | R | W | 0 | 0 | N | 10 | 32 | 10 | H | 2002-11-08 |
2 rooms 1)10x12 8 ft ceiling 2)20x 12 10 ft ceiling | |||||||||||||
29 | RINCON | AZ | I | R | B | 4 | 0 | Y | 0 | 0 | 0 | M | 2002-11-08 |
i'm not sure of the width length and height but it's 1200 sq ft and i want it painted from top to bottom | |||||||||||||
28 | MIDDLETOWN | VA | I | R | B | 6 | 12 | Y | 50 | 20 | 8 | H | 2002-11-08 |
House is small -- 894 square feet | |||||||||||||
27 | LEXINGTON | KY | I | R | B | 8 | 7 | Y | 96 | 99 | 10 | M | 2002-11-07 |
26 | LEXINGTON | KY | I | R | B | 8 | 7 | Y | 60 | 30 | 10 | H | 2002-11-07 |
Two year-old house with original light beige paint and white trim. Needs to be repainted throughout. I plan to use a darker beige and white trim throughout. Several "nail pops" which need to be fixed. I want all nail holes filled prior to painting | |||||||||||||
25 | ORCHARD PARK | NY | I | R | B | 0 | 2 | Y | 23 | 16 | 16 | H | 2002-11-07 |
Great room, ceiling slopes on both sides, barn style, and has two skylights. Ceiling requires painting as well as walls. One wall has dry bar, another is cut to include another bar shared with the kitchen. Another wall has a fireplace/mantel and two trian | |||||||||||||
24 | GLENDALE | CA | I | R | B | 5 | 5 | Y | 36 | 22 | 8 | H | 2002-11-06 |
3 bedrooms, approximately 11 x 13 each Hallway about 13 feet long family room about 15X15 Living room has an 8'(W) wall, 2 - 12' walls and a 20' wall with a big window. | |||||||||||||
23 | MOUNTAIN VIEW | CA | I | R | B | 3 | 0 | N | 20 | 40 | 15 | H | 2002-11-06 |
Requesting bid for interior house 1000 sq. ft including ceiling | |||||||||||||
22 | MOUNTAIN VIEW | CA | I | R | B | 3 | 0 | N | 20 | 40 | 15 | H | 2002-11-06 |
Requesting bid for interior house 1000 sq. ft including ceiling | |||||||||||||
21 | OCEANSIDE | CA | I | R | B | 5 | 10 | N | 38 | 31 | 8 | M | 2002-11-06 |
2100 SQ Feet 2 Story Home. 4 Bedroom Family Room/kitchen area 26X 13X 8 Living Room/Dining room Area 21X 12X 15 Master Bedroom 14'X 13' X 10' Bonus Room 20.5X12x8 Bedroom 2 downstairs 12x 12X 8 | |||||||||||||
20 | DEVON | PA | I | R | B | 3 | 3 | Y | 11 | 17 | 7 | H | 2002-11-06 |
please include ceiling as well. also, the room has many cracks in the plaster on walls and ceiling. | |||||||||||||
19 | HOWELL | MI | I | R | B | 6 | 8 | N | 50 | 40 | 26 | H | 2002-11-06 |
New construction. no flooring in yet. 1700 SQft three bedroom 2.5 bath | |||||||||||||
18 | SOUTHPORT | CA | I | R | B | 12 | 9 | Y | 99 | 102 | 8 | M | 2002-11-04 |
We just purchased this house, and we want to have the entire interior painted prior to actually moving in. There is paneling in a couple of rooms that we'd like painted over, as well as all the kitchen cabinets. The rest of the house is regular drywall. W | |||||||||||||
17 | RANCHO SANTA MARGARITA | CA | E | R | B | 2 | 0 | Y | 6 | 180 | 8 | M | 2002-11-04 |
one coat of good paint and not much prep needed | |||||||||||||
16 | BALLARDSVILLE | MS | I | C | W | 0 | 0 | N | 50 | 100 | 20 | M | 2002-11-03 |
church gym. painting two walls that are metal. one wall is 100' long and the other is 50' wide. both walls are 20' high | |||||||||||||
14 | PHOENIX | AZ | I | C | B | 10 | 0 | Y | 0 | 742 | 12 | M | 2002-11-02 |
I need a quote for interior walls -no ceiling- in Phoenix, AZ. 85032 approx 8866 square feet. | |||||||||||||
13 | GREENVILLE | RI | E | R | B | 0 | 0 | Y | 26 | 38 | 8 | H | 2002-11-01 |
I started the project this summer and have been too busy to finish. I only have about a quarter done. I would at least like to finish the prep and get primer on it before it gets too cold. | |||||||||||||
12 | MBORO | TN | E | R | B | 2 | 1 | Y | 16 | 12 | 8 | H | 2002-10-24 |
master bedroom | |||||||||||||
11 | MINNEAPOLIS | MN | E | R | B | 2 | 28 | Y | 44 | 24 | 12 | H | 2002-10-23 |
10 | JONESBORO | AR | I | R | B | 17 | 15 | Y | 70 | 40 | 8 | H | 2002-10-23 |
2800 Square foot house. 13 Windows w/2 in garage. 13 Interior doors. 3 Exterior doors. 1 door for garage storage room. Walls & Trim. Ceiling in living room vaulted to 14 feet. | |||||||||||||
9 | BROOKLYN | NY | I | R | B | 0 | 0 | Y | 10 | 20 | 8 | H | 2002-10-21 |
Faux finish, venetian plaster | |||||||||||||
8 | MINNEAPOLIS | MN | E | R | B | 5 | 10 | Y | 45 | 48 | 12 | M | 2002-10-21 |
7 | NAPERVILLE | IL | I | R | W | 2 | 2 | N | 12 | 15 | 8 | H | 2002-10-21 |
6 | NAPERVILLE | IL | I | R | W | 2 | 2 | N | 12 | 15 | 8 | H | 2002-10-21 |
5 | MONROE | NC | I | R | B | 12 | 14 | Y | 12 | 20 | 8 | M | 2002-10-17 |
4 | VISALIA | CA | E | R | W | 2 | 10 | N | 30 | 70 | 20 | L | 2002-10-17 |
old victorian needs touch up | |||||||||||||
3 | BOULDER CITY | NV | E | R | B | 6 | 12 | Y | 20 | 20 | 20 | M | 2002-10-16 |
678 square feet of space some high cellings | |||||||||||||
1 | MAPLECREST | NJ | E | R | B | 2 | 22 | Y | 26 | 36 | 21 | H | 2002-10-12 |
Front porch needs to be painted. Exposed masonry of basement also needs to be repainted. House is 2 floors with an attic. Attic walls only on two sides (roof comes to top of 2nd floor on other two sides) |